skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

Issue Date: 06/22/05

NRC INSPECTION MANUAL IIPB

Change Notice 05-016


All Files in ZIP Format cn05-016.zip

The following links on this page are to documents in Adobe Portable Document Format (PDF). See our Plugins, Viewers, and Other Tools page for more information. For successful viewing of PDF documents on our site please be sure to use the latest version of Adobe.

DELETED:
Number

Date
TRANSMITTED:
Number

Date
1. -------- -------- IP 35005 06/22/05
2. -------- -------- IP 35017 06/22/05
3. -------- -------- IP 35020 06/22/05
4. -------- -------- IP 35029 06/22/05
5. -------- -------- IP 35100 06/22/05
6. -------- -------- IP 35021 06/22/05
7. IP 36100 08/31/91 IP 36100 06/22/05
8. -------- -------- IP 37802 06/22/05
9. -------- -------- IP 80210 06/22/05
10. -------- -------- IMC 2502 06/22/05



TRAINING: None.
REMARKS:

IP 35005 (Pre-Docketing Combined License Quality Assurance Controls Inspection) is issued to support new reactor licensing under 10 CFR Part 52.

IP 35017 (Post-Docketing Development of the Quality Assurance (QA) Program for Design and Procurement Activities) is issued to support new reactor licensing under 10 CFR Part 52.

IP 35020 (Inspection of Applicant’s Surveillance of Contractor Quality Assurance (QA) Activities) has been reassessed resulting in its reactivation. This IP supports new reactor licensing under 10 CFR Part 52.

IP 35021 (Post-Docketing Implementation of Quality Assurance (QA) Activities Related to Design, Procurement and Construction) is issued to address the need to inspect how the licensee is implementing the quality assurance program related to design, procurement and construction activities that are occurring during the combined license (COL) application period before the COL is issued.

IP 35029 (Pre-Combined License (COL) Quality Assurance (QA) Inspection of Site Limited Work Authorization (LWA) 1 & 2 Activities) is issued to support new reactor licensing under 10 CFR Part 52.

IP 35100 (Review of the QA Manual) has been reassessed resulting in its reactivation. The title of this IP has been change to better reflect the content of the procedure.

IP 36100 (Inspection of 10 CFR Parts 21 and 50.55(e) Programs for Reporting Defects and Noncompliance) is revised to incorporate reviews during the combined license application process under 10 CFR Part 52.

IP 37802 (First-of-a-Kind Engineering Inspections) is issued to support new reactor licensing under 10 CFR Part 52.

IP 80210 (Environmental Protection - Initial and Periodic Inspections) has been reassessed resulting in its reactivation. This IP supports new reactor licensing under 10 CFR Part 52.

IMC 2502 (Construction Inspection Program: Pre-Combined License (Pre-COL) Phase) is issued to describe the inspection program to be implemented during the combined license application process under 10 CFR Part 52.

 
 

 

DISTRIBUTION: Standard


END