TO ALL INTERESTED PARTIES:
13 Critical Erosion Sites
Sacramento River at river miles (RM) 16.8L, 42.7R, 49.7R, 52.3L, 53.5R, 55.2L, 77.2L, and 177.8R.
Lower American River at RM 0.3L and 2.8L.
Feather River at RM 28.5R.
Steamboat Slough at RM 16.6R
Cache Slough at RM 21.8R
Public Meeting 29 May 2008 View PDF 1.8mb
Availabiltiy of Final EA/IS Letter to Public WO Enclosure (PDF format 70KB)-- The public review period for the draft EA ended on June 9, 2008. All comments received on the draft EA/IS were incorporated into the final document, as appropriate. Construction is anticipated to begin in July 2008 and be completed by the end of November 2008.
* Finding Of No Significant Impact (PDF format 82KB)
* Final Environmental Assessment/Initial Study (PDF format 2MB)
* Final Environmental Assessment/Initial Study Appendices:
--Appendix Cover
--Appendix A(2) Xsections
--Appendix C Figures:
----
Fig C-1
----
Fig C-2
----
Fig C-3
----
Fig C-4
----
Fig C-5
----
Fig C-6
----
Fig C-7
-------Fig C-7a
----
Fig C-8
----
Fig C-9
-------Fig C-9a
----
Fig C-10
----
Fig C-11
----
Fig C-12
----
Fig C-13
--Appendix B Photographs
--Appendix D Tree Survey
--Appendix E Plants
--Appendix F Wildlife
--Appendix G Special Status Species
--Appendix H Elderberry
--Appendix I SAM
--Appendix J 401
--Appendix K 404
--Appendix L Air Quality Modeling Results
--Appendix M Response to Public Comments on Draft EA/IS
* Proposed Mitigated Negative Declaration (PDF format 30KB)
TO ALL INTERESTED PARTIES:
Lower American River Mile 0.5 Mitigation Site Sacramento River Bank Protection Project
Complete Lower American River Draft EAIS with FONSI -- Dec. 12 2007
All Interested Parties Letter
14 Critical Erosion Sites(Sacramento River at river miles (RM) 16.9L, 33.0R, 33.3R, 43.7R, 44.7R, 47.0L, 47.9R, 48.2R, 62.5R, 68.9L, and 78.0L. Three critically eroding sites are along Steamboat Slough at RM 19.0R, 19.4R, and 22.7R.)
Availability of Final EA letter to Public WO Enclosure -- The public review period for the draft EA ended on Dec 15, 2006. All comments received by that date have been addressed and incorporated into the final document, as appropriate. The EA and FONSI have been prepared in accordance with National Environmental Policy Act guidelines. Construction is anticipated to begin in January 2007 and be completed by the end of November 2007.
5 Critical Erosion Sites (River Miles 26.9, 34.5, 72.2, 99.3, and 123.5)
Availability of Final EAIS letter to Public WO Enclosure -- The public review period for the draft EA/IS ended on June 5, 2006. All comments received by that date were addressed and incorporated into the final document, as appropriate. The final EA/IS and FONSI have been prepared in accordance with National Environmental Policy Act guidelines. Construction is anticipated to begin in July 2006 and be completed by the end of November 2006.
Pocket Erosion Sites (River Miles 49.6, 49.9, 50.2, 50.4, 50.8, 51.5, 52.4, and 53.1)
Availability of Final EAIS letter to Public WO Enclosure -- The public review period for the draft EA/IS ended on May 7, 2006. All comments received by that date were addressed and incorporated into the final document, as appropriate. The final EA/IS and FONSI have been prepared in accordance with National Environmental Policy Act guidelines. Construction is anticipated to begin in July 2006 and be completed by the end of November 2006.
|