Issue Date: 02/18/05
NRC INSPECTION MANUAL IIPB
All Files in ZIP Format | cn05-006.zip |
DELETED:
Number |
Date |
TRANSMITTED:
Number |
||
---|---|---|---|---|
Date |
||||
1. | IMC 1245, App D1 | 01/24/03 | IMC 1245, App D1 | 02/18/05 |
2. | IMC 2516 | 04/10/02 | IMC 2516 | 02/18/05 |
3. | IP 71002 | 09/18/00 | IP 71002 | 02/18/05 |
4. | IP 71003 | 12/09/02 | IP 71003 | 02/18/05 |
5. | IP 71111.05T | 12/01/04 | IP 71111.05T | 02/18/05 |
6. | TI 2515/150 Rev 2 | 08/04/03 | TI 2515/150 Rev 3 | 02/18/05 |
7. | TI 2515/153 | 10/03/03 | TI 2515/153 Rev 1 | 02/18/05 |
TRAINING: | IMC 1245, App D1 - Completed by way of a detailed Change Notice, prior SRA reviews, and presentations during SRA counterpart meetings. |
REMARKS: | IMC 1245, App D1 (Senior Reactor Analyst Training and Qualification Program) has been revised to include lessons learned from currently qualified SRAs such that upon qualification, SRAs will be better prepared to fulfill the role of SRA. Numerous SRAs were involved in the development and review of new individual study activities (ISAs) and on-the-job training (OJT) activities. Since this is a major revision, an assessment was performed by IIPB to determine what actions would be needed for currently qualified SRAs to transition to the revised procedure. Since the revised qualification procedure continues to focus on the major tasks performed by SRAs, no additional training activities are required. These tasks include the following: (1) Notice of Enforcement Discretion (NOEDs) reviews, (2) Assign significance to inspection findings through Phase 3 of the Significance Determination Process (SDP), and (3) Assign significance to operational events. In addition, no new formal training courses have been added from the prior revision. IMC 2516 (Policy and Guidance for the License Renewal Inspection Programs)
has been revised to remove IIPB as approval authority for license renewal
inspection plans, remove reference to the Associate Director for Inspection
and Programs, update the general policies and program objectives, and
provide an updated sample inspection letter. IP 71003 (Post-Approval Site Inspection for License Renewal) attachments have been revised to include licensee commitments for all completed license renewal applications for post-renewal inspections. IP 71111.05T (Fire Protection [Triennial]) Guidance incorporated into Enclosure 2 of the inspection procedure, Inspection Criteria for Fire Protection Manual Actions, issued 12/01/04, incorrectly adopted new information not intended to be issued at that time. This revision re-instates the criteria which appeared in the 03/06/03 version of the document with some editorial changes to conform to the new format. Findings where manual actions are feasible will continue to be identified as Green. TI 2515/150, Rev 3 (Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles [NRC Order EA-03-009]) has been revised to reflect the revised NRC Order EA-03-009 dated February 2004 and other minor changes for clarity. TI 2515/153, Rev 1 (Reactor Containment Sump Blockage [NRC Bulletin
2003-01]) has been revised to extend the expiration and completion dates. |
DISTRIBUTION: Standard
END