2011-00046 |
BPA Records Manual, specific sections vanDijk, Richard
Date Received: 10/12/2010 Date Due: 11/9/2010 Date Completed: 10/18/2010
Comments: Responsive docs sent in their entirety. CLOSED.
|
|
2011-00056 |
Lou Driessen and Mike Johns BPA/Contractor retirement/hiring info vanDijk, Richard
Date Received: 10/12/2010 Date Due: 11/9/2010 Date Completed: 11/9/2010
Comments: Responsive docs sent. CLOSED.
|
|
2011-00102 |
Personal/BPA Outlook emails, etc. Fahey, Aimee
Date Received: 10/13/2010 Date Due: 11/10/2010 Date Completed: 11/5/2010
Comments: Withdrawn
|
|
2011-00121 |
Load 500KV Ostrander and Troutdale, Sifton vanDijk, Richard
Date Received: 10/22/2010 Date Due: 12/7/2010 Date Completed: 1/9/2011
Comments: Responsive docs sent on CD. CLOSED
|
|
2011-00122 |
Load Mint Farm Gen Stn vanDijk, Richard
Date Received: 10/22/2010 Date Due: 12/7/2010 Date Completed: 1/26/2011
Comments: 11.18.10 Extension (Ex 4 review)
|
|
2011-00123 |
Load Yale, Merwin, Swift Dams vanDijk, Richard
Date Received: 10/22/2010 Date Due: 12/7/2010 Date Completed: 1/19/2011
Comments: 11.18.10 Extension (Ex 4 review)
|
|
2011-00124 |
Load, Port Westward vanDijk, Richard
Date Received: 10/22/2010 Date Due: 12/7/2010 Date Completed: 1/19/2011
Comments: 11.18.10 Extension (Ex 4 review)
|
|
2011-00125 |
Load Beaver Gen Stn vanDijk, Richard
Date Received: 10/22/2010 Date Due: 12/7/2010 Date Completed: 1/19/2011
Comments: 11.18.10 Extension (Ex 4 review)
|
|
2011-00126 |
Load River Road Gen Facility vanDijk, Richard
Date Received: 10/22/2010 Date Due: 12/7/2010 Date Completed: 12/20/2010
Comments: Responsive docs sent on CD. CLOSED
|
|
2011-00157 |
HOT Committee info 5.10 to date Albright, Douglas
Date Received: 10/26/2010 Date Due: 11/18/2010 Date Completed: 11/18/2010
Comments: 1 Responsive doc sent. CLOSED
|
|
2011-00234 |
List of name and work mailing addresses for Civilian Employees Roseberry, Robert
Date Received: 11/9/2010 Date Due: 12/9/2010 Date Completed: 12/3/2010
Comments: Responsive docs sent. CLOSED.
|
|
2011-00240 |
Digital Angel Contract #34945 McCoy, Elsie
Date Received: 11/10/2010 Date Due: 12/27/2010 Date Completed: 12/14/2010
Comments: 12.9.10 Extension (Ex 4 review) Withdrawn
|
|
2011-00300 |
Augspurger Mtn Radio Stn Fiber Upgrade Johnson, Benjamin
Date Received: 11/29/2010 Date Due: 12/28/2010 Date Completed: 1/4/2011
|
|
2011-00304 |
Bald Mountain substation, EFSEC Drach, Thomas
Date Received: 11/29/2010 Date Due: 12/28/2010 Date Completed: 1/3/2011
Comments: Responsive docs sent in their entirety. CLOSED.
|
|
2011-00311 |
Dates of any surveys done on his property 2005-2006 Calabrese, Perry
Date Received: 4/18/2011 Date Due: 5/16/2011 Date Completed: 4/27/2011
Comments: NO DOCS. CLOSED.
|
|
2011-00357 |
Handwritten Mtg notes, Trans AE's vanDijk, Richard
Date Received: 12/14/2010 Date Due: 1/13/2011 Date Completed: 2/8/2011
Comments: Responsive docs sent with no Exemptions claimed
|
|
2011-00358 |
Handwritten Mtg notes, Trans AE, Craig Hardin vanDijk, Richard
Date Received: 12/14/2010 Date Due: 1/13/2011 Date Completed: 2/25/2011
Comments: No responsive docs. CLOSED
|
|
2011-00359 |
Handwritten Mtg notes, Trans AE PacifiCorp, Ken Johnston vanDijk, Richard
Date Received: 12/14/2010 Date Due: 1/13/2011 Date Completed: 4/4/2011
Comments: Ex 4 review. Ex 6. CLOSED
|
|
2011-00384 |
Damaged tower coordinates (gunfire in Tiger Mtn Summit) Calder, Carolynn
Date Received: 12/20/2010 Date Due: 1/20/2011 Date Completed: 12/29/2010
Comments: Responsive docs sent. CLOSED.
|
|
2011-00386 |
Davis-Bacon Wage Rate for Footing Setter for J. McNary-J. Day Martinez, Ruben
Date Received: 12/20/2010 Date Due: 1/20/2011 Date Completed: 12/21/2010
Comments: Responsive docs sent in their entirety. CLOSED.
|
|
2011-00401 |
Fencing Right-of-Way Salem area Bethers, Michael
Date Received: 12/22/2010 Date Due: 1/24/2011
Comments: Withdrawn
|
|
2011-00430 |
BPA/Church of God drawings, etc. Chapman, Myrtle
Date Received: 1/3/2011 Date Due: 2/15/2011 Date Completed: 2/10/2011
Comments: Responsive dcos sent with Ex 6. CLOSED
|
|
2011-00443 |
Interview, test results, his application Littrell, Brian
Date Received: 1/6/2011 Date Due: 2/22/2011 Date Completed: 2/8/2011
Comments: Responsive dcos sent with Ex 6. CLOSED
|
|
2011-00502 |
Additional drawing/land use agreements Chapman, Myrtle
Date Received: 1/20/2011 Date Due: 2/18/2011 Date Completed: 2/24/2011
Comments: Responsive dcos sent with Ex 6. CLOSED
|
|
2011-00503 |
More information, same land Chapman, Myrtle
Date Received: 1/20/2011 Date Due: 2/18/2011 Date Completed: 2/8/2011
Comments: Responsive dcos sent with Ex 6. CLOSED
|
|
2011-00504 |
ROW case No. 20070437 Chapman, Myrtle
Date Received: 1/20/2011 Date Due: 2/18/2011 Date Completed: 2/22/2011
Comments: Responsive dcos sent with Ex 6. CLOSED
|
|
2011-00505 |
Annual 500 kv transmission line systems/Montana Gilmore, Grace
Date Received: 1/20/2011 Date Due: 2/17/2011 Date Completed: 2/17/2011
Comments: Responsive docs sent in their entirety. CLOSED.
|
|
2011-00506 |
Copy of USA's Std clearing contracts Thomas, Penny
Date Received: 1/24/2011 Date Due: 2/22/2011 Date Completed: 2/28/2011
Comments: NO DOCS. CLOSED
|
|
2011-00507 |
List of Herbicides for veg mgmnt on land Thomas, Penny
Date Received: 1/24/2011 Date Due: 2/22/2011 Date Completed: 2/28/2011
Comments: Responsive docs sent in their entirety. CLOSED.
|
|
2011-00524 |
List of Existing/Past members of BEFR Seligman, Dan
Date Received: 1/26/2011 Date Due: 2/24/2011 Date Completed: 4/5/2011
Comments: CLOSED
|
|
2011-00525 |
Consult/Prof Contract/Paul Norman Seligman, Dan
Date Received: 1/26/2011 Date Due: 2/24/2011 Date Completed: 1/28/2011
Comments: NO DOCS. CLOSED
|
|
2011-00526 |
Consult/Prof Contract/Steve Hickok Seligman, Dan
Date Received: 1/26/2011 Date Due: 2/24/2011 Date Completed: 1/28/2011
Comments: NO DOCS. CLOSED
|
|
2011-00527 |
Consult/Prof Contract/Ruth Bennett Seligman, Dan
Date Received: 1/26/2011 Date Due: 2/24/2011 Date Completed: 1/28/2011
Comments: NO DOCS. CLOSED
|
|
2011-00528 |
Consult/Prof Contract/Randy Hardy/Hardy Energy Consult Seligman, Dan
Date Received: 1/26/2011 Date Due: 2/24/2011 Date Completed: 2/11/2011
Comments: NO DOCS. CLOSED
|
|
2011-00529 |
Consult/Prof Contract/James Curtis/Beech Street Consult Seligman, Dan
Date Received: 1/26/2011 Date Due: 2/24/2011 Date Completed: 2/11/2011
Comments: NO DOCS. CLOSED
|
|
2011-00530 |
Consult/Prof Contract/Walter Pollock Seligman, Dan
Date Received: 1/26/2011 Date Due: 2/24/2011 Date Completed: 4/5/2011
Comments: NO DOCS. CLOSED
|
|
2011-00531 |
Consult/Prof Contract/Jack Robertson Seligman, Dan
Date Received: 1/26/2011 Date Due: 2/24/2011 Date Completed: 1/28/2011
Comments: NO DOCS. CLOSED
|
|
2011-00581 |
Washington2Advocates contracts, communications, invoices & work product Seligman, Dan
Date Received: 2/4/2011 Date Due: 3/7/2011 Date Completed: 2/25/2011
Comments: Responsive docs sent in their entirety. CLOSED.
|
|
2011-00611 |
Consult/Prof Contract/Vickie VanZandt/VanZandt Electric Trans Consult Seligman, Dan
Date Received: 2/11/2011 Date Due: 3/14/2011 Date Completed: 3/18/2011
Comments: NO DOCS. CLOSED
|
|
2011-00612 |
Consult/Prof Contract/Peggy Olds Seligman, Dan
Date Received: 2/11/2011 Date Due: 3/14/2011 Date Completed: 3/18/2011
Comments: NO DOCS. CLOSED
|
|
2011-00619 |
Expert/Consulting Services contractors Seligman, Dan
Date Received: 2/14/2011 Date Due: 3/15/2011 Date Completed: 3/29/2011
Comments: Withdrawn
|
|
2011-00621 |
Contracts with Global Energy Partners since 1/1/2008 Seligman, Dan
Date Received: 2/14/2011 Date Due: 3/15/2011 Date Completed: 4/13/2011
Comments: Responsive docs sent with Ex 4 & Ex 6
|
|
2011-00622 |
Contracts with EnerNOC and/or Ecofys-US relating to demand response Seligman, Dan
Date Received: 2/14/2011 Date Due: 3/15/2011 Date Completed: 4/5/2011
Comments: Responsive docs sent in their entirety. CLOSED.
|
|
2011-00661 |
Pennwalt substation contract, agreements, easement, environment reports Stock, Matthew
Date Received: 2/17/2011 Date Due: 3/18/2011 Date Completed: 3/17/2011
Comments: Withdrawn
|
|
2011-00675 |
Contracts with Davis Wright Tremaine post 1-1-07; sole-source justification Seligman, Dan
Date Received: 2/22/2011 Date Due: 3/22/2011 Date Completed: 4/5/2011
Comments: CLOSED
|
|
2011-00676 |
summary Financial Assistance agreements, recipients, dates, amounts Seligman, Dan
Date Received: 2/22/2011 Date Due: 3/22/2011 Date Completed: 4/5/2011
Comments: CLOSED
|
|
2011-00677 |
Intellectual Property Strategy, agreements re:patent development, awards Seligman, Dan
Date Received: 2/22/2011 Date Due: 3/22/2011 Date Completed: 4/5/2011
Comments: CLOSED
|
|
2011-00697 |
Corona & Field Effects Software Klein, Richard
Date Received: 2/24/2011 Date Due: 3/24/2011 Date Completed: 3/2/2011
Comments: CLOSED
|
|
2011-00698 |
hourly import and export of electricity 1/1/2007-12/31/2010 McBee, Brannin
Date Received: 2/24/2011 Date Due: 3/24/2011 Date Completed: 3/22/2011
Comments: CLOSED
|
|
2011-00709 |
checks issues that are unredeemed, uncashed, unpresented Christian, George
Date Received: 2/28/2011 Date Due: 3/28/2011 Date Completed: 3/2/2011
Comments: NO DOCS. CLOSED. Ex 6
|
|
2011-00747 |
Audible Noise Policy Lightstone, Michael
Date Received: 3/3/2011 Date Due: 4/1/2011 Date Completed: 3/10/2011
Comments: CLOSED
|
|
2011-00748 |
Power sales and Purchase Agreement - Lakeview Light & Power Bubenik, Mark
Date Received: 3/4/2011 Date Due: 4/1/2011 Date Completed: 4/11/2011
Comments: Ex 4. CLOSED
|
|
2011-00753 |
Supplemental labor contracts 2010 & 2011 Seligman, Dan
Date Received: 3/7/2011 Date Due: 4/4/2011 Date Completed: 4/5/2011
Comments: CLOSED
|
|
2011-00766 |
Participants of REP settlement agreement - REP-12-E-BPA-01 Pace, Charles
Date Received: 3/8/2011 Date Due: 4/5/2011 Date Completed: 3/10/2011
Comments: CLOSED
|
|
2011-00768 |
Updates on I-5 Corridor Reinforcement Project segments Bell, Leslie
Date Received: 3/8/2011 Date Due: 4/5/2011 Date Completed: 4/13/2011
Comments: CLOSED
|
|
2011-00796 |
SES employees, salaries, awards, positions Klinger, Joshua
Date Received: 3/14/2011 Date Due: 4/11/2011 Date Completed: 4/6/2011
Comments: Transferred to DOE. CLOSED
|
|
2011-00834 |
total output date of wind generation, thermal generation and hydro generation 2007-2010 McBee, Brannin
Date Received: 3/22/2011 Date Due: 4/19/2011 Date Completed: 4/25/2011
Comments: Responsive docs sent in their entirety. CLOSED.
|
|
2011-00869 |
land use agreements Chapman, Myrtle
Date Received: 3/29/2011 Date Due: 4/26/2011 Date Completed: 5/5/2011
Comments: CLOSED
|
|
2011-00926 |
geo tech report on his property Calabrese, Perry
Date Received: 4/7/2011 Date Due: 5/5/2011 Date Completed: 4/20/2011
Comments: Responsive docs sent with Ex 6. CLOSED
|
|
2011-00930 |
records showing personnel on his property April 6, 2011 Klie, Robert
Date Received: 4/7/2011 Date Due: 5/5/2011 Date Completed: 4/27/2011
Comments: Withdrawn
|
|
2011-00937 |
cost related to IOU leases of BPA transmission lines Hofland, Kory
Date Received: 4/11/2011 Date Due: 5/9/2011 Date Completed: 4/26/2011
Comments: Withdrawn
|
|
2011-00940 |
funding re:implementation of Safety of Dams review findings Pugh, Douglas
Date Received: 4/6/2011 Date Due: 5/4/2011 Date Completed: 4/11/2011
Comments: NO DOCS. CLOSED
|
|
2011-00946 |
contact info on all Contracting Officers West, Amanda
Date Received: 4/11/2011 Date Due: 5/9/2011 Date Completed: 4/12/2011
Comments: CLOSED
|
|
2011-00973 |
ltr from BPA GC dated 10/31/1940 with enclosures Chapman, Myrtle
Date Received: 4/14/2011 Date Due: 5/12/2011 Date Completed: 4/25/2011
Comments: Responsive docs sent with Ex 6. CLOSED
|
|
2011-00987 |
dates of vegetation management on Castle-Rock Lexington transmission line in past 20 yrs Calabrese, Perry
Date Received: 4/18/2011 Date Due: 5/16/2011 Date Completed: 5/10/2011
Comments: Responsive docs sent in their entirety. CLOSED.
|
|
2011-00988 |
all documentation on submersion of Peterson Power Systems excavator at Aurora Oregon BPA jobsite Tromp, Robert
Date Received: 4/18/2011 Date Due: 5/16/2011 Date Completed: 5/27/2011
Comments: Withdrawn
|
|
2011-00999 |
policy on ROW restrictions on parking and roads Chapman, Myrtle
Date Received: 4/20/2011 Date Due: 5/18/2011 Date Completed: 4/25/2011
Comments: Online data updated, link sent. CLOSED
|
|
2011-01000 |
police on ROW construction of water treatment facilities Chapman, Myrtle
Date Received: 4/20/2011 Date Due: 5/18/2011 Date Completed: 5/19/2011
Comments: Responsive docs sent with Ex 6. CLOSED
|
|
2011-01001 |
communications regarding John Day dam operations Mar 1 to Apr 1, 2011 Hawley, Steven
Date Received: 4/20/2011 Date Due: 5/18/2011 Date Completed: 5/19/2011
Comments: Responsive docs sent with Ex 5. CLOSED
|
|
2011-01020 |
Contract with TEK Systems Bruce, Jeremy
Date Received: 4/20/2011 Date Due: 5/18/2011 Date Completed: 6/1/2011
Comments: Responsive docs sent in their entirety. CLOSED.
|
|
2011-01023 |
Contract with TEK Systems Shepherd, Andrew
Date Received: 4/25/2011 Date Due: 5/23/2011 Date Completed: 5/2/2011
Comments: Responsive docs sent in their entirety. Privacy Act
|
|
2011-01032 |
Contracts with Christenson Electric and Resource Mgmt Bartunek, Bud
Date Received: 4/27/2011 Date Due: 5/25/2011 Date Completed: 5/16/2011
Comments: NO DOCS. CLOSED
|
|
2011-01051 |
Corona & Field Effects software program Khalil, Hamby
Date Received: 4/29/2011 Date Due: 5/27/2011 Date Completed: 4/29/2011
Comments: CLOSED
|
|
2011-01054 |
cost related to IOU leases of BPA transmission lines Hofland, Kory
Date Received: 4/26/2011 Date Due: 5/18/2011 Date Completed: 5/18/2011
Comments: NO DOCS. CLOSED
|
|
2011-01083 |
contractors names, phone numbers, addresses hired for veg mgmt along Ross-Lexington line Calabrese, Perry
Date Received: 5/9/2011 Date Due: 6/7/2011 Date Completed: 5/10/2011
Comments: Responsive docs sent with Ex 6. CLOSED
|
|
2011-01094 |
unclaimed checks muni bonds over $10,000 Bialik, Loren
Date Received: 5/10/2011 Date Due: 6/8/2011 Date Completed: 5/10/2011
Comments: NO DOCS. CLOSED
|
|
2011-01102 |
30-60-90 Reports Seligman, Dan
Date Received: 5/12/2011 Date Due: 6/10/2011 Date Completed: 5/18/2011
|
|
2011-01103 |
DOE Weekly Reports Seligman, Dan
Date Received: 5/12/2011 Date Due: 6/10/2011 Date Completed: 5/31/2011
Comments: Responsive docs sent in their entirety. CLOSED.
|
|
2011-01104 |
non-SES employee awards, bonuses Seligman, Dan
Date Received: 5/12/2011 Date Due: 6/10/2011 Date Completed: 6/24/2011
Comments: Responsive docs sent in their entirety. CLOSED.
|
|
2011-01105 |
SES employee awards, bonuses Seligman, Dan
Date Received: 5/12/2011 Date Due: 6/10/2011 Date Completed: 5/13/2011
Comments: Transferred to DOE. CLOSED
|
|
2011-01243 |
service contracts with Christenson Electric & Resource Mgmt Bartunek, Bud
Date Received: 5/26/2011 Date Due: 6/24/2011 Date Completed: 6/28/2011
Comments: Responsive docs sent in their entirety. CLOSED.
|
|
2011-01257 |
copy of recusal in BEFmatters - Tim Johnson Seligman, Dan
Date Received: 6/1/2011 Date Due: 6/29/2011 Date Completed: 6/24/2011
Comments: NO DOCS. CLOSED
|
|
2011-01258 |
copy of recusal in BEFmatters - Rand Roach Seligman, Dan
Date Received: 6/1/2011 Date Due: 6/29/2011 Date Completed: 6/24/2011
Comments: NO DOCS. CLOSED
|
|
2011-01259 |
copy of recusal in BEFmatters - all other BPA staff Seligman, Dan
Date Received: 6/1/2011 Date Due: 6/29/2011 Date Completed: 6/24/2011
Comments: NO DOCS. CLOSED
|
|
2011-01316 |
price pages, pricing notes of all bidders on RFP:1928 Feist, Eric
Date Received: 6/10/2011 Date Due: 7/11/2011 Date Completed: 8/8/2011
Comments: NO DOCS. CLOSED
|
|
2011-01336 |
RFO #0001887 documentation Rosencrantz, Mark
Date Received: 6/15/2011 Date Due: 7/14/2011 Date Completed: 10/28/2011
Comments: Responsive docs sent with Ex. 3 and 4. CLOSED
|
|
2011-01417 |
documents determining Steve Hickok did not need a waiver for being ex-officio board member to BEF Seligman, Dan
Date Received: 7/7/2011 Date Due: 8/4/2011 Date Completed: 7/28/2011
Comments: Responsive docs sent in their entirety. CLOSED.
|
|
2011-01470 |
All security incidents Iboshi, Kyle
Date Received: 7/18/2011 Date Due: 8/15/2011 Date Completed: 7/27/2011
|
|
2011-01513 |
Projects worked on by SR Rolf Greenstein, David
Date Received: 7/25/2011 Date Due: 8/22/2011 Date Completed: 7/25/2011
Comments: Responsive docs sent with Ex 6. CLOSED
|
|
2011-01515 |
All records re: Mud Lake and Circle C Rock Products Bucsit, Nikki
Date Received: 7/25/2011 Date Due: 8/22/2011 Date Completed: 9/8/2011
Comments: Responsive docs sent with Ex. 4 and 5. CLOSED
|
|
2011-01520 |
BEF agreement Seligman, Dan
Date Received: 7/26/2011 Date Due: 8/23/2011 Date Completed: 8/8/2011
Comments: NO DOCS. CLOSED
|
|
2011-01521 |
BEF annual report Seligman, Dan
Date Received: 7/26/2011 Date Due: 8/23/2011
Comments: Withdrawn
|
|
2011-01579 |
BPA utility customers, contact info, EE budget Coykendall, Jess
Date Received: 7/29/2011 Date Due: 8/26/2011 Date Completed: 8/22/2011
Comments: Responsive docs sent in their entirety. CLOSED.
|
|
2011-01595 |
Dutes of SR Rolf, individuals worked with, recommendation Greenstein, David
Date Received: 8/1/2011 Date Due: 8/29/2011 Date Completed: 8/2/2011
Comments: Responsive docs sent with Ex 6. CLOSED
|
|
2011-01628 |
Correspondence, etc. from or involving Scott Stanzel Houser, Erik
Date Received: 8/5/2011 Date Due: 9/2/2011 Date Completed: 8/8/2011
Comments: NO DOCS. CLOSED
|
|
2011-01630 |
I-5 Corridor Reinforcement Project documents van Dijk, Richard
Date Received: 8/8/2011 Date Due: 9/7/2011 Date Completed: 11/6/2011
Comments: Partial resp sent 10/8 & 10/14. Ex 5 & 6. Final Ex 4.
|
|
2011-01631 |
I-5 Corridor Reinforcement Project documents van Dijk, Richard
Date Received: 8/8/2011 Date Due: 9/7/2011 Date Completed: 10/7/2011
Comments: Responsive docs sent with Ex 6. CLOSED
|
|
2011-01632 |
I-5 Corridor Reinforcement Project documents van Dijk, Richard
Date Received: 8/8/2011 Date Due: 9/7/2011 Date Completed: 8/30/2011
Comments: Responsive docs sent with Ex 6. CLOSED
|
|
2011-01633 |
I-5 Corridor Reinforcement Project documents van Dijk, Richard
Date Received: 8/8/2011 Date Due: 9/7/2011 Date Completed: 8/25/2011
Comments: Responsive docs sent with non-responsive redacted and Ex 6. CLOSED
|
|
2011-01634 |
I-5 Corridor Reinforcement Project documents van Dijk, Richard
Date Received: 8/8/2011 Date Due: 9/7/2011 Date Completed: 8/30/2011
Comments: Responsive docs sent with Ex 6. CLOSED
|
|
2011-01635 |
I-5 Corridor Reinforcement Project documents van Dijk, Richard
Date Received: 8/8/2011 Date Due: 9/7/2011 Date Completed: 8/31/2011
Comments: Responsive docs sent with Ex 6. CLOSED
|
|
2011-01636 |
I-5 Corridor Reinforcement Project documents van Dijk, Richard
Date Received: 8/8/2011 Date Due: 9/7/2011 Date Completed: 8/23/2011
Comments: Responsive docs sent with Ex 6. CLOSED
|
|
2011-01700 |
Records from the Augsperger Radio Station Fiber Upgrade project Bradach, John
Date Received: 8/15/2011 Date Due: 9/13/2011 Date Completed: 9/26/2011
Comments: NO DOCS. CLOSED
|
|
2011-01701 |
I-5 Corridor Reinforcement Project documents Constance, Terry
Date Received: 8/15/2011 Date Due: 9/13/2011 Date Completed: 9/7/2011
Comments: Responsive docs sent with Ex 6. CLOSED
|
|
2011-01724 |
Email mentioned in Interim Redispatch ROD Pace, Charles
Date Received: 8/18/2011 Date Due: 9/16/2011 Date Completed: 8/23/2011
Comments: Responsive docs sent. CLOSED
|
|
2011-01732 |
I-5 Corridor Reinforcement Project documents van Dijk, Richard
Date Received: 8/22/2011 Date Due: 9/20/2011 Date Completed: 10/6/2011
Comments: Responsive docs sent with Ex 6. CLOSED
|
|
2011-01733 |
I-5 Corridor Reinforcement Project documents van Dijk, Richard
Date Received: 8/22/2011 Date Due: 9/20/2011 Date Completed: 9/14/2011
Comments: Responsive docs sent with Ex 6. CLOSED
|
|
2011-01780 |
I-5 Corridor Reinforcement Project documents van Dijk, Richard
Date Received: 8/27/2011 Date Due: 9/29/2011 Date Completed: 9/28/2011
Comments: Responsive docs sent with Ex 6. CLOSED
|
|
2011-01782 |
I-5 Corridor Reinforcement Project documents van Dijk, Richard
Date Received: 8/27/2011 Date Due: 9/29/2011 Date Completed: 9/23/2011
Comments: Responsive docs sent with Ex 6. CLOSED
|
|
2011-01795 |
IT Org Chart and contact information of staff Brown, Kirk
Date Received: 9/2/2011 Date Due: 10/3/2011 Date Completed: 9/12/2011
Comments: Responsive docs sent in their entirety. CLOSED
|
|
2011-01822 |
Media Contacts that we sent releases to (ref from HQ) Clements, Tom
Date Received: 10/24/2011 Date Due: 11/15/2011 Date Completed: 11/4/2011
|
|
2011-01832 |
Telecommunications wireless leases Hebenton, Clay
Date Received: 9/9/2011 Date Due: 10/7/2011 Date Completed: 9/29/2011
Comments: Withdrawn
|
|
2011-01833 |
Contract amount paid for IT contractor Privacy Act
Date Received: 9/9/2011 Date Due: 10/7/2011 Date Completed: 9/13/2011
Comments: Responsive docs sent with Ex 6. CLOSED
|
|
2011-01861 |
Douglas Albright, Actuation Test Equipment Co Albright, Douglas
Date Received: 9/14/2011 Date Due: 10/13/2011 Date Completed: 10/6/2011
Comments: Responsive docs sent in their entirety. CLOSED
|
|
2011-02027 |
I-5 Corridor Reinforcement Project documents van Dijk, Richard
Date Received: 9/28/2011 Date Due: 10/27/2011 Date Completed: 11/23/2011
Comments: Responsive docs sent in their entirety. CLOSED
|
|
2011-02052 |
ADF related to NOS 09 & 10, ADF related to line builds & upgrades in NOS 09 & 10 van Dijk, Richard
Date Received: 9/30/2011 Date Due: 10/31/2011 Date Completed: 10/19/2011
Comments: Responsive docs sent with Ex 5 & Ex 6. CLOSED
|
|
2011-02053 |
Notification letter of vegetation mgmt crews working on ROW of Ross-Lex line in 05 or 06 Calabrese, Perry
Date Received: 9/30/2011 Date Due: 10/31/2011 Date Completed: 10/18/2011
Comments: Responsive docs sent with Ex 6. CLOSED
|
|