Area |
Chapter |
Title |
Issue Date |
CN Number |
Word |
IP |
Inspection Procedures |
IP |
30050 |
Construction Permit Corporate Management Meeting |
11/01/07 |
07-034 |
IP |
30703 |
Management Meetings Entrance and Exit Interviews |
02/15/08 |
08-008 |
.doc |
IP |
30800 |
Initial Management Meeting Materials Licensees |
10/01/76 |
76-026 |
IP |
35002 |
Early Site Permit Pre-Docketing Quality Assurance Controls Meeting |
05/29/03 |
03-018 |
.doc |
IP |
35004 |
Pre-Docketing Early Site Permit Quality Assurance Controls Inspection |
05/29/03 |
03-018 |
.doc |
IP |
35005 |
Pre-Application Quality Assurance Program Audit |
10/03/07 |
07-030 |
.doc |
IP |
35006 |
Post-Docketing Early Site Permit Quality Assurance Controls Inspection |
05/29/03 |
03-018 |
.doc |
IP |
35012 |
Early Site Permit Quality Assurance Controls Assessment and Conclusion |
05/29/03 |
03-018 |
.doc |
IP |
35017 |
Quality Assurance Implementation Inspection |
07/29/08 |
08-021 |
.doc |
IP |
35020 |
Inspection of Applicant’s Surveillance of Contractor Quality
Assurance (QA) Activities |
06/22/05 |
05-016 |
.doc |
IP |
35021 |
Post-Docketing Implementation of Quality Assurance (QA) Activities
Related to Design, Procurement and Construction |
06/22/05 |
05-016 |
.doc |
IP |
35025 |
Inspection of COL Holder's Surveillance of Contractor Quality Assurance Activities |
10/03/07 |
07-030 |
.doc |
IP |
35029 |
Pre-Combined License (COL) Quality Assurance (QA) Inspection of
Site Limited Work Authorization (LWA) 1 & 2 Activities |
06/22/05 |
05-016 |
.doc |
IP |
35060 |
Licensee Management of QA Activities |
10/16/07 |
07-032 |
IP |
35061 |
In-Depth QA Inspection of Performance |
11/01/07 |
07-034 |
IP |
35065 |
Procurement, Receiving, and Storage |
10/16/07 |
07-032 |
IP |
35100 |
Review of the QA Manual |
06/22/05 |
05-016 |
.doc |
IP |
35101 |
QA Program Implementation Inspection for Operational Programs |
10/03/07 |
07-030 |
.doc |
IP |
35301 |
Preoperational Testing - Quality Assurance |
08/06/03 |
03-025 |
.doc |
IP |
35501 |
QA for the Startup Test Program |
01/20/84 |
84-004 |
IP |
35750 |
QA Program Measuring And Test Equipment |
11/13/08 |
08-032 |
.doc |
IP |
35752 |
Part 52 - Procurement Control & Receipt, Storage and Handling of Equipment and Materials |
10/03/07 |
07-030 |
.doc |
IP |
35753 |
QA Program - Control of Tests & Measuring and Test Equipment |
10/03/07 |
07-030 |
.doc |
IP |
35960 |
QA Program Evaluation of Engineering Organization |
11/01/07 |
07-034 |
IP |
35961 |
QA Implementation of Criterion I - Evaluation of Engineering Organization Conducting First-of-a-Kind Engineering |
10/03/07 |
07-030 |
.doc |
IP |
36100 |
Inspection of 10 CFR Parts 21 and 50.55(e) Programs for Reporting Defects and Noncompliance |
10/03/07 |
07-030 |
.doc |
IP |
36301 |
Operational Staffing |
11/13/08 |
08-032 |
.doc |
IP |
36302 |
Part 52, Operational Staffing |
08/19/08 |
08-024 |
.doc |
IP |
36801 |
Organization, Management, and Cost Controls at Permanently Shutdown
Reactors |
08/11/97 |
97-012 |
IP |
37051 |
Verification of As-Builts |
10/16/07 |
07-032 |
IP |
37055 |
Onsite Design Activities |
10/16/07 |
07-032 |
IP |
37301 |
Comparison of As-Built Plant to FSAR Description |
11/13/08 |
08-032 |
.doc |
IP |
37801 |
Safety Reviews, Design Changes, and Modifications at Permanently
Shutdown Reactors |
08/11/97 |
97-012 |
IP |
37802 |
First-of-a-Kind Engineering Inspections |
06/22/05 |
05-016 |
.doc |
IP |
38703 |
Commercial Grade Dedication |
04/08/96 |
96-007 |
IP |
40001 |
Resolution of Employee Concerns |
06/03/97 |
97-006 |
IP |
40002 |
Inspections to Review Allegations |
06/28/02 |
02-024 |
.doc |
IP |
40504 |
Part 52, Identification and Resolution of Construction Problems |
10/03/07 |
07-030 |
.doc |
IP |
40801 |
SelfAssessment, Auditing, and Corrective Action at Permanently Shutdown
Reactors |
08/11/97 |
97-012 |
IP |
41301 |
Pre-Licensing Review of Training and Qualification Programs |
11/13/08 |
08-032 |
.doc |
IP |
41500 |
Training and Qualification Effectiveness |
06/13/95 |
95-007 |
IP |
42001 |
Emergency Operating Procedures |
06/28/91 |
91-009 |
IP |
42051 |
Fire Prevention and Protection |
01/31/08 |
08-004 |
.doc |
IP |
42453 |
Part 52, Operating Procedures Inspection |
08/19/08 |
08-024 |
.doc |
IP |
42454 |
Part 52, Emergency Procedures |
07/29/08 |
08-021 |
.doc |
IP |
42700 |
Plant Procedures |
11/15/95 |
95-015 |
IP |
43001 |
Reactive Inspection of Nuclear Vendors |
10/11/94 |
94-018 |
IP |
43002 |
Routine Inspections of Nuclear Vendors |
10/03/07 |
07-030 |
.doc |
IP |
43003 |
Reactive Inspection of Nuclear Vendors |
10/03/07 |
07-030 |
.doc |
IP |
43004 |
Inspection of Commercial-Grade Dedication Programs |
10/03/07 |
07-030 |
.doc |
IP |
43005 |
NRC Oversight of Third-Party Organizations Implementing Quality Assurance Requirements |
10/03/07 |
07-030 |
.doc |
IP |
45051 |
Geotechnical/Foundation Activities Procedure Review |
05/29/03 |
03-018 |
.doc |
IP |
45051.A |
Geotechnical/Foundation Activities Record Review |
01/31/08 |
08-004 |
.doc |
IP |
45052 |
Review of Geotechnical and Site Characterization Activities |
10/03/07 |
07-030 |
.doc |
IP |
45053 |
Geotechnical/Foundation Activities Work Observation |
11/01/07 |
07-034 |
IP |
45055 |
Geotechnical/Foundation Activities Record Review |
11/01/07 |
07-034 |
IP |
46051 |
Structural Concrete Procedure Review |
11/01/07 |
07-034 |
IP |
46053 |
Structural Concrete Work Observation |
11/01/07 |
07-034 |
IP |
46055 |
Structural Concrete Record Review |
11/01/07 |
07-034 |
IP |
46061 |
Structural Masonry Construction |
11/01/07 |
07-034 |
IP |
46071 |
Concrete Expansion Anchors |
11/01/07 |
07-034 |
IP |
48051 |
Structural Steel and Supports Procedure Review |
10/16/07 |
07-032 |
IP |
48053 |
Structural Steel and Supports Work Observation |
10/16/07 |
07-032 |
IP |
48055 |
Structural Steel and Supports Record Review |
10/16/07 |
07-032 |
IP |
49001 |
Inspection of Erosion/Corrosion Monitoring Programs |
12/11/98 |
98-019 |
IP |
49051 |
Reactor Coolant Pressure Boundary Piping QA Review |
10/16/07 |
07-032 |
IP |
49053 |
Reactor Coolant Pressure Boundary Piping - Work Observation |
10/16/07 |
07-032 |
IP |
49055 |
Reactor Coolant Pressure Boundary Piping Record Review |
11/01/07 |
07-034 |
IP |
49061 |
Safety-Related Piping - QA Review |
11/01/07 |
07-034 |
IP |
49063 |
Piping - Work Observation |
11/01/07 |
07-034 |
IP |
49065 |
Safety-Related Piping-Records Review |
11/01/07 |
07-034 |
IP |
50001 |
Steam Generator Replacement Inspection |
08/19/08 |
08-024 |
.doc |
IP |
50002 |
Steam Generators |
12/31/96 |
96-024 |
IP |
50003 |
Pressurizer Replacement Inspection |
07/07/05 |
05-018 |
.doc |
IP |
50003 |
Pressurizer Replacement Inspection |
07/07/05 |
05-018 |
.doc |
IP |
50051 |
Reactor Vessels and Internals QA Review |
11/01/07 |
07-034 |
IP |
50053 |
Reactor Vessel and Internals Work Observation |
11/01/07 |
07-034 |
IP |
50054 |
Reactor Vessel Material Surveillance Program |
12/04/08 |
08-034 |
.doc |
IP |
50055 |
Reactor Vessel and Internals Record Review |
11/01/07 |
07-034 |
IP |
50071 |
Safety-Related Components - Procedure Review |
11/01/07 |
07-034 |
IP |
50073 |
Mechanical Components - Work Observation |
11/01/07 |
07-034 |
IP |
50075 |
Safety Related Components - Records Review |
11/01/07 |
07-034 |
IP |
50090 |
Pipe Support and Restrain Systems |
08/06/03 |
03-028 |
.doc |
IP |
50095 |
Spent Fuel Storage Racks |
11/01/07 |
07-034 |
IP |
50100 |
Heating, Ventitaling, and Air Conditioning Systems |
08/06/03 |
03-028 |
.doc |
IP |
51051 |
Electrical Components and Systems - Procedure Review |
11/01/07 |
07-034 |
IP |
51053 |
Electrical Components and Systems - Work Observation |
08/06/03 |
03-028 |
.doc |
IP |
51055 |
Electrical Components and Systems - Record Review |
08/06/03 |
03-028 |
.doc |
IP |
51061 |
Electrical Cable - Procedure Review |
08/06/03 |
03-028 |
.doc |
IP |
51063 |
Electric Cable - Work Observation |
11/01/07 |
07-034 |
IP |
51065 |
Electric Cable - Record Review |
11/01/07 |
07-034 |
IP |
52003 |
Digital Instrumentation And Control Modification Inspection |
10/31/08 |
08-031 |
.doc |
IP |
52051 |
Instrument Components and Systems - Procedure Review |
11/01/07 |
07-034 |
IP |
52053 |
Instrument Components and Systems - Work Observation |
11/01/07 |
07-034 |
IP |
52055 |
Instrument Components and Systems - Record Review |
11/01/07 |
07-034 |
IP |
53051 |
Containment Penetrations (Mechanical) Procedure Review |
11/01/07 |
07-034 |
IP |
53053 |
Containment Penetrations (Mechanical) Work Observation |
11/01/07 |
07-034 |
IP |
53055 |
Containment Penetrations (Mechanical) Record Review |
11/01/07 |
07-034 |
IP |
55050 |
Nuclear Welding General Inspection Procedure |
06/20/83 |
83-006 |
IP |
55093 |
Reactor Vessels Internals (Welding) Observation of Welding and
Associated Activities |
11/01/07 |
07-034 |
IP |
55100 |
Structural Welding General Inspection Procedure |
06/20/83 |
83-006 |
IP |
55150 |
Weld Verification Checklist |
11/01/07 |
07-034 |
IP |
56700 |
Calibration |
03/23/05 |
05-008 |
.doc |
IP |
57050 |
Nondestructive Examination Procedure Visual Examination Procedure
Review/Work Observation/Record Review |
03/09/99 |
99-003 |
IP |
57060 |
Nondestructive Examination Procedure Liquid Penetrant Examination
Procedure Review/Work Observation/Record Review |
03/09/99 |
99-003 |
IP |
57070 |
Nondestructive Examination Procedure Magnetic Particle Examination
Procedure Review/Work Observation/Record Review |
03/09/99 |
99-003 |
IP |
57080 |
Nondestructive Examination Procedure Ultrasonice Examination Procedure
Review/Work Observation/Record Review |
03/09/99 |
99-003 |
IP |
57090 |
Nondestructive Examination Procedure Radiographic Examination Procedure
Review/Work Observation/Record Review |
06/14/93 |
93-005 |
IP |
60501 |
Fuel Receipt and Storage |
11/13/08 |
08-032 |
.doc |
IP |
60705 |
Preparation for Refueling |
07/27/95 |
95-009 |
IP |
60710 |
Refueling Activities |
07/27/95 |
95-009 |
IP |
60801 |
Spent Fuel Pool Safety at Permanently Shutdown Reactors |
08/11/97 |
97-012 |
IP |
60851 |
Design Control of ISFSI Components |
01/16/08 |
08-003 |
.doc |
IP |
60852 |
ISFSI Component Fabrication by Outside Fabricators |
01/16/08 |
08-003 |
.doc |
IP |
60853 |
OnSite Fabrication of Components and Construction of an ISFSI |
01/16/08 |
08-003 |
.doc |
IP |
60854 |
Preoperational Testing of an ISFSI |
01/16/08 |
08-003 |
.doc |
IP |
60854.1 |
Preoperational Testing of an Independent Spent Fuel Storage Facility Installations at Operating Plants |
09/05/06 |
06-022 |
.doc |
IP |
60855 |
Operation of an ISFSI |
01/16/08 |
08-003 |
.doc |
IP |
60855.1 |
Operation of an ISFSI Independent Spent Fuel Storage Installation at Operating Plants |
09/05/06 |
06-022 |
.doc |
IP |
60856 |
Review of 10 CFR 72.212(b) Evaluations |
03/05/08 |
|
.doc |
IP |
60856.1 |
Review of 10 CFR 72.212(b) Evaluations |
02/02/04 |
04-003 |
.doc |
IP |
60857 |
Review of 10 CFR 72.48 Evaluations |
10/24/07 |
07-033 |
.doc |
IP |
60858 |
Away-From-Reactor ISFSI Inspection Guidance |
05/03/07 |
07-015 |
.doc |
IP |
61705 |
Calibration of Nuclear Instrumentation Systems |
05/12/86 |
86-025 |
IP |
61706 |
Core Thermal PowerEvaluation |
07/14/86 |
86-036 |
IP |
61707 |
Determination of ReactorShutdown Margin |
10/11/85 |
85-031 |
IP |
61708 |
Isothermal and ModeratorTemperature CoefficientDeterminations |
10/11/85 |
85-031 |
IP |
61709 |
Total Power Coefficient of Reactivity at Pressurized Water Reactors |
07/14/86 |
86-036 |
IP |
61710 |
Control Rod Worth Measurements |
10/11/85 |
85-031 |
IP |
61715 |
Verification of Containment Integrity |
12/23/86 |
86-060 |
IP |
61720 |
Containment Local Leak Rate Testing |
10/03/85 |
85-030 |
IP |
61726 |
Surveillance Observations |
06/24/98 |
98-010 |
IP |
61728 |
Independent Measurement of RCS Leak Rates for a PWR |
01/01/84 |
84-002 |
IP |
62002 |
Inspection of Structures, Passive Components, and Civil Engineering
Features at Nuclear Power Plants |
12/31/96 |
96-024 |
IP |
62003 |
Inspection of Steel and Concrete Containments at Nuclear Power Plants |
06/11/97 |
97-008 |
IP |
62700 |
Maintenance Implementation |
04/04/00 |
00-005 |
IP |
62706 |
Maintenance Rule |
12/13/00 |
00-028 |
.doc |
IP |
62708 |
MotorOperated Valve Capability |
09/12/00 |
00-018 |
IP |
62709 |
Configuration Risk Assessment and Risk Management Process |
12/28/00 |
00-029 |
.doc |
IP |
62710 |
PowerOperated Gate Valve
Pressure Locking and Thermal Binding |
01/17/02 |
02-001 |
.doc |
IP |
62801 |
Maintenance and Surveillance at Permanently Shutdown Reactors |
08/11/97 |
97-012 |
IP |
63050 |
Containment Structural Integrity Test |
11/01/07 |
07-034 |
IP |
64051 |
Procedures - Fire Prevention/Protection |
11/01/07 |
07-034 |
IP |
64053 |
Fire Loop Installation |
11/01/07 |
07-034 |
IP |
64704 |
Fire Protection Program |
06/24/98 |
98-010 |
IP |
64705 |
Part 52, Fire Protection Operational Program |
10/03/07 |
07-030 |
.doc |
IP |
65001 |
Inspections of Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Related Work |
10/03/07 |
07-030 |
.doc |
IP |
65001.01 |
Inspection of ITAAC-Related Foundations & Buildings |
10/03/07 |
07-030 |
.doc |
IP |
65001.02 |
Inspection of ITAAC-Related Installation of Structural Concrete |
10/03/07 |
07-030 |
.doc |
IP |
65001.03 |
Inspection of ITAAC-Related Installation of Piping |
08/19/08 |
08-024 |
.doc |
IP |
65001.04 |
Inspection of ITAAC-Related Installation of Pipe Supports and Restraints |
4/18/08 |
08-012 |
.doc |
IP |
65001.05 |
Inspection of ITAAC-Related Installation of Reactor Pressure Vessel and Internals |
08/19/08 |
08-024 |
.doc |
IP |
65001.06 |
Inspection of ITAAC-Related Installation of Mechanical Components |
4/18/08 |
08-012 |
.doc |
IP |
65001.07 |
Inspection of ITAAC-Related Installation of Valves |
07/29/08 |
08-021 |
.doc |
IP |
65001.08 |
Inspection of ITAAC-Related Installation of Electric Components and Systems |
08/19/08 |
08-024 |
.doc |
IP |
65001.10 |
Inspection of ITAAC-Related Installation of Instrument Components and Systems |
10/20/08 |
08-029 |
.doc |
IP |
65001.11 |
Construction Inspection Program Inspection of ITAAC-Related Containment Integrity and Containment Penetrations |
08/19/08 |
08-024 |
.doc |
IP |
65001.12 |
Inspection of ITAAC-Related Installation of Heating, Ventilating, and Air Conditioning Systems |
07/29/08 |
08-021 |
.doc |
IP |
65001.14 |
Inspection of ITAAC-Related Installation of Complex Systems with Multiple Components |
07/29/08 |
08-021 |
.doc |
IP |
65001.15 |
Inspection of ITAAC-Related Installation of Fire Protection Equipment |
07/01/08 |
08-019 |
.doc |
IP |
65001.16 |
Inspection of ITAAC-Related Engineering |
10/03/07 |
07-030 |
.doc |
IP |
65001.18 |
Inspection of Emergency Planning ITAAC |
10/30/08 |
08-030 |
.doc |
IP |
65001.19 |
Inspection Of Installation of ITAAC-Related Radiation Monitoring Components And Systems |
10/20/08 |
08-029 |
.doc |
IP |
65001.A |
ITAAC Attributes for As-Built Inspection |
10/03/07 |
07-030 |
.doc |
IP |
65001.B |
Inspection of the ITAAC-Related Welding Program |
08/19/08 |
08-024 |
.doc |
IP |
65001.C |
Inspection of the ITAAC-Related Construction Test Program |
10/03/07 |
07-030 |
.doc |
IP |
65001.E |
Inspection of the ITAAC-Related Qualification Program |
08/19/08 |
08-024 |
.doc |
IP |
65001.F |
Inspection of the ITAAC-Related Design and Fabrication Requirements |
08/19/08 |
08-024 |
.doc |
IP |
65051 |
Low-Level Radioactive Waste Storage Facilities |
11/01/07 |
07-034 |
IP |
69001 |
Class II NonPower Reactors |
02/03/04 |
04-004 |
.doc |
IP |
69002 |
Class III Research and Test Reactors |
02/03/04 |
04-004 |
.doc |
IP |
69003 |
Class I NonPower Reactor Operator Licenses, Requalification, and
Medical Activities |
02/03/04 |
04-004 |
.doc |
IP |
69004 |
Class I NonPower Reactor Effluent and Environmental Monitoring |
02/03/04 |
04-004 |
.doc |
IP |
69005 |
Class I NonPower Reactor Experiments |
02/03/04 |
04-004 |
.doc |
IP |
69006 |
Class I Research and Test Reactors Organization and Operations and
Maintenance Activities |
02/03/04 |
04-004 |
.doc |
IP |
69007 |
Class I Research and Test Reactor Review and Audit and Design Change
Functions |
02/03/04 |
04-004 |
.doc |
IP |
69008 |
Class I Research and Test Reactor Procedures |
02/03/04 |
04-004 |
.doc |
IP |
69009 |
Class I Research and Test Reactor Fuel Movement |
02/03/04 |
04-004 |
.doc |
IP |
69010 |
Class I Research and Test Reactor Surveillance |
02/03/04 |
04-004 |
.doc |
IP |
69011 |
Class I Research and Test Reactor Emergency Preparedness |
02/03/04 |
04-004 |
.doc |
IP |
69012 |
Class I Research and Test Reactors Radiation Protection |
02/03/04 |
04-004 |
.doc |
IP |
69013 |
Research and Test Reactor Decommissioning |
02/03/04 |
04-004 |
.doc |
IP |
70300 |
Preoperational Test Procedure Test Review |
11/13/08 |
08-032 |
.doc |
IP |
70301 |
Overall Preoperational Test Progam Review Requirements |
11/13/08 |
08-032 |
.doc |
IP |
70302 |
Preoperational Test Program Implementation |
11/13/08 |
08-032 |
.doc |
IP |
70304 |
Engineered Safety Features Test - Preoperational Test Procedure
Review |
08/06/03 |
03-028 |
.doc |
IP |
70305 |
Reactor Protection System Test Preoperational Test Procedure Review |
11/13/08 |
08-032 |
.doc |
IP |
70307 |
Containment Integrated Leak Rate Test Procedure Review |
03/07/86 |
86-013 |
IP |
70308 |
Preoperational Hot Functional Testing - PWR Procedure Review |
11/13/08 |
08-032 |
.doc |
IP |
70311 |
Preoperational Testing Procedure Verification |
11/13/08 |
08-032 |
.doc |
IP |
70312 |
Preoperational Test Witnessing |
11/13/08 |
08-032 |
.doc |
IP |
70313 |
Containment Integrated Leak Rate Test |
10/03/85 |
85-036 |
IP |
70314 |
HFT Witnessing |
11/13/08 |
08-032 |
.doc |
IP |
70315 |
Engineered Safety Features Test Preoperational Test Witnessing |
11/13/08 |
08-032 |
.doc |
IP |
70316 |
Loss of Offsite Power Test Preoperational Test Witnessing |
11/13/08 |
08-032 |
.doc |
IP |
70317 |
Reactor Protection System Test Preoperational Test Witnessing |
11/13/08 |
08-032 |
.doc |
IP |
70322 |
Preoperational Test Results Evaluation - ESF |
08/06/03 |
03-028 |
.doc |
IP |
70323 |
Containment Leak Rate Test Results Evaluation |
10/03/85 |
85-030 |
IP |
70324 |
Preparational Test Results Evaluation - Integrated Hot Functional Test |
11/13/08 |
08-032 |
.doc |
IP |
70325 |
Preoperational Test Results Evaluation - Reactor Protection System |
11/13/08 |
08-032 |
.doc |
IP |
70326 |
Preoperational Test Results Evaluation - Loss of Offsite Power |
11/13/08 |
08-032 |
.doc |
IP |
70329 |
Preoperational Test Result Evaluation Verification |
11/13/08 |
08-032 |
.doc |
IP |
70362 |
Reactor Coolant System Hydrostatic Test Procedure Review |
11/13/08 |
08-032 |
.doc |
IP |
70370 |
Testing PIPing Support and Restraint Systems |
03/07/86 |
86-013 |
IP |
70400 |
Preoperational Test Results Evaluation |
11/13/08 |
08-032 |
.doc |
IP |
70462 |
Reactor Coolant System Hydrostatic Test - Test Witnessing |
11/13/08 |
08-032 |
.doc |
IP |
70562 |
Reactor Coolant system Hydrostatic Test Results Evaluation |
11/13/08 |
08-032 |
.doc |
IP |
71002 |
License Renewal Inspection |
02/18/05 |
05-006 |
.doc |
IP |
71003 |
Post-Approval Site Inspection For License Renewal |
10/31/08 |
08-031 |
.doc |
IP |
71004 |
Power Uprate |
07/01/08 |
08-019 |
.doc |
IP |
71007 |
Reactor Vessel Head Replacement Inspection |
06/04/07 |
07-018 |
.doc |
IP |
71111 |
Reactor Safety-Initiating Events, Mitigating Systems,
Barrier Integrity |
05/16/08 |
08-015 |
.doc |
IP |
71111.01 |
Adverse Weather Protection |
05/01/08 |
08-013 |
.doc |
IP |
71111.04 |
Equipment Alignment |
02/27/07 |
07-007 |
.doc |
IP |
71111.05AQ |
Fire Protection Annual/Quarterly |
01/31/08 |
08-005 |
.doc |
IP |
71111.05T |
Fire Protection [Triennial] |
04/21/06 |
06-009 |
.doc |
IP |
71111.05TTP |
Fire Protection-NFPA 805 Transition Period (Triennial) |
05/09/06 |
06-011 |
.doc |
IP |
71111.06 |
Flood Protection Measures |
08/19/08 |
08-024 |
.doc |
IP |
71111.07 |
Heat Sink Performance |
01/31/08 |
08-005 |
.doc |
IP |
71111.08 |
Inservice Inspection Activities |
10/04/07 |
07-031 |
.doc |
IP |
71111.11 |
Licensed Operator Requalification Program |
01/05/06 |
06-001 |
.doc |
IP |
71111.12 |
Maintenance Effectiveness |
01/31/08 |
08-005 |
.doc |
IP |
71111.13 |
Maintenance Risk Assessments and Emergent Work Control |
01/31/08 |
08-005 |
.doc |
IP |
71111.15 |
Operability Evaluations |
01/31/08 |
08-005 |
.doc |
IP |
71111.17 |
Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications" |
10/31/08 |
08-031 |
.doc |
IP |
71111.18 |
Plant Modifications |
10/31/08 |
08-031 |
.doc |
IP |
71111.19 |
Post Maintenance Testing |
01/17/02 |
02-001 |
.doc |
IP |
71111.20 |
Refueling and Other Outage Activities |
01/31/08 |
08-005 |
.doc |
IP |
71111.21 |
Component Design Bases Inspection |
08/19/08 |
08-024 |
.doc |
IP |
71111.22 |
Surveillance Testing |
02/27/07 |
07-007 |
.doc |
IP |
71114 |
Reactor Safety Emergency Preparedness |
06/29/06 |
06-016 |
.doc |
IP |
71114.01 |
Exercise Evaluation |
06/29/06 |
06-016 |
.doc |
IP |
71114.02 |
Alert and Notification System Testing |
06/29/06 |
06-016 |
.doc |
IP |
71114.03 |
Emergency Preparedness Organization Staffing and Augmentation System |
08/24/07 |
07-026 |
.doc |
IP |
71114.04 |
Emergency Action Level and Emergency Plan Changes |
10/31/08 |
08-031 |
.doc |
IP |
71114.05 |
Correction of Emergency Preparedness Weaknesses |
10/25/06 |
06-029 |
.doc |
IP |
71114.06 |
Drill Evaluation |
10/25/06 |
06-029 |
.doc |
IP |
71114.07 |
Force-On-Force (FOF) Exercise Evaluation
|
10/04/07 |
07-031 |
.doc |
IP |
71121 |
Occupational Radiation Safety |
03/06/02 |
02-008 |
.doc |
IP |
71121.01 |
Access Control To Radiologically Significant Areas |
03/06/02 |
02-008 |
.doc |
IP |
71121.02 |
ALARA Planning and Controls |
03/06/02 |
02-008 |
.doc |
IP |
71121.03 |
Radiation monitoring Instrumentation |
03/06/02 |
02-008 |
.doc |
IP |
71122 |
Public Radiation Safety |
01/24/03 |
03-001 |
.doc |
IP |
71122.01 |
Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems |
12/18/08 |
08-036 |
.doc |
IP |
71122.02 |
Radioactive Material Processing and Transportation |
01/24/03 |
03-001 |
.doc |
IP |
71122.03 |
Radiological Environmental Monitoring Program (REMP)
And Radioactive Material Control Program |
01/24/03 |
03-001 |
.doc |
IP |
71150 |
Discrepant or Unreported Performance Indicator Data |
01/04/07 |
07-001 |
.doc |
IP |
71151 |
Performance Indicator Verification |
06/28/07 |
07-021 |
.doc |
IP |
71152 |
Identification and Resolution of Problems |
01/10/08 |
08-001 |
.doc |
IP |
71153 |
Followup of Events and Notices of Enforcement Discretion |
02/12/08 |
08-007 |
.doc |
IP |
71302 |
Preoperational Test Program Implementation Verification |
11/13/08 |
08-032 |
.doc |
IP |
71303 |
Part 52, Technical Specifications Review |
10/20/08 |
08-029 |
.doc |
IP |
71715 |
Sustained Control Room and Plant Observation |
04/14/92 |
92-004 |
IP |
71801 |
Decommissioning Performance and Status Review at Permanently Shutdown
Reactors |
08/11/97 |
97-012 |
IP |
71841 |
Human Performance |
12/12/00 |
00-027 |
.doc |
IP |
72300 |
Startup Test Procedure review |
01/20/84 |
84-004 |
IP |
72301 |
Startup Test Results Evaluation |
01/20/84 |
84-004 |
IP |
72302 |
Startup Test Witnessing and Observation |
01/20/84 |
84-004 |
IP |
72303 |
Startup Testing for ABWR: Test Procedure Review, Test Witnessing, and Test Results Evaluation |
09/05/06 |
06-021 |
.doc |
IP |
72304 |
Startup Testing for AP 1000: Test Procedure Review, Test Witnessing, and Test Results Evaluation |
09/05/06 |
06-021 |
.doc |
IP |
72400 |
Overall Startup Test Program |
07/01/80 |
80-016 |
IP |
72500 |
Initial Fuel Loading Procedure |
04/30/75 |
75-016 |
IP |
72502 |
Initial Criticality Procedure Review (BWR) |
04/30/75 |
75-016 |
IP |
72504 |
Heatup Phase Procedure Review |
04/30/75 |
75-016 |
IP |
72508 |
Power Ascension Procedure Review: HPCI System |
07/01/80 |
80-016 |
IP |
72509 |
Power Ascension Procedure Review Control Rod Drive system |
07/01/80 |
80-016 |
IP |
72510 |
Power Ascension Procedure Review Relief Valves and MSIVs |
04/30/75 |
75-016 |
IP |
72512 |
Startup Test Procedure Review RCIC or Recirculation Pump TrIP |
04/30/75 |
75-016 |
IP |
72514 |
Startup Test Procedure Review Turbine TrIP/Generator TrIP |
07/01/80 |
80-016 |
IP |
72516 |
Startup Test Procedure Review Shutdown From Outside the Control
Room (Group A) |
07/01/80 |
80-016 |
IP |
72517 |
Startup Test Procedure Review: Loss of Offsite Power (Group A &
B) |
07/01/80 |
80-016 |
IP |
72518 |
Startup Test Procedure Review Core Performance |
07/01/80 |
80-016 |
IP |
72524 |
Initial Fuel Loading Witnessing |
01/20/84 |
84-004 |
IP |
72526 |
BWR Initial Criticality Witnessing |
01/20/84 |
84-004 |
IP |
72532 |
Power Level Plateau Data Review (BWR) |
01/20/84 |
84-004 |
IP |
72564 |
Precritical Test Procedure Review Protective TrIP Circuit or Rod
Drop Measurement |
07/01/80 |
80-016 |
IP |
72566 |
Precritical Test Procedure Review RCS Leak Test or Pressurizer Effectiveness |
07/01/80 |
80-016 |
IP |
72570 |
Initial Criticality Procedure Review (PWR) |
07/01/80 |
80-016 |
IP |
72572 |
Low Power Test Procedures Review Moderator Temperature Coefficient
and Boron Worth or Control Rod Worth and Pseudo Rod Ejection Worth |
07/01/80 |
80-016 |
IP |
72576 |
Power Ascension Test Procedure Review Natural Circulation or Power
Reactivity Coefficient Measurement |
07/01/80 |
80-016 |
IP |
72578 |
Power Ascension Test Procedure Review Evaluation of Core Performance |
07/01/80 |
80-016 |
IP |
72580 |
Power Ascension Test Procedure Review Turbine TrIP or Generator
TrIP |
07/01/80 |
80-016 |
IP |
72582 |
Power Ascension Test Procedure Review Loss of Offsite Power (Group
A) |
07/01/80 |
80-016 |
IP |
72583 |
Power Ascension Test Procedure Review: Shutdown from Outside the
Control Room (Group B) |
|
80-016 |
IP |
72584 |
Power Ascension Test Procedure Review Evaluation of Flux Asymmetry
or Pseudo Rod Ejection Test |
04/30/75 |
75-015 |
IP |
72592 |
PWR Initial Criticality Witnessing |
01/20/84 |
84-004 |
IP |
72596 |
Precritical Data Review |
07/01/80 |
80-016 |
IP |
72600 |
Power Level Plateau Data Review (25% PWR) |
07/01/80 |
80-016 |
IP |
72608 |
Power Level Plateau Data Review (50% PWR) |
07/01/80 |
80-016 |
IP |
72616 |
Power Level Plateau Data Review (75% PWR) |
07/01/80 |
80-016 |
IP |
72624 |
Power Level Plateau Data Review (100% PWR) |
07/01/80 |
80-016 |
IP |
72701 |
Modification Testing |
04/14/92 |
92-004 |
IP |
73051 |
Inservice Inspection Review of Program |
01/14/86 |
86-003 |
IP |
73052 |
Inservice Inspection Review of Procedures |
01/14/86 |
86-003 |
IP |
73053 |
Preservice Inspection - Observation of Work and Work Activities |
11/01/07 |
07-034 |
IP |
73054 |
Part 52, Preservice and Inservice Inspection - Review of Program |
07/01/08 |
08-019 |
.doc |
IP |
73055 |
Preservice Inspection Data Review and Evaluation |
11/01/07 |
07-034 |
IP |
73753 |
Inservice Inspection |
06/04/98 |
98-010 |
IP |
73755 |
Inservice Inspection Data Review and Evaluation |
01/14/86 |
86-003 |
IP |
73756 |
Inservice Testing of Pumps and Valves |
07/27/95 |
95-009 |
IP |
73757 |
Part 52, Preservice Inspection - Data Review and Evaluation |
04/18/08 |
08-012 |
.doc |
IP |
78010 |
10 CFR Part 21 Program |
09/11/08 |
08-026 |
.doc |
IP |
79501 |
LWR Water Chemistry Control And Chemical Analysis � Audits |
11/13/08 |
08-032 |
.doc |
IP |
79502 |
Plant Systems Affecting Plant Water Chemistry |
11/13/08 |
08-032 |
.doc |
IP |
79702 |
Control and Monitoring of Radiological Source Term |
04/17/00 |
00-006 |
.doc |
IP |
80521 |
Radiological Environmental Monitoring (Preoperational And Supplemental) |
11/13/08 |
08-032 |
.doc |
IP |
80522 |
Part 52, Radiological Environmental Monitoring Program (REMP) |
07/01/08 |
08-019 | .doc |
IP |
80210 |
Environmental Protection - Initial and Periodic Inspections |
06/22/05 |
05-016 |
.doc |
IP |
82001 |
Evaluation of Emergency Preparedness |
05/22/00 |
00-010 |
.doc |
IP |
82001.01 |
ERO Performance Drills |
05/22/00 |
00-010 |
.doc |
IP |
82001.02 |
ERO Performance Drills Dose Assessment |
05/22/00 |
00-010 |
.doc |
IP |
82001.03 |
ERO Augmentation Drill |
05/22/00 |
00-010 |
.doc |
IP |
82001.04 |
Facilities and EquIPment |
05/22/00 |
00-010 |
.doc |
IP |
82001.05 |
Procedure Quality |
05/22/00 |
00-010 |
.doc |
IP |
82001.06 |
Remedial Exercises |
05/22/00 |
00-010 |
.doc |
IP |
82201 |
Emergency Detection and Classification |
03/23/05 |
05-008 |
.doc |
IP |
82202 |
Protective Action Decision Making |
03/23/05 |
05-008 |
.doc |
IP |
83100 |
Occupational Exposure During SAFSTOR and DECON |
12/30/91 |
91-022 |
IP |
83501 |
Significant Uncontrolled Radiation Exposure |
04/17/00 |
00-006 |
.doc |
IP |
83502 |
Evaluation of Public Radiation Safety |
04/17/00 |
00-006 |
.doc |
IP |
83502.01 |
Radioactive Gaseous and Liquid Treatment and Monitoring Systems |
04/17/00 |
00-006 |
.doc |
IP |
83502.02 |
Radioactive Material Process and Transportation |
04/17/00 |
00-006 |
.doc |
IP |
83502.03 |
Radiological Environment Monitoring Program and Radioactive Material
Control Program |
04/17/00 |
00-006 |
.doc |
IP |
83521 |
Radiation Protection Startup |
01/01/84 |
84-001 |
IP |
83522 |
Radiation Protection, Plant Chemistry, Radwaste, and Environmental: Organization and Management Controls |
11/13/08 |
08-032 |
.doc |
IP |
83523 |
Radiation Protection, Plant Chemistry, Radwaste, Transportation and Environmental: Training and Qualifications |
11/13/08 |
08-032 |
.doc |
IP |
83524 |
External Occupational Exposure Control And Personal Dosimetry (Preoperational And Supplemental) |
11/13/08 |
08-032 |
.doc |
IP |
83525 |
Internal Exposure Control and Assessment (Preoperational and Supplemental) |
11/13/08 |
08-032 |
.doc |
IP |
83526 |
Control Of Radioactive Materials and Contamination, Surveys, and Monitoring (Preoperational And Supplemental) |
11/13/08 |
08-032 |
.doc |
IP |
83527 |
Facilities and Equipment (Preoperational and Supplemental) |
11/13/08 |
08-032 |
.doc |
IP |
83723 |
General Employee, Radiation Safety, Plant Chemistry, Radwaste, and
Transportation Training |
12/16/03 |
03-041 |
.doc |
IP |
83724 |
External Occupational Exposure Control and Personal Dosimetry |
04/17/00 |
00-006 |
.doc |
IP |
83725 |
Internal Exposure Control and Assessment |
04/17/00 |
00-006 |
.doc |
IP |
83728 |
Maintaining Occupational Exposures ALARA |
04/17/00 |
00-006 |
.doc |
IP |
83729 |
Occupational Exposure During Extended Outages |
12/31/91 |
91-021 |
IP |
83746 |
Part 52, Offsite Dose Calculation Manual (ODCM) |
07/29/08 |
08-021 |
.doc |
IP |
83750 |
Occupational Radiation Exposure |
03/15/94 |
02-023 |
IP |
83801 |
Inspection of Final Surveys at Permanently Shutdown Reactors |
09/05/06 |
06-020 |
.doc |
IP |
83822 |
Radiation Protection |
09/07/00 |
00-016 |
.doc |
IP |
83890 |
Closeout Inspection and Survey |
05/01/03 |
03-013 |
.doc |
IP |
84100 |
Special Nuclear Material Inspections At Near Surface LowLevel Waste
Disposal Facilities in Agreement States |
11/27/01 |
01-028 |
.doc |
IP |
84101 |
Radioactive Waste Management |
12/30/91 |
91-022 |
IP |
84521 |
Radwaste Startup |
01/01/84 |
84-001 |
IP |
84522 |
Solid Wastes (Preoperational and Supplemental) |
11/13/08 |
08-032 |
.doc |
IP |
84523 |
Liquids and Liquid Wastes (Preoperational and Supplemental) |
11/13/08 |
08-032 |
.doc |
IP |
84524 |
Gaseous Waste System (Preoperational And Supplemental) |
11/13/08 |
08-032 |
.doc |
IP |
84525 |
Quality Assurance and Confirmatory Measurements for In Plant Radiochemical Analysis (Preoperational And Supplemental) |
11/13/08 |
08-032 |
.doc |
IP |
84527 |
Part 52, Solid Waste Management System |
07/01/08 |
08-019 | .doc |
IP |
84750 |
Radioactive Waste Treatment, and Effluent and Environmental Monitoring |
03/15/94 |
94-006 |
IP |
84850
|
Radioactive Waste Management - Inspection of Waste Generator Requirements
of 10 CFR Part 20 and 10 CFR Part 61. |
12/22/08 |
08-037 |
.doc |
IP |
84900 |
LowLevel Radioactive Waste Storage |
12/22/08 |
08-037 |
.doc |
IP |
86001 |
Design, Fabrication, Testing, and Maintenance of Transportation
Packagings |
01/16/08 |
08-003 |
.doc |
IP |
86730 |
Transportation of Radioactive Materials |
04/17/00 |
00-006 |
.doc |
IP |
86740 |
Inspection of Transportation Activities |
10/30/08 |
08-030 |
.doc |
IP |
86750 |
Solid Radioactive Waste Management and Transportation of Radioactive
Materials |
03/15/94 |
94-006 |
IP |
87102 |
Maintaining Effluents from Materials Facilities As Low As Is Reasonably
Achievable (ALARA) |
04/04/00 |
00-005 |
IP |
87103 |
Inspection of Materials Licensees Involved in an Incident or Bankruptcy
Filing |
11/03/00 |
00-023 |
.doc |
IP |
87104 |
Decommissioning Inspection Procedure for Materials Licensees |
07/29/02 |
02-029 |
.doc |
IP |
87121 |
Industrial Radiography Programs |
08/22/05 |
05-023 |
.doc |
IP |
87122 |
Irradiator Programs |
12/31/02 |
02-047 |
.doc |
IP |
87123 |
Well Logging Programs |
11/25/03 |
03-037 |
.doc |
IP |
87124 |
Fixed and Portable Gauge Programs |
11/25/03 |
03-037 |
.doc |
IP |
87125 |
Materials Processor/Manufacturer Programs |
09/28/05 |
05-027
|
.doc |
IP |
87126 |
Industrial/Academic/Research Programs |
09/28/05 |
05-027
|
.doc |
IP |
87127 |
Radiopharmacy Programs |
07/01/08 |
08-018 |
.doc |
IP |
87129 |
Master Materials Program |
09/15/03 |
03-034 |
.doc |
IP |
87130 |
Nuclear Medicine Programs, Written Directive Not Required |
10/24/02 |
02-041 |
.doc |
IP |
87131 |
Nuclear Medicine Programs, Written Directive Required |
10/24/02 |
02-041 |
.doc |
IP |
87132 |
Brachytherapy Programs |
12/06/05 |
05-033
|
.doc |
IP |
87133 |
Medical Gamma Sterotactic Radiosurgery and Teletherapy Programs |
10/24/02 |
02-041 |
.doc |
IP |
87134 |
Medical Broad-Scope Programs |
09/28/05 |
05-027 |
.doc |
IP |
87250 |
Locating Missing Materials Licensees |
10/29/01 |
01-022 |
IP |
87654 |
Uranium Mill Site Decommissioning Inspection |
03/19/02 |
02-010 |
.doc |
IP |
88001 |
Onsite Construction |
04/15/94 |
94-011 |
IP |
88002 |
Operational Event Review and Feedback Programs at Fuel Cycle Facilities |
10/30/08 |
08-030 |
.doc |
IP |
88003 |
Reactive Inspection for Events at Fuel Cycle Facilities Program |
08/10/98 |
98-012 |
IP |
88005 |
Management Organization and Controls |
09/05/06 |
06-020 |
.doc |
IP |
88010 |
Operator Training/Retraining |
09/05/06 |
06-020 |
.doc |
IP |
88015 |
Headquarters Nuclear Criticality Safety Program |
09/05/06 |
06-020 |
.doc |
IP |
88016 |
Nuclear Criticality Safety Evaluations and Analyses |
07/28/06 |
06-019 |
.doc |
IP |
88017 |
Criticality Alarm Systems |
07/28/06 |
06-019 |
.doc |
IP |
88020 |
Operational Safety |
09/05/06 |
06-020 |
.doc |
IP |
88025 |
Maintenance and Surveillance of Safety Controls |
09/25/06 |
06-025 |
.doc |
IP |
88030 |
Radiation Protection |
07/28/06 |
06-019 |
.doc |
IP |
88035 |
Radioactive Waste Management |
09/25/06 |
06-025 |
.doc |
IP |
88045 |
Effluent Control and Environmental Protection |
09/05/06 |
06-020 |
.doc |
IP |
88050 |
Emergency Preparedness |
09/05/06 |
06-020 |
.doc |
IP |
88051 |
Evaluation of Exercises and Drills |
07/28/06 |
06-019 |
.doc |
IP |
88054 |
Fire Protection (Triennial) |
09/11/08 |
08-026 |
.doc |
IP |
88055 |
Fire Protection (Annual) |
08/19/08 |
08-024 |
.doc |
IP |
88056 |
Process Safety Information |
01/16/96 |
96-001 |
IP |
88057 |
Hazard Identification and Assessment |
01/16/96 |
96-001 |
IP |
88058 |
Standard Operating Procedures |
01/16/96 |
96-001 |
IP |
88059 |
SiteWide Safety Procedures |
01/16/96 |
96-001 |
IP |
88060 |
Detection and Monitoring |
01/16/96 |
96-001 |
IP |
88061 |
Chemical Safety Training |
01/16/96 |
96-001 |
IP |
88062 |
Maintenance and Inspection |
01/16/96 |
96-001 |
IP |
88063 |
Management of Change |
01/16/96 |
96-001 |
IP |
88064 |
Emergency Response Procedures |
01/16/96 |
96-001 |
IP |
88065 |
Incident Investigation |
01/16/96 |
96-001 |
IP |
88066 |
Audits and Inspection |
01/16/96 |
96-001 |
IP |
88070 |
Permanent Plant Modifications |
09/05/06 |
06-020 |
.doc |
IP |
88071 |
Configuration Management Programmatic Review |
07/28/06 |
06-019 |
.doc |
IP |
88075 |
Event Followup |
07/28/06 |
06-019 |
.doc |
IP |
88100 |
Plant Operations |
12/30/96 |
96-026 |
IP |
88101 |
Configuration Control |
12/30/96 |
96-026 |
IP |
88102 |
Surveillance Observations |
12/30/96 |
96-026 |
IP |
88103 |
Maintenance Observations |
12/30/96 |
96-026 |
IP |
88104
|
Decommissioning Inspection Procedure For Fuel Cycle Facilities |
07/03/02 |
02-026 |
.doc |
IP |
88105 |
Management Organization and Controls |
12/30/96 |
96-026 |
IP |
88106 |
Quality Assurance: Program Development and Implementation(Pre-licensing and Construction) |
02/07/07 |
07-006 |
.doc |
IP |
88107 |
Quality Assurance: Design and Documentation Control [Pre-licensing
and Construction] |
05/18/05 |
05-013 |
.doc |
IP |
88108 |
Quality Assurance: Control of Materials, Equipment, and Services (Pre-licensing and Construction) |
02/07/07 |
07-006 |
.doc |
IP |
88109 |
Quality Assurance: Inspection, Test Control, and Control of Measuring and Test Equipment (Pre-licensing and Construction) |
06/20/07 |
07-020 |
.doc |
IP |
88110 |
Quality Assurance: Problem Identification, Resolution and Corrective
Action |
05/18/05 |
05-013 |
.doc |
IP |
88111 |
10 CFR, Part 21, Inspection-Facility Construction |
02/07/07 |
07-006 |
.doc |
IP |
88113 |
Control of the Electronic Management of Data |
02/07/07 |
07-006 |
.doc |
IP |
88114 |
Quality Affecting Item Procurement (10 CFR Part 21) and Commercial Grade Item Dedication Process [Reactive] |
10/25/06 |
06-031 |
.doc |
IP |
88115 |
Supplier/Vendor Inspection (Construction Phase) |
10/25/06 |
06-031 |
.doc |
IP |
88116 |
Inspection of Safety Function Interfaces for the Mixed Oxide Fuel Fabrication Facility (Pre-licensing and Construction) |
02/07/07 |
07-006 |
.doc |
IP |
88131 |
Geotechnical/Foundation Activities |
10/25/06 |
06-031 |
.doc |
IP |
88132 |
Structural Concrete Activities |
10/25/06 |
06-031 |
.doc |
IP |
88133 |
Structural Steel and Supports Activities |
07/25/07 |
07-023 |
.doc |
IP |
88134 |
Quality Assurance: Piping Relied on for Safety |
05/18/05 |
05-013 |
.doc |
IP |
88136 |
Mechanical Components |
07/25/07 |
07-023 |
.doc |
IP |
88138 |
Electrical Components and Systems |
08/08/07 |
07-024 |
.doc |
IP |
88139 |
Ventilation and Confinement Systems |
08/08/07 |
07-024 |
.doc |
IP |
88141 |
Fire Prevention and Protection |
08/08/07 |
07-024 |
.doc |
IP |
88142 |
Underground Fire Water Loop and Equipment Installation |
08/08/07 |
07-024 |
.doc |
IP |
88143 |
Pipe Supports and Restrains |
07/25/07 |
07-023 |
.doc |
IP |
89001 |
InSitu Leach (ISL) Facilities |
09/02/97 |
97-013 |
IP |
90501 |
Reportable Matters Startup Test Program |
04/30/75 |
75-016 |
IP |
90700 |
Feedback of Operational Experience Information at Operating Power
Reactors |
03/23/05 |
05-008 |
.doc |
IP |
90712 |
Inoffice Review of Written Reports of Nonroutine Events at Power
Reactor Facilities |
12/31/98 |
98-020 |
IP |
92050 |
Review of Quality Assurance for Extended Construction Delay |
04/04/00 |
00-005 |
IP |
92700 |
Onsite Followup of Written Reports of Nonroutine Events at Power
Reactor Facilities |
12/31/98 |
98-020 |
IP |
92701 |
Followup |
03/13/07 |
07-010 |
.doc |
IP |
92702 |
Followup on Corrective Actions for Violations and Deviations |
01/10/08 |
08-001 |
.doc |
IP |
92703 |
Followup of Confirmatory Action Letters |
03/30/05 |
05-009 |
.doc |
IP |
92709 |
Licensee Strike Contingency Plans |
03/30/05 |
05-009 |
.doc |
IP |
92711 |
Continued Implementation of Strike Plans During an Extended Strike |
03/30/05 |
05-009 |
.doc |
IP |
92712 |
Resumption of Normal Operations After a Strike |
08/21/92 |
92-010 |
IP |
92720 |
Corrective Action |
11/01/07 |
07-034 |
IP |
93001 |
OSHA Interface Activities |
02/11/04 |
04-006 |
.doc |
IP |
93800 |
Augmented Inspection Team |
07/25/08 |
08-020 |
.doc |
IP |
93801 |
Safety System Functional Inspection (SSFI) |
07/15/96 |
96-016 |
.doc |
IP |
93802 |
Operational Safety Team Inspection (OSTI) |
11/27/89 |
89-015 |
IP |
93803 |
Safety Systems Outage Modifications Inspection |
04/27/89 |
89-008 |
IP |
93804 |
RiskBased Operational Safety and Performance Inspection |
01/15/92 |
92-001 |
IP |
93805 |
Maintenance Program |
08/06/93 |
93-007 |
IP |
93806 |
Operational Readiness Assessment Team Inspections |
09/29/98 |
98-015 |
IP |
93807 |
Systems Based Instrumentation and Control Inspection |
01/29/93 |
93-001 |
IP |
93810 |
Service Water System Operational Performance Inspection (SWSOPI) |
09/14/98 |
98-013 |
IP |
93811 |
Electrical Distribution System Functional Inspection (EDSFI) |
02/03/99 |
99-002 |
IP |
93812 |
Special Inspection |
07/25/08 |
08-020 |
.doc |
IP |
94300 |
Status of Plant Readiness for an Operating Licensee |
11/01/07 |
07-034 |
IP |
95001 |
Inspection For One Or Two White Inputs In A Strategic Performance
Area |
10/16/06 |
06-027 |
.doc |
IP |
95002 |
Inspection For One Degraded Cornerstone Or Any Three White Inputs
In a Strategic Performance Area |
10/16/06 |
06-027 |
.doc |
IP |
95003 |
Supplemental Inspection for Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple Yellow Inputs, or One Red Input |
10/26/06 |
06-030 |
.doc |
IP |
95003.01 |
Emergency Preparedness |
01/17/02 |
02-001 |
.doc |