In order to view the Minutes below you MUST have Acrobat Reader installed on your computer click on the link to get your free copy.
Printer Friendly List | Minutes 180 through 312 | Minutes by Project | Treaties
Min. # |
Title | Date Signed |
---|---|---|
Exchange of credentials of members of both Sections of the Commission |
October 3, 1922 |
|
Mexican Commissioner requested investigation of certain bank and obstruction cases; American Commissioner suggested their submission in writing for consideration. |
October 3, 1922 |
|
Consulting Engineers instructed to investigate case or construction of dam in Rio Grande opposite Colonia " El Porvenir. " |
October 16, 1922 |
|
Consulting Engineers instructed to make investigation of Banco 'El Real de San Lorenzo." |
October 16, 1922 |
|
Consulting Engineers instructed to make investigation of claims of Compania Agricola to property rights over certain land in Zaragoza Area |
October 16, 1922 |
|
Consulting Engineers requested to make inspection of obstructions near Santa Fe Bridge upstream contrary to 28, 1917 agreement related to flood protection works. |
October 16, 1922 |
|
Consulting Engineers instructed to make inspection of protective works on left bank of Rio Grande in the neighborhood of Isla de Cordova and advise if their destruction should be ordered. |
October 16, 1922 |
|
Channel of Rio Grande at point called "El Mulato" ordered marked by stakes. |
October 16, 1922 |
|
Concerning drainage and protection of the El Paso Valley against floods of the river by committee of Engineers on Rivers and Harbors, in cooperation with Mexican Engineers assigned to this study. |
October 16, 1922 |
|
Mexican Consulting Engineer instructed to make investigation of petition of City of El Paso for permission to extend end of sewer pipe which runs from transformation plant toward river. |
October 16, 1922 |
|
Minutes 3, 4, 5, 6, 7, 8, 9 and 10 were read, approved, and signed by members of Commission. |
November 14, 1922 |
|
Gustavo P. Serrano presented credentials as Commissioner and presented Armando Santacruz, Jr., as Consulting Engineer. Commissioner Curry stated that due to diplomatic relations at time Minutes 1-11 the state were passed, it was necessary to ratify them, now that diplomatic relations were renewed and did so. |
November 27, 1923 |
|
Plans for the study of bancos for elimination between El Paso and Rio Grande City pending until funds are available. |
November 27, 1923 |
|
Survey and report on "Beaver" or "Morteritos" Island instructed to be made in order that decision regarding boundary line might be made. |
November 27, 1923 |
|
Matter of fence along boundary line on "San Hizario" Island and on "Cordova Island. |
November 27, 1923 |
|
Protection works referred to in Minute No. 7 near Cordova Island had been removed by City of El Paso. Case now closed. |
November 28, 1923 |
|
Reference Minute No. 10-City of El Paso decided not to extend sewer pipe into bed of Rio Grande. Case therefore closed. |
November 28, 1923 |
|
Credentials of Armando Santacruz, Jr., presented as Consulting Engineer of Mexican Section. Consulting Engineers requested to make joint report regarding replacement of monument on International Bridge between Laredo, Texas and Nuevo Laredo, Tamaulipas. |
December 7, 1923 |
|
Consulting Engineers requested to report in writing if obstructions placed in river near Brownsville have been fully removed. |
December 7, 1923 |
|
Reference Minute No. 14. Survey ordered to be made immediately upon conclusion of work at San Elizario. "Beaver Island." |
December 8, 1923 |
|
Consulting Engineers requested to submit full report on proposed international boundary line on "Beaver Island." |
December 12, 1923 |
|
Reference Minute No. 18. Consulting Engineers ordered to make investigation relative to replacement of monuments of bridge at Laredo, in connection with trip relative to "Beaver Island" matter. |
December 12, 1923 |
|
Reference Minute No. 19. Consulting Engineers ordered to make investigation to see if obstruction placed in river near Brownsville had been completely removed, in connection with trip relative to "Beaver Island" matter. |
December 12, 1923 |
|
Consulting Engineers instructed to investigate and report on conditions regarding obstructions in Rio Grande near Santa Fe Bridge. Case closed December 27, 1923 |
December 12, 1923 |
|
Consulting Engineers instructed to investigate and report relative to removal of Obstructions in Rio Grande constructed by Wells, Stillwell and Spears, opposite colony "El Porvenir," Chihuahua. Case Closed December 22, 1923. |
December 12, 1923 |
|
Engineers of Commission instructed to cooperate with Engineers Arroyo and Lawson in connection with flood control and river rectification. |
February 17, 1924 |
|
Consulting Engineers instructed to examine and report on proposed bridge plans for new concrete structure at Stanton Bridge. |
March 3, 1924 |
|
Minutes Nos. 26 and 27 read and approved |
March 10, 1924 |
|
Report of Consulting Engineers on Stanton Street Bridge submitted. Permit for this bridge approved subject to conditions as set forth in report of Consulting Engineers. |
March 11, 1924 |
|
Reference Minute No. 25 and Consulting Engineers' report dated December 22, 1923. Report approved and case considered closed. (Wells, Stillwell and Spear). |
March 11, 1924 |
|
Reference Minute No. 24 and Consulting Engineers' report of December 27, 1923. Report approved and case considered closed. ( Obstruction near Santa Fe Bridge ). |
March 11, 1924 |
|
Instructions given Consulting Engineers for construction and placing of markers in English and Spanish on gaging stations |
March 11, 1924 |
|
Meeting of Salvador Arroyo and L. M. Lawson before session of the Joint Commission relative to Proposed Protective Work in El Paso Valley called also hastan consulting engineers trip to Beaver Island. |
March 11, 1924 |
|
Messrs. Lawson and Arroyo stated joint report to be submitted within ten days on Proposed Protective Works in El Paso Valley. |
March 12, 1924 |
|
Messrs. Lawson and Arroyo presented preliminary statement and maps re protection work in El Paso Valley. Requested to make further detailed report and estimate of proposed work |
April 2, 1924 |
|
Report of Messrs. Lawson and Arroyo presented to City and County officials. Preliminary report approved and request made to expedite completion of final report. |
April 3, 1924 |
|
Reference Minutes 27 and 29-construction of the new concrete bridge at Stanton Street. |
April 10, 1924 |
|
Credentials of Joaquin C. Bustamante presented as First Engineer of Mexican Section. Reference Minutes Nos. 19 and 23-report made that Obstruction had been removed and case considered closed. (Brownsville) |
May 9, 1924 |
|
Reference-Minutes Nos. 18 and 22, replacement of international boundary monument on bridge at Laredo, Texas |
May 9, 1924 |
|
Memorandum presented by Mexican Section regarding presentation to Boundary Commission of Projects proposed by individuals or either Government for approval in advance. |
May 12, 1924 |
|
Petition for five cutoffs in the Rio Grande on San Elizario Island between Monument No. 21 and town of Fabnes. |
June 3, 1924 |
|
Tornillo, Texas-meeting of representatives of El Paso and Hudspeth Counties with interested land owners and Commission re cutoffs on San Elizario Island. |
June 6, 1924 |
|
Guadalupe, Chihuahua-meeting of representatives of El Paso and Hudspeth Counties with interested land owners of Mexico and Commission re cutoffs on San Elizario Island |
June 6, 1924 |
|
Reports of Messrs. Lawson and Arroyo re San Elizario Island cutoffs referred to Consulting Engineers, and Consulting Engineers requested to submit report. |
June 11, 1924 |
|
Report of Consulting Engineers re San Elizario Island cutoffs presentedand approved and maps signed. |
July 7, 1924 |
|
Regarding appointment of committee on equitable distribution of waters of Rio Grande below Ft. Quitman |
July 8, 1924 |
|
American Commission recommends approval of cutoffs Nos. 1, 2, and A, and rejection of 4, 5, and 3 on San Elizario Island. Final decision deferred pending further study and report. |
July 10, 1924 |
|
Report of Consulting Engineers regarding protective works on RioGrande at Matamoros submitted. |
July 11, 1924 |
|
Messrs. Lawson and Arroyo submitted report on proposed cutoffs on San Elizario Island, which report was approved. |
September 8, 1924 |
|
Plans for survey and elimination of bancos on Rio Grande from El Paso to Ft. Quitman. |
October 2, 1924 |
|
Re air survey of Rio Grande between El Paso and Ft. Quitman in connection with elimination of bancos. |
October 2, 1924 |
|
Report and maps of Consulting Engineers on case of Beaver Island or Isla de Morteritos submitted. |
October 23, 1924 |
|
Report submitted by Hidalgo County Water Improvement District No. 2 for permission to make cutoff in Rio Grande near town of Hidalgo. |
February 3, 1925 |
|
Reference Minute No. 48-Report of Mexican Commission for flood control works submitted and Consulting Engineers asked to report. |
February 27, 1925 |
|
Final report on flood protection in El Paso Valley submitted by Messrs. Lawson and Arroyo and verbal statement made. Consulting Engineers requested to make written report. |
April 29, 1925 |
|
Reference Minute No. 53-petition by Hidalgo County Water Improvement District No. 2. |
May 4, 1925 |
|
Report of Consulting Engineers submitted relative to construction of revetment on Rio Grande near Matamoros. |
May 27, 1925 |
|
Regarding obstruction placed in river near McNary by Messrs. Wells, Stillwell and Spears |
June 1, 1925 |
|
Report of Consulting Engineers relative to proposed flood works presented. Mr. Burges asked to report attitude of both City and County. |
June 2, 1925 |
|
Reference Minute No. 58-After consideration obstructions referred to near McNary placed by Messrs. Wells, Stillwell and Spears are to be allowed to remain. |
June 5, 1925 |
|
Recommendations made by Messrs. Lawson and Arroyo re river Rectification and protection approved. |
June 23, 1925 |
|
Reference Minutes Nos. 53 and 56-Petition of Hidalgo County Water Improvement District No. 2-Report of Consulting Engineers submitted. |
June 29, 1925 |
|
Re division works of Tornillo Canal on Rio Grande at San Elizario Island-Mr. Lawson requested to report. |
July 17, 1925 |
|
Report of Consulting Engineers relative to Mr. Lawson's report re division works of Tornillo Canal on Rio Grande at San Elizario Island |
Autust 25, 1925 |
|
Report of Consulting Engineers re topographic survey made in El Paso Valley for elimination of bancos |
September 10, 1925 |
|
Credentials of Clark W. Creps presented as Secretary of American Section. Petition of J.M. Escajeda regarding change of river near Tornillo canal |
October 16, 1925 |
|
Consulting Engineers requested to make thorough investigation of files and field notes of surveys made in Presidio and adjacent valley re elimination of bancos. |
October 17, 1925 |
|
Petition for 3 cutoffs between Fabens and Monument No. 21 presented by C. W. Bickley-Petition was rejected. |
October 30, 1925 |
|
Consulting Engineers requested to make survey and investigation of certain banco cases. |
November 3, 1925 |
|
Consulting Engineers instructed to make survey of Colorado River and and investigate changes. Aerial survey suggested. |
January 14, 1926 |
|
Repairing of Monuments on western boundary to be continued-cost to be divided. |
January 14, 1926 |
|
Report of Consulting Engineers re banco cases in Presidio and El Mulato Valleys presented. |
January 26, 1926 |
|
Relative to artificial cutoffs made in Rio Grande within the Island of San Elizario. Reference Minute No. 66. Further investigation to be made. |
January 28, 1926 |
|
Renew bridge between Presidio, Texas and Ojinaga, Chihuahua,Consulting Engineers asked to report. |
March 17, 1926 |
|
Reference Minute No. 74-Consulting Engineers' report received. No objection to construction of bridge at Presidio. |
April 6, 1926 |
|
Danger of obstruction in Rio Grande near Santa Fe Street bridge. |
April 6, 1926 |
|
Report of Consulting Engineers re obstructions in Rio Grande received and considered. |
July 15, 1926 |
|
Report of Consulting Engineers re erection of standard Monument No. 204-A near left bank of Colorado River presented and map signed |
July 15, 1926 |
|
Report of Consulting Engineers re erection of standard Monument No.142-A near San Miguel, Arizona, presented and map signed and approved. |
July 15, 1926 |
|
Re swimming pool built on left of Rio Grande at Laredo, Texas. Must be removed. |
July 15, 1926 |
|
Report of Consulting Engineers re placing repairing and painting of Monuments on Boundary line from Rio Grande to Pacific Ocean presented and approved. |
July 28, 1926 |
|
Embankment constructed across bed of Rio Grande at upper end of Elam cut ordered removed and river restored to original channel. |
July 28, 1926 |
|
Re survey of portion of Colorado River that forms boundary between U.S. and Mexico. Meeting to be held in Yuma |
August 4, 1926 |
|
Meeting called for September 17 at Yuma, Arizona re alleged Farmers banco. |
September 8, 1926 |
|
Yuma, Arizona-Testimony re Farmers and Fain Bancos. |
September 17, 1926 |
|
Re survey of El Paso Valley for elimination of bancos. |
October 1, 1926 |
|
Re topographical survey of the Lower Rio Grande and investigations for elimination of bancos between Roma and the Gulf. |
October 1, 1926 |
|
Re monument at International Boundary line on bridge across the Rio Grande at Hidalgo, Texas and Reynosa, Tamaulipas. |
October 2, 1926 |
|
Report of Consulting Engineers on erection of monument on the international boundary between Hidalgo, Texas and Reynosa, Tamaulipas received. |
December 2, 1926 |
|
Monument to be placed on bridge across Rio Grande between Eagle Pass, Texas and Piedras Negras, Coahuila |
December 24, 1926 |
|
Re construction of new bridge at Brownsville, Texas |
January 13, 1927 |
|
Report of Consulting Engineers presented and map signed re monument on bridge across Rio Grande between Eagle Pass, Texas and Piedras Negras, coahuila. |
March 21, 1927 |
|
Report of consulting Engineers re dam construction on Rio Grande above Haciendita, Texas. |
March 22, 1927 |
|
Consulting Engineers instructed to survey bancos in vicinity of EaglePass upon completion of surveys in Lower Rio Grande. |
April 12, 1927 |
|
Maps showing survey in 1911 of the Lower Rio Grande from Roma toGulf made by Joint Commission-after careful comparison to be certified. |
April 12, 1927 |
|
Brownsville, Texas-re survey and inspection of 40 alleged bancos. |
April 22, 1927 |
|
Credentials of Lawrence M. Lawson presented as Commissioner,study to be made of an international convention for rectification of Rio Grande. |
June 4, 1927 |
|
Instructions to be asked of Government re outlining proposed treatybetween U.S. and Mexico |
June 7, 1927 |
|
Re accretions lands on Colorado River-also Farmers and Fain Bancos.Decision reached. |
October 26, 1927 |
|
Consulting Engineers instructed to make survey in Presidio and adjacent valley for elimination of bancos. |
November 23, 1927 |
|
Petition of users of San Agustin Canal in Juarez Valley to construct a temporary diversion dam in the Rio Grande. |
February 27, 1928 |
|
Consulting Engineers ordered to investigate and survey the change in the channel of the Rio Grande at Campo Grande Arroyo. |
February 27, 1928 |
|
Joint Commission meeting at Rio Grande City to examine case of alleged Banco No. 91, "Las Adjuntas." |
April 21, 1928 |
|
Elimination of Bancos Nos. 90 and 92 thru 131 |
April 23, 1928 |
|
Erection of Monument on bridge between Roma, Texas, and San Pedro de Mier, Tamaulipas. |
May 26, 1928 |
|
Elimination of Banco No. 91 "Las Adjuntas." |
May 26, 1928 |
|
Consulting Engineers requested to report on existing conditions between the levees on the North and South sides of the Rio Grande between El Paso and Juarez |
May 29, 1928 |
|
Commissioners approved report of Consulting Engineers -erection of monument marking international boundary line on bridge between Brownsville, Texas and Matamoros, Tamaulipas. |
October 19, 1928 |
|
Commissioners approved report of Consulting Engineers -erection of monument marking international boundary line on bridge between Mercedes, Texas and San Rafael, Tamaulipas |
October 19, 1928 |
|
Petition for protection works on the Mexican margin of Rio Grande in vicinity of Pumping Plant of Villa Nueva, Texas. |
October 29, 1928 |
|
Preliminary report on stabilization of the boundary line and rectification of the Rio Grande by the Commissioners. |
December 21, 1928 |
|
Commissioners approved report of Consulting Engineers -erection of monument marking international boundary line on bridge between Zapata, Texas and Ciudad Guerrero, Tamaulipas. |
May 18, 1929 |
|
Commissioners approved report of Consulting Engineers-erection of monument marking international boundary line on bridge between Ysleta, Texas an Zaragosa, Chihuahua |
July 3, 1929 |
|
Controversy over lands alleged to be accretions to La Puerta Banco No. 59. Consulting Engineers ordered to investigate. |
July 22, 1929 |
|
Commissioners approved report of Consulting Engineers -erection of monument marking international boundary line on bridge between Zapata, Texas and Ciudad Guerrero, Tamaulipas. |
July 30, 1929 |
|
Commissioners approved report of Consulting Engineers-accretions near "La Puerta" Banco No. 59 |
August 10, 1929 |
|
Obstructions in Rio Grande between foundation of McMahan building And north abutment of Santa Fe Bridge. |
November 30, 1929 |
|
Levee for protection of town of Guadalupe, Chihuahua |
December 30, 1929 |
|
Hearing of parties interested in alleged bancos pending for elimination in Presidio and adjacent valleys. |
February 4, 1930 |
|
Investigation of five tracts of land in the Presidio Valley, during February. Forty witnesses heard. |
February 19, 1930 |
|
Meeting of the Commission with all parties interested in bancos pending elimination in the El Paso Valley. |
March 3, 1930 |
|
Elimination of Weber Banco |
March 18, 1930 |
|
Elimination of San Lorenzo Banco |
March 21, 1930 |
|
Elimination of Gallego and Nunez Bancos |
April 9, 1930 |
|
Elimination of La Cachanilla, Rinco de Marcelino and Camp Rice Bancos |
April 25, 1930 |
|
Elimination of El Carino Banco |
April 28, 1930 |
|
Elimination of Las Piedras and Max Muller Bancos |
May 1, 1930 |
|
Rectification of the Rio Grande. Meeting called for development of final plans |
July 28, 1930 |
|
Report on Rio Grande Rectification |
July 31, 1930 |
|
Buchanan Case |
October 4, 1930 |
|
River Case |
October 20, 1930 |
|
Guadalupe Case |
October 21, 1930 |
|
General Map, El Paso-Juarez Valley |
March 21, 1931 |
|
Elimination of La Pacualilla and Morelos Bancos |
May 20, 1931 |
|
Claim of Mrs. Garcia Cuellar. Near Banco No. 120 "La Soledad." |
May 20, 1931 |
|
Elimination of La Pascualilla and Morelos Bancos. |
May 22, 1931 |
|
Monumentation of International Railroad Bridge between New Presidio, Texas and Nueva Ojinaga, Chihuahua. |
May 23, 1931 |
|
Elimination of El Morilo Banco |
February 25, 1932 |
|
Elimination of El Diablo Segundo Banco |
May 12, 1932 |
|
Boca Chica Bridge Project |
December 8, 1932 |
|
Elimination of Holinsworth Banco |
July 17, 1933 |
|
Elimination of Vilarreales Segundo Banco |
February 27, 1934 |
|
Illegal Obstructions in the Rio Grande; San Agustin, Dave Gill and Banderas Dams. (Not approved by Mexico.) |
May 28, 1934 |
|
Plans of final location of rectified channel of the Rio Grande in the El Paso-Juarez Valley |
June 14, 1934 |
|
Regulations pertaining to elimination of tracts segregated by the Rio Grande rectification works, pursuant to the February 1, 1933 Convention |
June 11, 1935 |
|
Action on Parcels Nos. 141 to 151, inclusive Rio Grande Rectification Projects, El Paso-Juarez Valley |
August 20, 1935 |
|
Action on Parcels Nos. 1, 9, 10, 24, and 25, Rio Grande Rectification Projects, El Paso-Juarez Valley. |
September 24, 1935 |
|
Works which each Government shall undertake on the Rio Grande Rectification Project in accordance with the Convention of February 1, 1933. |
October 28, 1935 |
|
Erection of additional monuments to mark the International Boundary line along Cordova Island ( Cordova Cut), El Paso-Juarez Valley |
November 8, 1935 |
|
Action on Parcels Nos. 2, 3, and 4, Rio Grande Rectification Project, El Paso-Juarez Valley |
December 13, 1935 |
|
Action on Parcels Nos. 107, 108, 109, 110, and 111, Rio Grande Rectification Project, El Paso-Juarez Valley. |
December 16, 1935 |
|
Actions on Parcels Nos. 130, 131, 132, 133, 134, 135, 136, 137, 138, 139, and 140, Rio Grande Rectification Project, El Paso-Juarez Valley |
June 3, 1936 |
|
Action on Parcels Nos. 5, 6, 7, 8, 11, 12, 13, 14, 15, 18, 20, 21, 21, 22, 23, 26, 27, 28, and 29, Rio Grande Rectification Project, El Paso-Juarez Valley. |
September 9, 1936 |
|
Action on Parcels Nos. 90, 91, 92, 93, 94, 95, 96, 97, 98, 99, 100, 101, 102, 103, 104, 105, and 106, Rio Grande Rectification Project, El Paso-Juarez Valley |
September 9, 1936 |
|
Action on Parcels Nos. 113, 114, 115, 116, 117, 118, 119, 120, 121, 122, 123, 125, 126, 127, 128 and 129, Rio Grande Rectification Project, El Paso-Juarez Valley |
December 9, 1936 |
|
Action on Parcels Nos. 16, 17, 30, 31, 74, 75, 76, 77, 78, 79, 80, 81, 82, 83, 84, 85, 86, 87, 88 and 89, Rio Grande Rectification Project, El Paso-Juarez Valley. |
February 27, 1937 |
|
Action on Parcels Nos. 37, 38, 39, 40, 41, 42, 43, 44, 45, 47, 48, 49 and 50, Rio Grande Rectification Project, El Paso-Juarez Valley |
May 10, 1937 |
|
Plan of Location of the Rectified Channel of the Rio Grande in the El Paso-Juarez Valley |
June 14, 1937 |
|
Plans of Final Location of Rectified Channel of the Rio Grande through San Elizario Island Area, El Paso-Juarez Valley. |
August 20, 1937 |
|
Adoption of an official pennant for use as a means of identification of vehicles operated by the personnel of the Commis sion in their travels across the international boundary on official business |
November 12, 1937 |
|
Plans for the allocation of work which the governments of the U.S. and Mexico shall undertake in the San Elizario Island area of the Rio Grande rectification project |
November 17, 1937 |
|
Action on Parcels Nos. 32, 33, 34, 35, 36, 51, 52, 53, 54, 55, 56, 57, 58, 59, 60, 61, 62, 63, 64, 65, 67, 68, 69, 70, 71, 72, 73, 112 and 124, Rio Grande Rectification Project El Paso-Juarez Valley |
February 15, 1938 |
|
Actions on parcels Nos. 152, 153, 154, 155, 156, 157, 158, 159, 160, 161, 162, 163, 164, 166, 167, 168, 169, 170, 171, 172, 173, 174 and 175, Rio Grande Rectification Project El Paso-Juarez Valley |
June 2, 1938 |
|
Actions on Parcels Nos. 46 and 66, Rio Grande Rectification Project, El Paso-Juarez Valley |
July 20, 1938 |
|
Rules and regulations for the maintenance and preservation of the Rio Grande Rectification Project in the El Paso-Juarez Valley |
August 13, 1938 |
|
Action of the Commission on the Elimination of Banco No. 137 " Lozano" in the Lower Rio Grande Valley |
April 3, 1939 |
|
Additional works which each Government shall undertake between kilometer 117.9 and kiloireter 135.0 of the Rio Grande Rectification Project in accordance with the Convention of February 1, 1933 |
May 15, 1939 |
|
Works which each Government should undertake on account of existing conditions in the Channel of the Rio Grande at El Paso, Texas, and Ciudad Juarez, Chihuahua |
December 20, 1939 |
|
Elimination of Bancos Nos. 138 " Progreso" and 139, "Las Flores" in the Lower Rio Grande Valley |
June 6, 1940 |
|
Elimination of Bancos Nos. 415 "San Antonio," 416 "Angostura," 147 "Casner," and 418 "Ruidosa" in the Presidio-Ojinaga Valley |
February 18, 1941 |
|
Elimination of Bancos Nos. 140 "Nogales" and 141 "Las Ruelas" on the Lower Rio Grande |
May 2, 1941 |
|
Monumentation of new bridge over the Rio Grande between Hidalgo, Texas and Reynosa, Tamaulipas |
August 30, 1941 |
|
Banco No. 142 "Las Palomas" - Lower Rio Grande |
Februar 27, 1942 |
|
Supplemental construction work which each government shouldundertake under the Convention of February 1, 1933, on account of existing conditions in the Rio Grande Rectification Project in the El Paso-Juarez Valley |
March 3, 1942 |
|
Bancos Nos. 143 "Rock Bend," 144 "La Pareda," 145 "Los Fresnos," 146 "Orribe" - Lower Rio Grande |
December 15, 1943 |
|
Upper Canyon Bancos Nos. 321 through 332 |
June 5, 1944 |
|
Bancos Nos. 147 "Weil" and 148 "Las Antonias" Lower Rio Grande |
December 21, 1944 |
|
Bancos Nos. 333 "El Comedor," 419 "Kilpatrick" 420 "Candelaria," 421 "Candela," 422 "Palo Blanco," 423 "Guadalupe," 424 "Tascate," 425 "Chinati," 426 "Mimbres," 427 "La Quemada," 428 "Buenavista," and 429 "Gleim." |
March 16, 1945 |
|
Bancos Nos. 149, 150, 151 and 152 |
June 29, 1945 |