Environmental Assessments


Name Status
Lake Nighthorse Recreation Plan Final EA & FONSI | Comments 12/2016 Final EA & Comments
Marion Lower Ditch Piping Project Final Environmental Assessment 12/2016 Final EA
Steinaker Dam Right Abutment Slide Repair Draft Environmental Assessment 12/2016 Draft EA
Gobblefield Ditch Piping Project Final Environmental Assessment 12/2016 Final EA
Expansion Plan at Navajo Dam Marina to Include New Store, Restaurant and Fuel Dock | FONSI 11/2016 Final EA & FONSI
Paonia Dam Intake Structure Repair Final Environmental Assessment & FONSI 10/2016 Final EA
Sheep Creek Irrigation Company Antelope and North Laterals Salinity Control Project 10/2016 Draft EA
St. John Canal Enclosure Project Final Environmental Assessment | FONSI 10/2016 Final EA & FONSI
Moon Lake Yellowstone Feeder Canal Repair Final Environmental Assessment 11/2016 Final EA-FONSI
La Plata West Water Authority Raw Water Project Final Environmental Assessment | FONSI 08/2016 Final EA & FONSI
Hyrum Dam Spillway Replacement Project Final Environmental Assessment | FONSI | Concurrence 08/2016 Final EA & FONSI
Jordan Aqueduct Easement and Pipeline Relocation and Encroachments Final Environmental Assessment 07/2016 Final EA
Woodruff Pressurized Irrigation Project Draft Environmental Assessment 07/2016 Draft EA
Montrose Equipment Storage Structure, Aspinall Unit Final EA 06/2016 Final EA
Daniel Irrigation Canal Modification Project Final Environmental Assessment | FONSI 05/2016 Final EA & FONSI
Zanni Lateral of the Crawford Clipper Ditch Pipeline Project Final EA | FONSI 03/2016 Final EA & FONSI
Willard Canal Lining Project Final Environmental Assessment 03/2016 Final EA
Installation of Non-Native Predatory Fish Escapement Net in Elkhead Reservoir Final EA | FONSI 02/2016 Final EA & FONSI
Provo Reservoir Water Users Company Carriage Contract, Deer Creek Reservoir Final Environmental Assessment 02/2016 Final EA
Wellsville-Mendon Canal Piping Project Final Environmental Assessment 02/2016 Final EA
San Acacia Habitat Restoration Project Draft Environmental Assessment 02/2016 Draft EA
South Canal Drop 5 Hydropower Project EA | FONSI 11/2015 Final EA & FONSI
Davis & Weber Counties Canal Company Water Conservation Project | Appendices 10/2015 EA & FONSI
Cattleman's Ditches Pipeline Project Final EA | FONSI 09/2015 Final EA & FONSI
Austin Canal Replacement Salinity Control Project 09/2015 Final EA & FONSI
Upper High Creek Canal Enclosure and Hydropower Development Final EA and FONSI 08/2015 Final EA & FONSI
Red Fleet Reservoir Rotenone Treatment Final EA and FONSI 08/2015 Final EA & FONSI
Logan & Northern Irrigation Company Piping & Pressurization Project 07/2015 Draft EA
Upper High Creek Canal Enclosure and Hydropower Development 06/2015 Draft EA
Storage of Non-Project Water in Rockport Reservoir 05/2015 Final EA & FONSI
Arthur V. Watkins Dam Crest Raise, Willard Reservoir 02/2015 Final EA & FONSI
Newton Service Canal Modification Project Final Environmental Assessment 02/2015 FONSI
Karr Farms Transfer, Brantely Project, New Mexico Environmental Assessment and Draft FONSI 12/2014 Draft FONSI
Jensen Unit Block Notice Final EA 10/2014 FONSI
Bostwick Park Water Conservation District's Siphon Lateral & Forked Tongue/Holman Ditch Company's Salinity Control Projects Montrose & Delta Counties, CO Final EA 09/2014 FONSI
Steinaker Service Canal Modification Project Final EA 09/2014 FONSI
Minnesota Canal & Reservoir Company Salinity Control Project Phase II 2014-2016 Final EA 08/2014 FONSI
South Canal Drop 4 Hydropower Project Final Environmental Assessment 08/2014 FONSI
License Agreement Between Reclamation and Delta County for the Construction of a Parking Area for the Purpose of Wildlife Viewing on Reclamation Property, Fruitgrowers Project Final EA 06/2014 FONSI
Shavano Falls Hydropower Project Final Environmental Assessment 06/2014 FONSI
Clipper Irrigation Salinity Control Project 4, Smith Fork Project Final Environmental Assessment 04/2014 FONSI
South Utah Valley Electric Conveyance Project Final Environmental Assessment 03/2014 FONSI
Roger's Mesa Water Distribution Association Slack and Patterson Laterals Salinity Control Project, Delta County, CO Draft EA 02/2014 Draft EA
Sheep Creek Irrigation Company Cedar Hollow Lateral Salinity Control Project Final EA 11/2013 FONSI
C Ditch/Needle Rock Pipeline Project Final Environmental Assessment | FONSI 10/2013 FONSI
Blue Cut Water Service Final Environmental Assessment 08/2013 FONSI
Red Fleet Reservoir Resource Management Plan Final Environmental Assessment 08/2013 FONSI
Steinaker Reservoir Resource Management Plan Final Environmental Assessment 08/2013 FONSI
Dallas Creek Eastside Trails Project Final Environmental Assessment 08/2013 FONSI
Orchard Mesa Irrigation District Canal System Improvement Project Final Environmental Assessment 08/2013 FONSI
Implementation of Rio Grande Project Operating Procedures, New Mexico and Texas Final Supplemental EA 06/2013 FONSI
Seedskadee Revocation Project, Wyoming Final Environmental Assessment 05/2013 FONSI
Tri-County Water Hydropower Project Interconnection Facilities Final Supplemental EA 03/2013 FONSI
Pecos River Restoration at the Overflow Wetlands, Area of Critical Environmental Concern Draft EA 12/2012 Draft EA
Huntsville Irrigation Canal Piping Water Conservation Project, Weber County, Utah Environmental Assessment 11/2012 EA
Minnesota Canal and Reservoir Company Piping Project Final EA 10/2012 FONSI
Development and Implementation of a Protocol for High-Flow Experimental Releases from Glen Canyon Dam, Arizona, 2011 through 2020 Environmental Assessment 05/2012 FONSI
Non-Native Fish Control Downstream from Glen Canyon Dam Environmental Assessment 05/2012 FONSI
Integrated Pest Management on San Juan-Chama Project; Colorado and New Mexico Final Environmental Assessment 04/2012 FONSI
Albuquerque Bernalillo County Water Utility Authority Southwestern Willow Flycatcher Habitat Restoration Project Environmental Assessment 02/2012 FONSI
Hancock-State Road Salinity Reduction Project Uintah and Duchesne Counties, Utah Environmental Assessment 02/2012 FONSI
South Canal Hydropower Project Final Environmental Assessment 02/2012 FONSI
Farson/Eden Salinity Control Project Eden Canal, E-5 & E-6 Laterals Sweetwater County, Wyoming Environmental Assessment 12/2011 FONSI
Ouray Park Canal Salinity Control Project Environmental Assessment 12/2011 FONSI
Ridgway Dam Hydropower Project 12/2011 Final EA
San Juan-Chama Project Repayment Contracts, Taos Pueblo Indian Water Rights Settlement Act Final Environmental Assessment 11/2011 FONSI
Jordanelle Reservoir Resource Management Plan and Environmental Assessment 09/2011 FONSI
Rifle Creek Fish Screen Project Final Environmental Assessment 07/2011 Final EA
Reclamation's Funding for Bluewater Acres Water System Improvements Project FONSI 04/2011 FONSI
Parallel Pipeline Project Final Environmental Assessment 03/2011 FONSI
Brantley and Avalon Reservoirs Resource Mgmt Plan Amendment Final Environmental Assessment 02/2011 Final EA
Eastern New Mexico Rural Water System Environmental Assessment 01/2011 Final EA
Ciénega Wetland Rehabiliation at Phantom Lake Spring, Toyavale, TX Final Environmental Assessment 01/2011 Final EA
2011 - 2016 Supplement to the Rio Grande Supplemental Water Programmatic Draft Environmental Assessment 10/2010 FONSI
Farson/Eden Salinity Control Project E-7, E-8, and Westside Laterals Sweetwater County, Wyoming Environmental Assessment 07/2010 FONSI
Fontenelle Community Renovation, Seedskadee Project Lincoln County, Wyoming Final Environmental Assessment 07/2010 FONSI
Green River Pumping Plant Project Final Environmental Assessment 06/2010 FONSI
Cañon Drought Emergency Water Well Final Environmental Assessment 03/2010 FONSI
Water District No. 11 Bear River for Innovative Water Conservation Measures and American Recovery and Reinvestment Act of 2009 Environmental Assessment 03/2010 FONSI
Albuquerque Bernalillo County Water Utility Authority Contract for Storage of San Juan-Chama Water in Elephant Butte Reservoir Final Environmental Assessment 01/2010 FONSI
Huntington/Cleveland Salinity Control Project, Phase IV North Ditch Canal Enclosure 01/2010 FONSI
Carriage of Non-Project Water in the Provo Reservoir Canal Environmental Assessment 12/2009 FONSI
Lone Pine Canal Salinity Control Project Final Environmental Assessment 12/2009 FONSI
Peoples Canal Salinity Control Project Environmental Assessment 12/2009 FONSI
Farson/Eden Salinity Control Project Lateral E-13, Sweetwater County, WY Environmental Assessment 12/2009 FONSI
Regina Drought Emergency Water Well Final Environmental Assessment and Finding of No Significant Impact 12/2009 FONSI
Exchange of Real Property between the United States Government and Provo City, UT Final Environmental Assessment 11/2009 FONSI
Echo Dam, Weber River Project Summit County, Utah, Proposed Safety of Dams Modification, EA & FONSI 09/2009 FONSI
Pueblo of Sandia Rio Grande Bosque Rehabilitation Project Final EA & FONSI 09/2009 FONSI
East Canyon Reservoir Water Intake Structure Final EA and FONSI 09/2009 FONSI
Pecos River Supplemental Water Project Environmental Assessment and Finding of No Significant Impact 08/2009 FONSI
Central Utah Project Completion Act Section 207 and Contributed Funds Act Funding for Provo Reservoir Canal Enclosure and Increased Capacity Final Environmental Assessment 07/2009 FONSI
Provo Reservoir Canal, Salt Lake Aqueduct Title Transfer Final Environmental Assessment 07/2009 FONSI
Newton Reservoir Mineral Extraction Final Environmental Assessment 05/2009 FONSI
Water Service Contract between the United States and the Navajo Nation/Navajo Tribal Utility Authority Final EA and FONSI 05/2009 FONSI
El Paso County Water Improvement District Number One, Canal, Structure, and Improvement Project Final EA and FONSI 05/2009 FONSI
Phreatophyte Management at Caballo and Elephant Butte Reservoirs September 2008-2013 FONSI 02/2009 FONSI
Pecos River Channel Restoration at the Bitter Lake National Wildlife Refuge, Chaves County, New Mexico Final EA & FONSI 01/2009 FONSI
Drain Unit 7 Extension River Maintenance Priority Site Final Environmental Assessment and Finding of No Significant Impact 01/2009 FONSI
Brazos Drought Emergency Water Well Rio Arriba County, New Mexico Final Environmental Assessment and Finding of No Significant Impact 12/2008 FONSI
Middle Rio Grande Isleta Reach Riverine Restoration Project Draft Environmental Assessment 11/2008 Draft EA
Escondida Drain Rehabilitation Environmental Assessment 10/2008 EA
Land Use Plan Westwater-Blanding Water Supply and Waste Disposal Facilities Water and Sewer Extension San Juan County, Utah Final EA and FONSI 09/2008 FONSI
Sediment Plug Removal at Bosque del Apache National Wildlife Refuge Middle Rio Grande Project, New Mexico Environmental Assessment and FONSI 09/2008 FONSI
La Plata West Water Authority Intake Structure and Water Treatment Plant at Lake Nighthorse Final EA and FONSI 09/2008 FONSI
Red Bridge Water Reuse Project Environmental Assessment and Finding of No Significant Impact 07/2008 FONSI
Drought Emergency Water Well for Eunice, New Mexico Final EA and FONSI 07/2008 FONSI
Drought Emergency Water Well for Hagerman, New Mexico Final Environmental Assessment and Finding of No Significant Impact 07/2008 FONSI
Navajo Reservoir Area Resource Management Plan Final EA and FONSI 06/2008 FONSI
Carriage of Non-Project Water in Emery County Project Facilities Environmental Assessment 06/2008 EA
Drought Emergency Water Well for Carlsbad, New Mexico Final Environmental Assessment and Finding of No Significant Impact 05/2008 FONSI
Santo Domingo Tribe - Endangered Species Habitat Improvement Project Phase III Environmental Assessment and Finding of No Significant Impact 03/2008 FONSI
Experimental Releases from Glen Canyon Dam, Arizona 2008 through 2012 Final EA and FONSI 2008-2012 FONSI
River Mile 111 Priority Site Project Draft Environmental Assessment and Finding of No Sigificant Impact 02/2008 Draft EA & FONSI
Energen Resources Natural Gas and Produced Water Pipelines Between the Dungan 32-5 #5-2 and #5-3 Wells and the Dungan 32-5 #5-1 Gas Well 12/2007 FONSI
A.V. Watkins Dam Safety of Dams Modification Final EA and FONSI 12/2007 FONSI
Steinaker Reservoir Normal Water Surface Elevation Increase Final EA and FONSI 09/2007 FONSI
Pueblo of San Felipe Bosque Restoration Project Environmental Assessment and Finding of No Significant Impact 09/2007 FONSI
Cochiti Priority Sites Rivermile 231.3 and 228.9 Environmental Assessment 08/2007 FONSI
Perennial Rio Grande Silvery Minnow Refugia at Drain Outfalls Environmental Assessment 07/2007 FONSI
Integrated Pest Management in the Pecos River Basin (Sumner, Brantley and Avalon Dams) Carlsbad Project EA and FONSI 01/2007 FONSI
Long-term Lease of Groundwater Rights, Pecos River near Ft. Sumner Final Environmental Assessment 07/2007 FONSI
Federal Rio Grande Project New Mexico-Texas Operating Procedures, Dona Ana, Sierra, and Socorro Counties, New Mexico and El Paso County Texas EA and FONSI 06/2007 FONSI
Santo Domingo Tribe - Endangered Species Habitat Improvement Project Phase II Final EA and FONSI 04/2007 FONSI
Seven Rivers Pipeline Environmental Assessment, Pecos River, New Mexico and Finding of No Significant Impact 04/2007 FONSI
Rockport Reservoir Final Environmental Assessment 02/2007 Modified FONSI
City of Albuquerque Habitat Restoration Project Final Environmental Assessment 02/2007 FONSI
Integrated Pest Management in the Pecos River Basin Finding of No Significant Impact 02/2007 FONSI
Contract between the United States and the Pine River Irrigation District for the Use of Project Water for Miscellaneous and Other Uses Final Environmental Assessment 02/2007 FONSI
Huntington North Dam Outlet Works Modification and Carriage of Non-Project Water through Emery County Project Facilities Final EA and FONSI 01/2007 FONSI
Public Environmental Assessment Middle Rio Grande Riverine Restoration Project Phase II and Finding of No Significant Impact 01/2007 FONSI
Perennial Rio Grande Silvery Minnow Refugia at Drain Outfalls Environmental Assessment 01/2007 FONSI
Middle Rio Grande Riverine Restoration Project Phase II Public EA and Finding of No Significant Impact 01/2007 FONSI
Tropic Ditch Replacement Project Final EA and FONSI 10/2006 FONSI
Middle Rio Grande Project Sandia Priority Site Final Environmental Assessment and Finding of No Significant Impact 07/2006 FONSI
Middle Rio Grande Project Bernalillo Priority Site Final Environmental Assessment and Finding of No Significant Impact 07/2006 FONSI
San Juan-Chama Water Contract Amendments with City of Santa Fe, County of Santa Fe, County of Los Alamos, Town of Taos, Village of Taos Ski Valley, Village of Los Lunas, and City of Española Environmental Assessment 05/2006 FONSI
Supplement to the Rio Grande Supplemental Water Programmatic Environmental Assessment 2006 - 2011 and Finding of No Sigificant Impact 05/2006 FONSI
Santo Domingo Tribe - Habitat Restoration for the Endangered Rio Grande Silvery Minnow and Salt Cedar Removal Project Environmental Assessment 03/2006 EA
Proposed Safety of Dams Modifications and Bridge Reconstruction Scofield Dam, Scofield Project, Carbon County, Utah Final EA and FONSI 12/2005 FONSI
Rio Grande Silvery Minnow Sanctuary Final Environmental Assessment 11/2005 FONSI
Jicarilla Apache Nation Water Subcontract to the city of Santa Fe Final Environmental Assessment and Finding of No Significant Impact 10/2005 FONSI
Drought Relief Well at Taos Pueblo Environmental Assessment and Finding of No Significant Impact 08/2005 FONSI
Price-Stubb Fish Passage Final Environmental Assessment and Finding of No Significant Impact 05/2005 FONSI
San Acacia Priority Sites, River Miles 114 and 113 Final Environmental Assessment 04/2005 Final EA
Proposed Experimental Actions for Water years 2005-2006 Colorado River, Arizona in Glen Canyon National Recreation Area and Grand Canyon National Park 11/2004 Draft Supplemental EA
Title Transfer of Provo Reservoir Canal, Salt Lake Aqueduct, and Pleasant Grove Property Provo River Project Final EA and FONSI 10/2004 FONSI
Pecos Saltcedar Control and Demonstration Project Environmental Assessment 09/2004 Final EA
Victory Ranch River Restoration Project Wasatch and Summit Counties, Utah Environmental Assessment 04/2004 FONSI
Providing Fish Screening In Redlands Power Canal Final Environmental Assessment 04/2004 FONSI
Floodplain Habitat Restoration At Thunder Ranch, Utah Final Environmental Assessment 04/2004 Final EA
Adoption of an Interim 602(a) Storage Guideline Final Environmental Assessment 03/2004 Final EA
Habitat Restoration at the Lucy Ferril Ela Wildlife Sanctuary (Grand Valley Audubon Society) 11/2003 FONSI
Reduction of Winter Releases from Navajo Reservoir to the San Juan River 10/2003 FONSI
Floodplain Habitat Restoration At The Walter Walker And Butch Craig Bottomland Sites Final Environmental Assessment 03/2003 FONSI
Endangered Fish Passage Project at the Grand Valley Project Diversion Dam And Fish Screen In the Government Highline Canal Final EA 03/2003 FONSI
Proposed Experimental Releases from Glen Canyon Dam and Removal of Non-Native Fish Environmental Assessment 09/2002 EA
Morrow Point Trash Rack Cleaning Project 07/2002 EA
Animas La Plata Project, Ridges Basin Dam and Reservoir Preconstruction Facilities Environmental Assessment 06/2002 EA
Providing Endangered Fish Passage at the Price-Stubb Diversion Dam on the Colorado River 04/2002 Supplemental Draft EA
Mancos Project Carriage Contracts Contracts Between the United States and Three Private Individuals for the Carriage of Non-Project Water Through Mancos Project Facilities Final EA 04/2002 FONSI
Jicarilla Apache Nation Water Subcontract Final EA 09/2001 Final EA
Morrow Point Cimarron Dredging Project 07/2002 Final EA
PNM Endangered Fish Passage at the Public Service Company of New Mexico (PNM) Diversion Dam on the San Juan River 10/2001 Final EA
Orchard Mesa Wildlife Area Selenium Remediation Project 10/2000 Final EA
Collbran Rock and Soil Sources Draft Environmental Assessment 10/2000 Draft EA
Final Environmental Assessment (EA) on an Agreement Concerning the Administration of Water Pursuant to the Subordination of Wayne N. Aspinall Unit Water Rights within the Upper Gunnison River Basin 02/2000 Final EA

Contact
Nancy Coulam
Environmental Compliance Officer
ncoulam@usbr.gov
(801) 524-3684

Last Updated: 12/19/16