Develop Final (95%) design

Proceed with finalizing the design so that it is substantially complete:

  1. Incorporate comments from 70% review
  2. Develop responses to 70% review comments
  3. Finalize approach road design
  4. Finalize pullouts and parking area design
  5. Complete Final Road Safety Evaluation
  6. Complete major structure design support
  7. Finalize drainage design
  8. Finalize permanent traffic control
  9. Finalize temporary traffic control
  10. Finalize plan and profile sheets
  11. Finalize project specific plan/detail sheets

Step 1: Incorporate comments from 70% review

Instructions Resources References
PS&E Review Comment Spreadsheet Green Book
PDDM, WFLHD Supplements, Chapter 9
Discuss issues with commenters or in a comment review CFT meeting

Step 2: Develop responses to 70% review comments

Instructions Resources References
PS&E Review Comment Spreadsheet

Step 3: Finalize approach road design

Instructions Resources References
Finalize plan and profile sheets
Proposed Pavement Widening, Adhoc Help WFLHD Supplement 9.6.5-1, Standard Format for Plans
Finalize major intersection plans
GEOPAK, Approach Road Match line WFLHD Supplement 9.6.5-1, Standard Format for Plans
Finalize cross sections for earthwork, clearing and seeding reports
Cross Section Sheets, GEOPAK V8i
GEOPAK, Plot Cross Section Sheets
GEOPAK, Calculating Earthwork
GEOPAK, Earthwork Manipulation Tool
GEOPAK, Clearing Notes
GEOPAK, Generate Clearing Limits
GEOPAK, Slope Stake Notes, FHWA Version 2
GEOPAK, XYZ Report AKA, Blue Tops and Rep Tops
GEOPAK, Printing reports
GEOPAK, Seeding Notes

Step 4: Finalize pullouts and parking area design

Instructions Resources References
Review/Finalize layouts
Proposed Pavement Widening, Adhoc Help WFLHD Supplement 9.6.5-1, Standard Format for Plans
Finalize plan and profile sheets
WFLHD Supplement 9.6.5-1, Standard Format for Plans
QA/QC Checklist
Finalize control point layout sheets
Survey section to provide control data

Step 5: Complete Final Road Safety Evaluation

Instructions Resources References
QA/QC Checklist IHSDM
PS&E Review Comment Spreadsheet

Step 6: Complete major structure design support

Instructions Resources References
Provide support for final bridge plans.
Finalize all wall layout sheets
Proposed Cut Wall, Adhoc Help Structures to provide data for final wall profiles
Proposed Fill Wall, Adhoc Help
GEOPAK, Wall link
Proposed Mechanically Stablized Earth, Adhoc Help
Proposed Shored Mechanically Stabilized Earth, Adhoc Help
WFL Proposed Parapet Wall, Adhoc Help
Proposed Gabion Faced Mechanically Stablized Earth, Adhoc Help
Proposed Going To The Sun Road, Adhoc Help
Proposed Soil Nail Wall, Adhoc Help
Proposed Rockery Wall, Adhoc Help
QA/QC Checklist
PS&E Review Comment Spreadsheet

Step 7: Finalize drainage design

Instructions Resources References
Finalize all the major culverts and end treatments.
QA/QC Checklist Hydraulics to provide final approval of plan sheets
PS&E Review Comment Spreadsheet
Drainage Summary
Finalize all the minor culverts and end treatments
QA/QC Checklist
PS&E Review Comment Spreadsheet
Drainage Summary
Hydraulics Toolbox (software)

Step 8: Finalize permanent traffic control

Instructions Resources References
Finalize signing plans
QA/QC Checklist WFLHD Supplement 9.6.5-1, Standard Format for Plans
PS&E Review Comment Spreadsheet
MUTCD
GuidSIGN
Finalize striping plans
QA/QC Checklist WFLHD Supplement 9.6.5-1, Standard Format for Plans
MUTCD
GuidSIGN (software)
PS&E Review Comment Spreadsheet

Step 9: Finalize temporary traffic control

Instructions Resources References
Finalize construction phasing plans and/or detour plans
QA/QC Checklist WFLHD Supplement 9.6.5-1, Standard Format for Plans Standard Drawings, FLH
Standard Drawings, State DOT
PS&E Review Comment Spreadsheet MUTCD
Finalize temporary signing, striping, and traffic control plans
QA/QC Checklist WFLHD Supplement 9.6.5-1, Standard Format for Plans Standard Drawings, FLH
PS&E Review Comment Spreadsheet MUTCD

Step 10: Finalize plan and profile sheets

Instructions Resources References
QA/QC Checklist WFLHD Supplement 9.6.5-1, Standard Format for Plans
PS&E Review Comment Spreadsheet

Step 11: Finalize project specific plan/detail sheets

Instructions Resources References
QA/QC Checklist WFLHD Supplement 9.6.5-1, Standard Format for Plans
PS&E Review Comment Spreadsheet