|
|
| | - San Francisco, California
- Total Acreage: 934
- BRAC Year: 1988
- Closure Date: 29 Dec 1988
- Action: Closure - Completing BRAC disposal and environmental actions.
| |
|
Current Events
|
|
PUBLIC MEETING: Date: February 28, 2013
Time: 6:00 p.m. to 8:00 p.m.
Location: Southeast Community Facility Commission Building
Alex L. Pitcher Jr. Room
1800 Oakdale Avenue
San Francisco, CA 94124
|
|
NOTICE: 02/12/2013 - SAN FRANCISCO, Ca -- The U.S. Department of the Navy, in coordination with state and federal environmental regulatory agencies, encourages the public to comment on its Proposed Plan for cleanup of Parcels E and UC-3 at the former Hunters Point Naval Shipyard in San Francisco, California. The Proposed Plan summarizes the remedial (cleanup) alternatives evaluated by the Navy and explains the reasons for identifying the preferred alternatives to address contamination at Parcels E and UC-3.
PUBLIC COMMENT PERIOD
The Navy invites interested members of the public to review and comment on the Parcels E and UC-3 Proposed Plan during a Public Comment Period, from February 13, 2013, to March 15, 2013. Public comments must be submitted in writing and must be received no later than March 15, 2013. Alternatively, members of the public are invited to attend a Public Meeting on February 28, 2013, from 6:00 p.m. to 8:00 p.m. Public comments to the Proposed Plan will also be accepted at this meeting. If you have any questions or wish to comment on this project, please contact Mr. Keith Forman, Base Realignment and Closure (BRAC) Environmental Coordinator, BRAC Program Management Office West, 1455 Frazee Road, Suite 900, San Diego, CA 92108-4310; keith.s.forman@navy.mil; (619) 532-0913 office phone; (415) 308-1458 cell phone; (619) 532-0995 fax.
For more information, click the Public Notice below.
Related Documents:
February 2013, Notice of Proposed Plan and Public Comment Period for Parcels E and UC-3 - PDF, 10 kb
February 2013, Parcels E and UC-3 Proposed Plan - PDF, 1.76 MB
February 2013, Fact Sheet: Summary of the Proposed Plan for Parcels E and UC-3 - PDF, 581 kb
|
|
February, 2012: Hunters Point Naval Shipyard 2012 Community Events Calendar, PDF - 350 kb
|
|
NOTICE: August 17, 2011 - Parcel E-2, Industrial Landfill, Annual Operation and Maintenance Report for 2010-2011: The Operation and Maintenance Plan describes the procedures required to ensure the integrity of the interim cap on the Parcel E-2 Industrial Landfill, as well as contingency plans associated with earthquakes, floods or major storm events, and fires. General site inspections conducted four times per year, in September, December, March, and June, are summarized in this report.
|
|
NOTICE: The Anna Waden Library is now closed for renovation. The Hunters Point Shipyard documents formerly available at this location are now located at the Hunters Point Shipyard Site Office Trailer, (Located across the street from the security entrance to the Shipyard), 690 Hudson Avenue. San Francisco, CA 94124. The office is open Monday through Friday from 9:00 am to 5:00 pm.
Hunters Point Shipyard documents continue to be available at the City of San Francisco Main Library, Government Information Center, 5th Floor, 100 Larkin Street, San Francisco, CA 94102, (415) 557-4500. The main
library is open Mondays 10am-6pm; Tuesday through Thursday 9am-8pm; Friday 12-
6pm;Saturday 10am-6 pm; and Sunday 12-5 pm.
|
View/Hide Base Summary
|
|
Base Property and Historical Use Hunters Point Shipyard (HPS) is located in southeast San Francisco on a peninsula that extends east into the San Francisco Bay. The facility was operated as a commercial dry dock facility from 1869 until December 29, 1939, when the Navy purchased the property. From 1945 until 1974, the Navy predominantly used the shipyard as a repair facility.
In addition to serving as a shipyard repair facility, HPS was also partially occupied by the Naval Radiological Defense Laboratory (NRDL) from 1948, when the NRDL was formed, to 1969. The purposes of the NRDL included radiological decontamination of ships exposed to atomic weapons testing and included conducting research and experiments on radiological decontamination, the effect of radiation on living organisms, and the effects of radiation on materials.
In 1974, the Navy ceased shipyard operations at HPS, placing it in industrial reserve and transferring control of the property to the Office of the Supervisor of Shipbuilding, Conversion, and Repair in San Francisco. From May 1976 to June 1986, Triple A Machine Shop, Inc. leased most of HPS from the Navy and operated these leased areas as a commercial ship repair facility.
|
|
Closure date, planned reuses, parcels transferred HPS was divided into seven parcels, Parcels A through F and E-2, to aid in environmental investigation and cleanup activities. On December 3, 2004 the Navy transferred the first 75-acres of HPS (know as Parcel A) to the San Francisco Redevelopment Agency (SFRA) and is no longer Navy property. The planned reuse for Parcel A consists of residential housing, community parks and commercial venues. The remainder of the Shipyard will be conveyed to the SFRA once the environmental cleanup becomes completed.
The former Parcel A consisted of approximately 75 acres upland of the other parcels. Parcel B occupies approximately 58.7 acres of shoreline and lowland coast in the northeastern portion of HPS. Parcel C consists of approximately 78.4 acres of shoreline and lowland coast along the east-central portion of HPS. Parcel D occupies approximately 98.1 acres of southeast central shoreline and lowland coast. Parcel E consists of approximately 137.8 acres of shoreline and lowland coast along the southwestern portion of HPS. Parcel E-2 consists of approximately 47.4 acres of the original Parcel E land; is situated along the western shoreline of HPS and contains the Landfill and Panhandle Area. Parcel F consists of approximately 457 acres of offshore sediment within San Francisco Bay which bounds HPS to the north and east; and within South Basin which bounds HPS to the south.
|
View/Hide Restoration Advisory Board (RAB) / Community Meeting Information, Documents and Minutes
|
|
Meeting Information Per the December 23, 2009 attachment below, the HPS Restoration Advisory Board was officially dissolved as of December 23, 2009. The Department of the Navy is seeking input as it organizes a new, improved community outreach program. As soon as the details have been worked out, the Navy will announce the location and date of the next community meeting.
December 23, 2009: Memorandum - Hunters Point Restoration Advisory Board (RAB), PDF - 26 kb
December 22, 2009: BRAC Program Management Office West Recommendation to Dissolve the Hunters Point Restoration Advisory Board, PDF - 560 kb
September 01, 2009: Proposal to Dissolve the Hunters Point Restoration Advisory Board (RAB), PDF - 2.2 MB
May 22, 2009: Department of the Navy's notice of intent to dissolve the Hunter's Point Naval Shipyard (HPS) Restoration Advisory Board (RAB) letter, PDF - 54 kb
|
|
Scheduled Meetings
|
|
Thursday, February 28, 2013 at 6:00 PM - 8:00 PM (Location: SECC, Alex L. Pitcher, Jr. Room 1800 Oakdale Avenue, San Francisco, CA 94124)
|
|
|
Point of Contact
Mr. Keith Forman 1455 Frazee Road, Suite 900, San Diego, CA, 92108 Phone: (619) 532-0913
|
|
|
Community Informational Meeting Material Click on the corresponding arrow ( ) to view documents for that year.
2012 2011
|
View/Hide Information Repository
|
|
Anna E. Waden Library (Hardcopy Only) 5075 Third Street, San Francisco, CA, 94124 Hours: Mon, Tues, Sat 10:00am - 6:00pm
Wed 1:00pm - 8:00pm
Thurs 1:00pm - 7:00pm
Sun CLOSED
NOTICE: The Anna E. Waden Library is temporarily closed and, for the remainder of the year, the Navy has
opened a new Information Repository at the Hunters Point Shipyard Site Trailer
(Located across the street from the security entrance to the Shipyard), on 690
Hudson Avenue San Francisco, CA 94124.
|
|
San Francisco Main Library Science, Technical, and Government Documents Room 100 Larkin Street, San Francisco, CA, 94102 Hours: Mon, Wed, Fri, Sat 10:00am - 6:00pm
Tues & Thurs 9:00am - 8:00pm
Sun 12:00pm - 5:00pm
Contact: Government Information Center Phone: (415) 570-4500
|
View/Hide All Documents
All documents prior to 2005 have been archived. The titles of those documents are provided below so that you may request copies from the Navy BRAC Webmaster. Please include the exact title of the document within your request.
To view a specific category, click on the corresponding arrow ( ) to expand and collapse documents. |
|
Environmental Documents | June 2012, Notice of the Availability of Record of Decision for the Final
Supplemental Environmental Impact Statement for Disposal and
Reuse of Hunters Point Naval Shipyard, San Francisco, California – PDF, 56 kb
|
| June 2012, Record of Decision for the Final Supplemental Environmental Impact Statement for
Disposal and Reuse of Hunters Point Naval Shipyard, San Francisco, California – PDF, 816 kb
|
| April 2012, Draft Parcel E-2
Record of Decision
Hunters Point Naval Shipyard
community meeting - PDF, 2.8 MB
|
| April 2012, Notice of Availability of the Final Supplemental Environmental Impact Statement for the Disposal and Reuse of Hunters Point Naval Shipyard, San Francisco, California – PDF, 101kb
|
| March 2012, FINAL Supplemental Environmental Impact Statement for the Disposal and Reuse of Hunters Point Shipyard, San Francisco, California - Volume 2: Appendices A through P (Cover and Title Page) – PDF, 625kb
|
| March 2012, FINAL Supplemental Environmental Impact Statement for the Disposal and Reuse of Hunters Point Shipyard, San Francisco, California - Volume 1: Chapters 1 – 10 (Cover and Title Page) – PDF, 55kb
|
| Abstract – PDF, 58 kb
|
| Executive Summary – PDF, 1.6 MB
|
| Table of Contents, List of Figures and Tables, and Acronyms and Abbreviations – PDF, 140 kb
|
| Chapter 1: Purpose and Need – PDF, 623 kb
|
| Chapter 2: Proposed Action and Alternatives – PDF, 7.9 MB
|
| Chapter 3: Affected Environment – PDF, 7.0 MB
|
| Chapter 4: Environmental Consequences – PDF, 9.5 MB
|
| Chapter 5: Cumulative Impacts – PDF, 583 kb
|
| Chapter 6: Other Considerations – PDF, 417 kb
|
| Chapter 7: Consultation and Coordination – PDF, 67 kb
|
| Chapter 8: References – PDF, 148 kb
|
| Chapter 9: Glossary – PDF, 98 kb
|
| Chapter 10 – SEIS Distribution List – PDF, 135 kb
|
| March 2012, Record of Decision for Parcel E-2 - PDF 23.2MB
|
| March 2012, FINAL Supplemental Environmental Impact Statement for the Disposal and Reuse of Hunters Point Shipyard, San Francisco, California - Volume 2: Appendices A through P (Cover and Title Page) – PDF, 625kb
|
| Appendix A: Public Notices - PDF, 1.6 MB
|
| Appendix B: Public Scoping - PDF, 1.6 MB
|
| Appendix C: Public Hearing and Draft SEIS Comments and Responses - PDF, 8.4 MB
|
| Appendix D: Agency Consultation - PDF, 1.1 MB
|
| Appendix E: Proposition G – Bayview Jobs, Parks, and Housing Initiative - PDF, 2.5 MB
|
| Appendix F: BCDC Consistency Determination - PDF, 795 kb
|
| Appendix G: Utilities Resource Data - PDF, 248 kb
|
| Appendix H: Proposed Shoreline Improvements - PDF, 344 kb
|
| Appendix I: Special Status Species - PDF, 473 kb
|
| Appendix J: Air Emissions Calculations - PDF, 1.4 MB
|
| Appendix K: Noise Resource Data - PDF, 520 kb
|
| Appendix L: Transportation, Traffic, and Circulation Resource Data - PDF, 8.6 MB
|
| Appendix M: 1993 Baseline Impacts Analysis - PDF, 897 kb
|
| Appendix N: Infrastructure - PDF, 24 MB
|
| Appendix O: Community Benefits Plan - PDF, 132 kb
|
| Appendix P: Below-Market Rate Housing Plan - PDF, 1.4 MB
|
| September 2011, Parcel E-2 Proposed Plan - PDF, 2.3 MB
|
| August 2011, Annual Operation and Maintenance Report 2010-2011, Parcel E-2, Industrial Landfill - PDF, 3 MB
|
| September 2010, Final Record of Decision for Parcel C - PDF, 3 MB
|
| ATTACHMENT 1: Applicable or Revelant and Appropriate Requirements - PDF, 531 kb
|
| ATTACHMENT 2: Responsiveness Summary - PDF, 130 kb
|
| ATTACHMENT 3: References - PDF, 43 MB
|
| ATTACHMENT 4: Administrative Record - PDF, 428 kb
|
| September 2009, Draft Amended Action Memorandum - Time-Critical Removal Action For the PCB Hot Spot Area at Parcel E-2 Revision 2009 - PDF, 8.7 MB
|
| May 2009, Design Basis Report - Intallation Restoration Sites 7 and 18 Parcel B - PDF, 3.4 MB
|
| APPENDIX A-O: - PDF, 3.7 MB
|
| ATTACHMENT 1: Design Construction Drawings - PDF, 7.7 MB
|
| ATTACHMENT 2: Construction Specifications - PDF, 720 kb
|
| ATTACHMENT 3: Stability Evaluation Report - PDF, 800 kb
|
| February 2009, Draft Record of Decision for Parcels D-1 and UC-1 - PDF, 2.3 MB
|
| ATTACHMENT A: Applicable or Revelant and Appropriate Requirements - PDF, 585 kb
|
| ATTACHMENT B: Responsiveness Summary - PDF, 537 kb
|
| ATTACHMENT C: References - PDF, 484 kb
|
| ATTACHMENT D: Administrative Record Index - PDF, 484 kb
|
| February 2009, Draft Final Remedial Investigation/Feasibility Study Report for Parcel E-2 (EXECUTIVE SUMMARY: FOR COMPLETE REPORT AND APPENDICES (~900 MB) PLEASE REQUEST COPY THROUGH THE NAVY BRAC WEBMASTER) - PDF, 1.1 MB
|
| November 2008, Final Second Five-Year Review Report of Remedial Actions at Hunters Point Shipyard - PDF, 14 MB
|
| August 2008, Parcel D-2 Draft Record of Decision (ROD) for No Action - PDF 1 MB
|
| Parcel D-2 Draft ROD for No Action: ATTACHMENT A REFERENCES - PDF, 6 MB
|
| August 2008, Parcel G Draft Record of Decision (ROD) - PDF 4.8 MB
|
| Parcel G Draft ROD: ATTACHMENT A APPLICABLE OR RELEVANT AND APPROPRIATE REQUIREMENTS - PDF, 434 kb
|
| Parcel G Draft ROD: ATTACHMENT B RESPONSIVENESS SUMMARY - PDF, 405 kb
|
| Parcel G Draft ROD: ATTACHMENT C INSTITUTIONAL CONTROL CHECKLIST - PDF, 377 kb
|
| Parcel G Draft ROD: ATTACHMENT D REFERENCES - PDF, 32 MB
|
| August 2008, Draft Amended Parcel B Record of Decision (ROD), Hunters Point Shipyard - PDF, 5.67 MB
|
| Historical Radiological Assessment, Use of General Radioactive Materials (1939-2003), Hunters Point Shipyard - PDF, 48 MB
|
| April 2006, Final Basewide Radiological Removal Action, Action Memo Revision 2006, Hunters Point Shipyard - PDF, 4.5 MB
|
| November 2000, Record of Decision for the Disposal and
Reuse of Hunters Point Shipyard - PDF, 200 kb
|
| March 2000, Final Environmental Impact Statement for the Disposal and Reuse of Hunters Point Shipyard, Volume 1 - PDF, 17 MB
|
| March 2000, Final Environmental Impact Statement for the Disposal and Reuse of Hunters Point Shipyard, Volume 2 - PDF, 10 MB
|
| November 29, 2001 RAB Slide Show
|
| D Utilidors RAB ver. 1
|
|
| Fact Sheets | February 2012, Fact Sheet: Completion of Parcel E-2 PCB Hot Spot Area Removal - PDF, 972 kb
|
| September 2011, Frequently Asked Questions About the Shipyard Landfill - PDF, 3 MB
|
| September 2011, Fact Sheet: Summary of the Navy's Proposed Cleanup of Parcel E-2 - PDF, 3 MB
|
| January 2011, Fact Sheet: Remedial Action at Site 07 and 18 of Parcel B - PDF, 178 kb
|
| October 2009, FACT SHEET - Parcel E-2 PCB Hot Spot Time-Critical Removal Action: 2010 - PDF, 5.4 MB
|
| June 2009, FACT SHEET - A Snap Shot of Hunters Point Shipyard - PDF, 3.8 MB
|
| March 2004, Fact Sheet #6/Hunters Point Shipyard HRA
|
| February 2004, Fact Sheet #5/Hunters Point Shipyard HRA
|
| November 2003, Fact Sheet #10/Hunters Point Shipyard Installation Restoration Program
|
| October 2003, Fact Sheet #4/Hunters Point Shipyard HRA
|
| September 2003, Fact Sheet #3/Hunters Point Shipyard HRA
|
| May 5, 2003, Fact Sheet #2/Hunters Point Shipyard Historical Radiological Assessment (HRA)
|
| March 12, 2003, Fact Sheet #1/Hunters Point Shipyard Historical Radiological Assessment (HRA)
|
| July 25, 2001, Fact Sheet/Hunters Point Shipyard Formerly Utilized Defense Sites (FUDS)
|
| June 19, 2001, Fact Sheet/Hunters Point Shipyard Parcel B Sandblast Grit Fact Sheet
|
| May 24, 2001, Fact Sheet/Hunters Point Annex Radiological Activities Summary
|
| December 15, 2000, Fact Sheet/Hunters Point Shipyard Radiological Remove Action
|
| October 24, 2000, Fact Sheet #3/ Parcel E Landfill Fire Update
|
| September 18, 2000, Fact Sheet#2/ Parcel E Landfill Notification
|
| September 8, 2000, Fact Sheet #1/ Parcel E Landfill Fire Notification
|
|
| Air Monitoring Data | Jul 2010 - Nov 14 2012, PCB Hot Spot Area at Parcel E-2- PDF, 1.52 MB
|
| June 25 2012 - Sep 26 2012, Ship Shielding Range TCRA at Parcel E-2 PDF, 726 kb
|
| Jun 2010 - Jun 2011, IR Sites 7/18 Remedial Action - PDF, 2 MB
|
| October 2010, Air Monitoring (MAY 2005 through October 2010) - PDF, 542 kb
|
| May 2010, Air Monitoring (MAY 2005 through MAY 2010) - PDF, 486 kb
|
| December 2009, Air Monitoring (MAR 2007 through DEC 2009) - PDF, 264 kb
|
| September 2009, Air Monitoring (MAR 2007 through SEP 2009) - PDF, 90 kb
|
| September 2009, Figure 5-1 Hunters Point Shipyard Air Monitoring Locations - PDF, 540 kb
|
| January 2009, Air Monitoring (MAR 2007 through JAN 2009) - PDF, 70 kb
|
| October 2007, Sewer Excavation Air Monitoring Data - Asbestos (MAR 2007 through OCT 2007) - XLS, 31 kb
|
| October 2007, Sewer Excavation Air Monitoring Data - PM10 (MAR 2007 through OCT 2007) - XLS, 31 kb
|
| October 2007, Sewer Excavation Air Monitoring Data - TSP, Mn (MAR 2007 through OCT 2007) - XLS, 28 kb
|
|
| Parcel E-2 Landfill | November 2012, FINAL Record of Decision for Parcel E-2, PDF - 22 MB
|
| October 24, 2011 - City of San Francisco Board of Supervisors E-2 Presentation - PDF, 4.4 MB
|
| September 2011, Public Presentation: Proposed Plan for Parcel E-2 - PDF, 4.2 MB
|
| September 2011, Parcel E-2 Proposed Plan - PDF, 2.3 MB
|
| September 2011, Fact Sheet: Summary of the Navy's Proposed Cleanup of Parcel E-2 - PDF, 3 MB
|
| September 2011, Frequently Asked Questions About the Shipyard Landfill - PDF, 3 MB
|
| August 2011, Annual Operation and Maintenance Report 2010-2011, Parcel E-2, Industrial Landfill - PDF, 3 MB
|
| May 2011, Remedial Investigation/Feasibility Study Report for Parcel E-2 (Cover - Section 3) - PDF, 14 MB
|
| Section 4 - PDF, 6 MB
|
| Section 5 - PDF, 10 MB
|
| Section 6 - 10 - PDF, 4.3 MB
|
| Section 11 - 15 - PDF, 14.7 MB
|
|
| Parcels E and UC-3 | February 2013, Parcels E and UC-3 Proposed Plan - PDF, 1.76 MB
|
| February 2013, Notice of Proposed Plan and Public Comment Period for Parcels E and UC-3 - PDF, 10 kb
|
| February 2013, Fact Sheet: Summary of the Proposed Plan for Parcels E and UC-3 - PDF, 581 kb
|
| August 2012, Final Feasibility Study Report for Parcel E - PDF, 27.5 MB
|
| August 2012, Final Radiological Addendum to the Feasibility Study Report for Parcel E - PDF, 14 MB
|
|
| Meeting Material | September 20, 2012: TENANT MEETING PRESENTATION, Remedial Action in Parcel B (Excluding Sites 7 & 18) - PDF, 2.4 MB
|
| May 28, 2009: MEETING PRESENTATION, Remedial Investigation/Feasibility Study Report Summary for Parcel E-2 - PDF, 3 MB
|
| April 29, 2009: ENVIRONMENTAL FORUM AGENDA, Former NSY Hunters Point - PDF, 66 kb
|
| April 29, 2009: ENVIRONMENTAL FORUM PRESENTATION, Remedial Design for Sites 7 and 18 Parcel B - PDF, 2.2 MB
|
| April 29, 2009: ENVIRONMENTAL FORUM PRESENTATION, Record of Decision Parcels D-1 and UC-1 - PDF, 844 kb
|
| April 29, 2009: ENVIRONMENTAL FORUM PRESENTATION, Zero-Valent Iron Groundwater Cleanup Study - PDF, 1.7 MB
|
| April 29, 2009: ENVIRONMENTAL FORUM PRESENTATION, Parcel B Petroleum Program, PDF - 1.6 MB
|
| April 14, 2009: MEETING AGENDA, Best Management Practices for Dust Control and Mitigation - PDF, 71 kb
|
| April 14, 2009: MEETING PRESENTATION, Current Hunters Point Projects and Dust Mitigation Practices - PDF, 2.1 MB
|
| April 14, 2009: MEETING COMMENT SHEET, Former NSY Hunters Point - PDF, 50 kb
|
|
| Other | Third Quarter 2012, Hunters Point Naval Shipyard Outreach Update - PDF, 666 kb
|
| Second Quarter 2012, Hunters Point Naval Shipyard Outreach Update - PDF, 670 kb
|
| June 2012, Fact Sheet: Summer 2012 Environmental Cleanup Activity Update - PDF, 610 kb
|
| April 2012, Fact Sheet: Draft Parcel E-2 Record of Decision Summary of Responses to Community - PDF, 525 kb
|
| March 2012, Hunters Point Naval Shipyard General Overview - PDF, 472 kb
|
| First Quarter 2012, Hunters Point Naval Shipyard Outreach Update - PDF, 585 kb
|
| Spring 2012, Hunters Point Naval Shipyard Outreach Update - PDF, 624 kb
|
| February 2012: Hunters Point Naval Shipyard 2012 Community Events Calendar - PDF, 350 kb
|
| 2012 Annual Update of Cleanup Achievements - PDF, 1.2 MB
|
| May 2011 - FINAL Community Involvement Plan: Hunters Point Shipyard - PDF, 4.2 MB
|
| June 2009: Snap Shot - PDF, 3.8 MB
|
| December 2008: Monthly Progress Report - PDF, 2 MB
|
| October 2008: Monthly Progress Report - PDF, 2 MB
|
| September 2008: Monthly Progress Report - PDF, 1.5 MB
|
| August 2008: Monthly Progress Report - PDF, 1.2 MB
|
| July 2008: Monthly Progress Report - PDF, 740 kb
|
| June 2008: Monthly Progress Report - PDF, 690 kb
|
| May 2008: Monthly Progress Report - PDF, 711 kb
|
| April 2008: Monthly Progress Report - PDF, 684 kb
|
| April 2008: HPS Basewide Map - PDF, 196 kb
|
| March 2008: Monthly Progress Report - PDF, 716 kb
|
| February 2008: Monthly Progress Report - PDF, 674 kb
|
| January 2008: Monthly Progress Report - PDF, 549 kb
|
| December 2007: Monthly Progress Report - PDF, 747 kb
|
| October 2007: Monthly Progress Report - PDF, 728 kb
|
| September 2007: Monthly Progress Report - PDF, 479 kb
|
| August 2007: Monthly Progress Report - PDF, 123 kb
|
| June 2007: Monthly Progress Report - PDF, 946 kb
|
| May 2007: Monthly Progress Report - unavailable
|
| April 2007: Monthly Progress Report - PDF, 387 kb
|
| February 2007: Monthly Progress Report - PDF, 391 kb
|
| January 2007: Monthly Progress Report - PDF, 450 kb
|
| December 2006: Monthly Progress Report - PDF, 450 kb
|
| October 2006: Monthly Progress Report - PDF, 426 kb
|
| October 2006: HPS Aerial Parcel Map - PDF, 5.91 MB
|
| September 2006: Monthly Progress Report - PDF, 463 kb
|
| August 2006: Monthly Progress Report - PDF, 465 kb
|
| July 2006: Monthly Progress Report - PDF, 1.37 MB
|
| June 2006: Monthly Progress Report - PDF, 432 kb
|
| May 2006: Monthly Progress Report - PDF, 108 kb
|
| May 2006: Monthly Progress Report - PDF, 477 kb
|
| April 2006: Monthly Progress Report - PDF, 439 kb
|
| April 2006: Monthly Progress Report - PDF, 439 kb
|
| March 2006: Monthly Progress Report - PDF, 498 kb
|
| February 2006: Monthly Progress Report - PDF, 428 kb
|
| January 2006: Monthly Progress Report - PDF, 387 kb
|
| October/November 2005: Monthly Progress Report - PDF, 405 kb
|
| October 2005: Monthly Progress Report - PDF, 381 kb
|
| September 2005: Navy Monthly Progress Report - PDF, 489 kb
|
| July 2005: Monthly Progress Report - PDF, 3.28 MB
|
| June 2005: Monthly Progress Report - PDF, 439 kb
|
| May 2005: Monthly Progress Report - PDF, 391 kb
|
| April 2005: Monthly Progress Report - PDF, 406 kb
|
| March 2005: Monthly Progress Report - PDF, 384 kb
|
| March 27, 2004, Flyer / Business Contracting Expo Opportunities at HPS
|
| Summer-Fall 2003, Newsletter/Environmental Cleanup
|
| April-September 2002, Newsletter/Environmental Cleanup
|
| January-March 2002, Newsletter/Environmental Cleanup
|
| October-December 2001, Newsletter/ Parcel B Remediation Action
|
| August 17, 2001: Final Community Involvement Plan
|
| July-September 2001, Newsletter/ Parcel D Soil and Pipeline Removal Action Cleanup Completed
|
| April-June 2001, Newsletter/ Environmental Cleanup
|
| January-March 2001, Newsletter/Parcel E - Smoldering Area at Landfill Capped and Extinguished
|
| October-December 2000, Newsletter/Parcel E Capping and Fire Update
|
| September 10, 2000: Newsletter/ Parcel B Cleanup Moving Forward
|
| June 6, 2000, Newsletter/ What is Hunters Point Shipyard?
|
|
| Press Releases | | Public Notices | October 2011, Notice of Extension of Proposed Plan Public Comment Period for Parcel E-2 - PDF, 12 kb
|
| April 2011, NOTICE OF EXTENSION OF PUBLIC COMMENT PERIOD FOR THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR THE DISPOSAL AND REUSE OF HUNTERS POINT NAVAL SHIPYARD, SAN FRANCISCO, CALIFORNIA - PDF, 35 kb
|
| February 2011 - Notice of Availability: Draft Supplemental Environmental Impact Statement (SEIS) for the disposal and reuse of Hunters Point Naval Shipyard - PDF, 53 kb
|
| February 2010, Draft Community Involvement Plan (CIP) Questionnaire - DOC, 75 kb
|
| December 2009, Memorandum - Hunters Point Restoration Advisory Board (RAB) - PDF, 26 kb
|
| December 2009, BRAC Program Management Office West Recommendation to Dissolve the Hunters Point Restoration Advisory Board - PDF, 560 kb
|
| September 2009, Public Notice & Comment Period: Hunters Point Shipyard - PDF, 74 kb
|
| September 2009, Proposal to Dissolve the Hunters Point Restoration Advisory Board (RAB) - PDF, 2.2 MB
|
| May 2009, Restoration Advisory Board (RAB) Notice of Intent to dissolve letter, PDF - 54 kb
|
| July 2008, Parcel D Proposed Plan - PDF, 4.31 MB
|
| June 2008, Parcel B Proposed Plan (REVISED) - PDF, 1.38 MB
|
|
|
View/Hide Image Gallery
Click on an image to enlarge, or roll cursor over an image for its description. |
|
View/Hide Contact Information
View/Hide Links
|
|