As a general policy, SECY Papers will be released to the public unless they contain specific limited types of information which warrant protection. Missing numbers in the listing indicate that these papers involve matters which the Commission has specifically agreed should be withheld: Classified, Safeguards, Allegation, Investigation, Security-Related, Proprietary, Privacy Act Information, Federal/State/Foreign Government and International Agency-Controlled Information, Adjudicatory, Enforcement, Lawyer-Client or Legal Work Product, and limited sensitive matters which contain a specific withhold recommendation and supporting justification. (Reference Internal Commission Procedures, Chapter II.)
Document Number |
File Type |
Description |
Date |
SECY-98-303 |
|
Interim Enforcement Policy Regarding Proposed New Requirements for
the Possession of Industrial Devices Containing Byproduct Material
(10 CFR 31.5) |
12/29/1998 |
SECY-98-302 |
|
Annual Status Report on Licensing Actions, Fiscal Year 1998 |
12/29/1998 |
SECY-98-301 |
|
Litigation Report - 1998 - 6 |
12/29/1998 |
SECY-98-300 |
|
Options for Risk-Informed Revisions to 10 CFR Part 50 - "Domestic
Licensing of Production and Utilization Facilities" |
12/23/1998 |
SECY-98-299 |
|
Weekly Information Report - Week Ending December 18, 1998 |
12/23/1998 |
SECY-98-298 |
|
Status Report on Accident Sequence Precursor Program and Related
Initiatives |
12/22/1998 |
SECY-98-296 |
|
Agency Policy Regarding Licensee Recapture of Low-Power Testing
or Shutdown Time for Nuclear Power Plants |
12/21/1998 |
SECY-98-295 |
|
Effectiveness of Criteria for Funding Agreement State Training |
12/18/1998 |
SECY-98-294 |
|
Changes to Paragraph (h) of 10 CFR Part 50.55a, "Codes and
Standards" |
12/18/1998 |
SECY-98-293 |
|
Status Report of the U.S. Nuclear Regulatory Commission Task Force
on Oversight of the U.S. Department of Energy, in Response to COMSECY-96-053-DSI
2 (Report No. 6) |
12/18/1998 |
SECY-98-291 |
|
Plan for Improving the Effectiveness of NRC's Training Programs |
12/18/1998 |
SECY-98-290 |
|
Litigation Report - 1998 - 5 |
12/16/1998 |
SECY-98-289 |
|
Proposed Amendments to 10 CFR Parts 21, 50, and 54 Regarding Use
of Alternative Source Terms at Operating Reactors |
12/15/1998 |
SECY-98-288 |
|
Weekly Information Report - Week Ending December 11, 1998 |
12/15/1998 |
SECY-98-286 |
|
Status Report on the Continuing Recovery of Millstone Nuclear Power
Station |
12/11/1998 |
SECY 98-285 |
|
Weekly Information Report - Week Ending December 4, 1998 |
12/10/1998 |
SECY-98-284 |
|
Transfers of Material Containing less than 0.05 Percent by Weight
Source Material under 10 CFR 40.51(b)(3) and (B)(4), and 40.13(a) |
12/08/1998 |
SECY-98-282 |
|
Part 52 Rulemaking Plan |
12/04/1998 |
SECY-98-281 |
|
Resident Inspector Compensation Policy |
12/02/1998 |
SECY-98-280 |
|
Weekly Information Report - Week Ending November 27, 1998 |
12/03/1998 |
SECY-98-279 |
|
Partial Granting of Petition for Rulemaking Submitted by the Nuclear
Energy Institute (PRM-50-62) |
11/30/1998 |
SECY-98-278 |
|
Proposed Rule "Changes to Requirements for Environmental
Review for Renewal of Nuclear Power Plant Operating Licenses (10 CFR
Part 51)" |
12/01/1998 |
SECY-98-277 |
|
The Commissioner's Assistant Candidate Pool |
11/25/1998 |
SECY-98-276 |
|
Weekly Information Report - Week Ending November 20, 1998 |
11/25/1998 |
SECY-98-275 |
|
Report to Congress on the Gaseous Diffusion Plants Located near
Paducah, Kentucky, and Portsmouth, Ohio |
11/24/1998 |
SECY-98-274 |
|
Commonwealth Edison Company's Proposal to Centralize its Emergency
Operations Facilities at its Corporate Offices |
11/23/1998 |
SECY-98-273 |
|
Potential Funding Assistance for Agreement States for Closure of
Formerly Terminated NRC Licenses |
11/20/1998 |
SECY-98-272 |
|
Proposed Arrangement for Technical Information Exchange and Cooperation
Between the U.S. NRC and Romanian National Commission for Nuclear Activities
Control |
11/23/1998 |
SECY-98-271 |
|
Equal Employment Opportunity (EEO) Briefing |
11/18/1998 |
SECY-98-270 |
|
Results of the Staff's Evaluation of Ongoing Feedback from Licensees
Regarding the Impact of NRC's Activities on Licensees' Operations |
11/18/1998 |
SECY-98-269 |
|
Weekly Information Report - Week Ending November 13, 1998 |
11/18/1998 |
SECY-98-267 |
|
Rulemaking Plan for the AP600 |
11/16/1998 |
SECY-98-266 |
|
Final Rule -- Requirements for Initial Operator Licensing Examinations |
11/13/1998 |
SECY 98-265 |
|
Weekly Information Report - Week Ending November 6, 1998 |
11/12/1998 |
SECY-98-264 |
|
Proposed Amendments to 10 CFR 50.47; Granting of Petitions for Rulemaking
(PRM 50-63 and 50-63a) Relating to a Reevaluation of Policy on the
Use of Potassium Iodide (KI) after a Severe Accident at a Nuclear
Power Plant |
11/10/1998 |
SECY-98-263 |
|
Proposed Rule: Revision of 10 CFR Part 35, Medical Use of Byproduct
Material |
11/09/1998 |
SECY-98-261 |
|
Policy Concerning Bundling of Exempt Quantities |
11/05/1998 |
SECY-98-259 |
|
Weekly Information Report - Week Ending October 30, 1998 |
11/05/1998 |
SECY-98-258 |
|
DSI-24 Implementation: Decommissioning Licensing Actions and Priorities
and Milestones for Addressing Rulemaking and Guidance Development |
11/04/1998 |
|
Commissioner McGaffigan's Comments |
12/08/1998 |
SECY-98-257 |
|
Final Rule, Part 2, Subpart M - "Public Notification, Availability
of Documents and Records, Hearing Requests and Procedures for Hearings
on License Transfer Applications" |
11/03/1998 |
SECY-98-256 |
|
Proposed Revision to the Enforcement Policy to Address Severity
Level IV Violations at Power Reactors |
11/03/1998 |
SECY-98-255 |
|
Early Public Input on Comprehensive Rule on Generally Licensed Devices |
11/02/1998 |
|
Commissioner McGaffigan's Comments |
|
SECY-98-253 |
|
Applicability of Plant-Specific Backfit Requirements to Plants Undergoing
Decommissioning |
11/04/1998 |
SECY-98-252 |
|
Preliminary Staff Views Concerning its Review of the Foreign Ownership
Aspects of Amergen, Inc.'s Proposed Purchase of Three Mile Island,
Unit 1 |
10/30/1998 |
SECY-98-251 |
|
Decommissioning Criteria for West Valley |
10/30/1998 |
SECY-98-249 |
|
Weekly Information Report - Week Ending October 23, 1998 |
10/29/1998 |
SECY-98-248 |
|
Proposed Generic Letter 98-xx "Steam Generator Tube Integrity" |
10/28/1998 |
SECY-98-247 |
|
Risk-Informed, Performance-Based Fire Protection at Nuclear Power
Plants |
10/27/1998 |
SECY-98-246 |
|
Standard Review Plan Regarding Foreign Ownership, Control, or Domination
of Applicants for Reactor Licenses |
10/23/1998 |
SECY-98-245 |
|
Rulemaking Plan - Protection Against Discrete Radioactive Particle
(DRP) Exposures (10 CFR Part 20) |
10/23/1998 |
SECY-98-244 |
|
NRC Human Performance Plan |
10/22/1998 |
SECY-98-242 |
|
Screening Table for Building-Surface Contamination, as Guidance
in Support of the Final Rule on Radiological Criteria for License
Termination |
10/21/1998 |
SECY-98-241 |
|
Weekly Information Report - Week Ending October 16, 1998 |
10/21/1998 |
SECY-98-239 |
|
Post-Disposal Criticality Research |
10/19/1998 |
SECY-98-237 |
|
Final Rule, Part 2, Subpart J, "Procedures Applicable to Proceedings
for the Issuance of Licenses for the Receipt of High-Level Radioactive
Waste at a Geologic Repository" |
10/19/1998 |
SECY-98-236 |
|
Weekly Information Report - Week Ending October 9, 1998 |
10/15/1998 |
SECY-98-235 |
|
Proposed Revision of Appendix K to Title 10 Part 50 of the Code
of Federal Regulations (10 CFR Part 50) |
10/09/1998 |
SECY-98-234 |
|
|
Weekly Information Report - Week Ending October 2, 1998 |
10/08/1998 |
SECY-98-232 |
|
Seaman Nuclear's Application for a License to Distribute Portable
Moisture Density Gauges to General Licensees |
10/05/1998 |
SECY-98-231 |
|
Authorization of the Trojan Reactor Vessel Package for One-Time
Shipment for Disposal |
10/02/1998 |
|
Commissioner McGaffigan's Comments |
10/07/1998 |
SECY-98-230 |
|
Insights from NRC Research on Fire Protection and Related Issues |
10/02/1998 |
SECY 98-229 |
|
Weekly Information Report - Week Ending September 25, 1998 |
10/02/1998 |
SECY-98-228 |
|
Proposed Streamlining and Consolidation of AEOD Functions and Responsibilities |
10/01/1998 |
SECY-98-226 |
|
Issuance of a Section 274f, Atomic Energy Act Order to Exempt Envirocare
of Utah, Inc. from the Licensing Requirements for Special Nuclear
Material in Diffuse Waste That Will Be Regulated by the State of Utah |
09/29/1998 |
|
Chairman Jackson's Comments |
10/20/1998 |
|
Commission McGaffigan's Comments |
10/05/1998 |
SECY-98-225 |
|
Proposed Rule: 10 CFR Part 63 "Disposal of High-Level
Radioactive Wastes in a Proposed Geologic Repository at Yucca Mountain,
Nevada" |
09/28/1998 |
SECY-98-224 |
|
Staff and Industry Activities Pertaining to the Management of Commitments
Made by Power Reactor Licensees to the NRC |
09/28/1998 |
SECY-98-223 |
|
Litigation Report - 1998 - 4 |
09/25/1998 |
SECY-98-222 |
|
Status Report of the U.S. Nuclear Regulatory Commission Task Force
on Oversight of the U.S. Department of Energy, in Response to COMSECY-96-053-DSI
2 (Report No. 5) |
09/24/1998 |
SECY 98-220 |
|
Weekly Information Report - Week Ending September 18, 1998 |
09/24/1998 |
SECY-98-219 |
|
Completion of Staff's Review and Issuance of the Final Safety Evaluation
Report on Reduction in Augmented Examination Requirements for Boiling
Water Reactor Pressure Vessels Pursuant to 10 CFR 50.55a(g)(6)(ii)(A) |
09/21/1998 |
SECY-98-218 |
|
Suspension of the Systematic Assessment of Licensee Performance
Program |
09/21/1998 |
SECY-98-217 |
|
Weekly Information Report - Week Ending September 11, 1998 |
09/18/1998 |
SECY-98-215 |
|
Request by Arkansas to Relinquish Authority for Sealed Source and
Device Evaluation and Approval |
09/15/1998 |
SECY-98-211 |
|
Weekly Information Report - Week Ending September 4, 1998 |
09/11/1998 |
SECY-98-209 |
|
Proposed Agreement with the State of Ohio and Compatibility Requirements
of 10 CFR Part 20, Subpart E |
09/08/1998 |
SECY-98-208 |
|
|
Weekly Information Report - Week Ending August 28, 1998 |
09/03/1998 |
SECY-98-206 |
|
National Academy of Sciences/National Research Council Grant to
Fund the Biological Effects of Ionization Radiation Study Number VII
(BEIR VII) |
09/01/1998 |
SECY-98-204 |
|
|
Weekly Information Report - Week Ending August 21, 1998 |
08/28/1998 |
SECY-98-205 |
|
Funding for Nuclear Regulatory Commission Material Protection, Control,
and Accounting Assistance to the Republics of the Former Soviet Union |
08/28/1998 |
SECY-98-202 |
|
Implementation of the Convention on Nuclear Safety |
08/25/1998 |
SECY-98-201 |
|
Deferral of Regulatory Oversight of Certain Portions of the Lake
City Army Ammunition Plant to the U.S. Environmental Protection Agency |
08/21/1998 |
SECY-98-200 |
|
|
Weekly Information Report - Week Ending August 14, 1998 |
08/20/1998 |
SECY-98-199 |
|
Proposed Rule: 10 CFR Part 31 - "Requirement for Those Who
Possess Certain Industrial Devices Containing Byproduct Material to
Provide Requested Information" |
08/19/1998 |
SECY-98-198 |
|
Status of the Issue Resolution Process in the High-Level Radioactive
Waste Program at Yucca Mountain, Nevada |
08/19/1998 |
SECY-98-197 |
|
Proposed Rule - Revision to Part 2 Establishing Subpart M to Govern
Requests for License Transfer Approval and Associated Requests for
Hearings |
08/14/1998 |
SECY-98-196 |
|
Removal of Clevite Corporation Site from the Site Decommissioning
Management Plan |
08/13/1998 |
SECY-98-195 |
|
Removal of the Cabot Boyertown Site from the Site Decommissioning
Management Plan |
08/13/1998 |
SECY-98-194 |
|
Upgrading the NRC Operations Center Emergency Telecommunications
System |
08/13/1998 |
SECY 98-193 |
|
Weekly Information Report - Week Ending August 7, 1998 |
08/13/1998 |
SECY-98-192 |
|
Resolution of Allegations Concerning the Performance of Agreement
State Programs |
08/11/1998 |
SECY 98-191 |
|
Weekly Information Report - Week Ending July 31, 1998 |
08/07/1998 |
SECY-98-190 |
|
Proposed License to Export a 10 Megawatt TRIGA Research Reactor
to Thailand (XR166) |
08/05/1998 |
SECY-98-188 |
|
A Proposed Simplification of the Rulemaking Process for Certificate
of Compliance Rulemakings |
08/03/1998 |
SECY-98-187 |
|
Interim Status Report -- Fire Protection Functional Inspection Program |
08/03/1998 |
SECY-98-186 |
|
Quarterly Status Report on the Probabilistic Risk Assessment Implementation
Plan |
07/31/1998 |
SECY-98-185 |
|
Proposed Rulemaking - Revised Requirements for the Domestic Licensing
of Special Nuclear Material |
07/30/1998 |
SECY 98-184 |
|
Weekly Information Report - Week Ending July 24, 1998 |
07/30/1998 |
SECY-98-183 |
|
Submittal and Analysis of Revised Resident Inspector Demographic
Data |
07/28/1998 |
SECY-98-182 |
|
Prioritization of International Cooperative Research Activities |
07/28/1998 |
SECY-98-180 |
|
Request for Commission Waiver of Staff Cost Recovery Policy for
Work Performed for the U.S. Agency for International Development |
07/28/1998 |
SECY 98-178 |
|
Weekly Information Report - Week Ending July 17, 1998 |
07/24/1998 |
SECY-98-176 |
|
Proposed Options for Assessing a Licensee's Safety Conscious Work
Environment |
07/21/1998 |
SECY-98-175 |
|
Proposed Guidelines for Appendix C, "Other Events of Interest,"
to the Abnormal Occurrence Report to Congress |
07/17/1998 |
SECY 98-173 |
|
Weekly Information Report - Week Ending July 10, 1998 |
07/16/1998 |
SECY-98-172 |
|
Proposed Rule: "Certification Renewal and Amendment Processes,"
10 CFR Part 76 |
07/10/1998 |
SECY-98-171 |
|
Proposed Rulemaking on 10 CFR Parts 50, 52 and 72 Requirements Concerning
Changes, Tests and Experiments and Staff Recommendations on Changes
to Other Regulations and Enforcement Policy |
07/10/1998 |
SECY-98-170 |
|
Response to Staff Requirements Memorandum of June 30, 1997, Regarding
(1) the Use of Graphs or Charts at the Senior Management Meeting,
(2) Improvements to Help the Public Understand the Linkages Between
the Various Evaluation Mechanisms That the NRC Uses, and (3) Superior
Performance Recognition (M970625A) |
07/09/1998 |
SECY-98-169 |
|
Weekly Information Report - Week Ending July 2, 1998 |
07/10/1998 |
SECY-98-168 |
|
Proposed Rulemaking Activity Plan |
07/09/1998 |
SECY-98-166 |
|
Summary of Activities Related to Generic Safety Issues |
07/06/1998 |
SECY-98-165 |
|
Proposed Revision to 10 CFR 50.65(a)(3) to Require Licensees to
Perform Safety Assessments |
07/02/1998 |
SECY-98-164 |
|
Final Rule on Financial Assurance Requirements for Decommissioning
Nuclear Power Reactors |
07/02/1998 |
SECY-98-163 |
|
Annual Report on the Status of Prematurely Shut Down Plants |
07/01/1998 |
SECY-98-161 |
|
The Westinghouse AP600 Standard Design as it Relates to the Fire
Protection and the Spent Fuel Pool Cooling Systems |
07/01/1998 |
SECY-98-160 |
|
NRC's 1998 Report to Congress on the Price-Anderson Act |
07/02/1998 |
SECY-98-159 |
|
Litigation Report - 1998 - 3 |
07/01/1998 |
SECY-98-158 |
|
Rulemaking Plan for Implementation of Revised Source Term at Operating
Reactors |
07/30/1998 |
SECY-98-157 |
|
Compliance of Great Bay Power Corporation with the NRC's Decommissioning
Funding Assurance Requirements |
07/30/1998 |
SECY-98-156 |
|
Weekly Information Report - Week Ending June 26, 1998 |
07/01/1998 |
SECY-98-155 |
|
Transition from Site Decommissioning Management Plan to Comprehensive
Decommissioning Program |
06/30/1998 |
SECY-98-154 |
|
Results of the Revised (NUREG-1465) Source Term Rebaselining for
Operating Reactors |
06/30/1998 |
SECY-98-153 |
|
Update of Issues Related to Nuclear Power Reactor Financial Qualifications
in Response to Restructuring of the Electric Utility Industry |
06/29/1998 |
SECY-98-152 |
|
Summary of Issues and Recommended Improvements to the Resident Inspector
Program |
06/29/1998 |
SECY-98-150 |
|
Final Rule, 10 CFR Part 140, "Financial Protection Requirements
and Indemnity Agreements" |
06/26/1998 |
SECY-98-149 |
|
Status Report of the U.S. Nuclear Regulatory Commission Task Force
on Oversight of the U.S. Department of Energy, in Response to COMSECY-96-053-DSI
2 (Report No. 4) |
06/26/1998 |
SECY-98-148 |
|
Rulemaking Plan: 10 CFR Part 72 - Clarification and Addition of
Flexibility |
06/25/1998 |
SECY-98-147 |
|
Weekly Information Report - Week Ending June 19, 1998 |
06/25/1998 |
SECY-98-146 |
|
Final Version Standard Review Plan Chapter for U.S. Enrichment Corporation
Privatization |
06/22/1998 |
SECY-98-144 |
|
White Paper on Risk-Informed and Performance-Based Regulation |
01/22/1998 |
SECY-98-143 |
|
Litigation Report - 1998 - 2 |
06/22/1998 |
SECY-98-142 |
|
Weekly Information Report - Week Ending June 12, 1998 |
06/18/1998 |
SECY-98-139 |
|
Trial Use of Application-Specific Regulatory Guide and Standard
Review Plan for Risk-Informed Inservice Inspection of Piping |
06/11/1998 |
SECY-98-138 |
|
Risk-Informed, Performance-Based and Risk-Informed, Less-Prescriptive
Regulation in the Office of Nuclear Material Safety and Safeguards |
06/11/1998 |
SECY-98-137 |
|
Equal Employment Opportunity (EEO) Briefing |
06/10/1998 |
SECY-98-135 |
|
Decommissioning Pilot Program for Materials Licensees |
06/11/1998 |
SECY-98-134 |
|
Weekly Information Report - Week Ending June 5, 1998 |
06/11/1998 |
SECY-98-133 |
|
Proposed Subsequent Arrangement under the U.S.-EURATOM Agreement
for Cooperation to Give Advance Consent to Retransfers of U.S.-Obligated
Plutonium to Switzerland |
06/10/1998 |
SECY-98-132 |
|
Plans to Increase Performance-Based Approaches in Regulatory Activities
(WITS - 9700093) |
06/09/1998 |
SECY-98-131 |
|
Status of the Integration Plan for Closure of Severe Accident Issues
and the Status of Severe Accident Research |
06/08/1998 |
SECY-98-130 |
|
Additional Funding to Make U.S. Nuclear Regulatory Commission Documents
on Human Radiation Experiments Available on World-Wide Web |
06/08/1998 |
SECY-98-129 |
|
Impact Statement Regarding Elimination of Nuclear Regulatory Commission
Funds for Credibility Assessment Team Support for the Federal Bureau
of Investigation |
06/08/1998 |
SECY-98-128 |
|
Proposed Rule: Revision of 10 CFR Part 35, Medical Use of Byproduct
Material |
06/04/1998 |
SECY-98-127 |
|
Draft Proposed Policy Statement on the Medical Use of Byproduct
Material |
06/04/1998 |
SECY-98-126 |
|
Rulemaking Plan: Geological and Seismological Characteristics for
Siting and Design of Dry Cask Independent Spent Fuel Storage Installations,
10 CFR Part 72 |
06/04/1998 |
SECY 98-125 |
|
Weekly Information Report - Week Ending May 29, 1998 |
06/04/1998 |
SECY-98-123 |
|
Performance Evaluation for ACRS and ACNW |
06/01/1998 |
SECY-98-122 |
|
Assessment of Technical Skills Availability |
05/28/1998 |
SECY-98-121 |
|
Implementation of the IAEA Convention on Nuclear Safety |
05/28/1998 |
SECY-98-120 |
|
Enforcement Discretion for Louisiana Licensees |
05/28/1998 |
SECY 98-119 |
|
Remaining Issues Related to Recovery of Millstone Nuclear Power
Station, Unit 3 |
05/28/1998 |
SECY-98-117 |
|
Shelwell Services, Inc., Risk Assessment |
05/27/1998 |
SECY 98-115 |
|
Weekly Information Report - Week Ending May 22, 1998 |
05/27/1998 |
SECY-98-113 |
|
Proposed Rule: Expand Applicability of 10 CFR Part 72 to Holders
of, and Applicants for, Certificates of Compliance, and Their Contractors
and Subcontractors |
05/26/1998 |
SECY 98-111 |
|
Weekly Information Report - Week Ending May 15, 1998 |
05/21/1998 |
SECY-98-110 |
|
Report on Inspection and Programmatic Findings Relating to the Carl
C. Drega Incident |
05/20/1998 |
SECY 98-107 |
|
Weekly Information Report - Week Ending May 8, 1998 |
05/13/1998 |
SECY-98-106 |
|
Implementation of New International Atomic Energy Agency Safeguards
Measures in the United States |
05/13/1998 |
SECY-98-105 |
|
Rulemaking Plan: Energy Compensation Sources for Well Logging and
Clarifications - Changes to 10 CFR Part 39 |
05/12/1998 |
SECY-98-104 |
|
Staff Requirements - COMSECY-96-031 - (DSI-17) - Strategic Assessment
Issue Paper: Management and Organization and COMSECY-96-026 (DSI-15)
- Management Philosophy |
05/07/1998 |
SECY 98-103 |
|
Weekly Information Report - Week Ending May 1, 1998 |
05/08/1998 |
SECY-98-102 |
|
Core Capabilities |
05/06/1998 |
SECY-98-101 |
|
Modifications to the Safety Goal Policy Statement |
05/04/1998 |
SECY-98-099 |
|
Status Report of Staff Activities Related to Reviewing the Viability
of Entombment as a Decommissioning Option for Power Reactors |
05/04/1998 |
SECY-98-098 |
|
Guidelines for Providing Assistance to Agreement States and Alternatives
for Training |
05/04/1998 |
SECY-98-097 |
|
Advance Final Safety Evaluation Report on the Westinghouse AP600
Standard Design |
05/01/1998 |
SECY-98-096 |
|
Quarterly Status Report on the Probabilistic Risk Assessment Implementation
Plan |
05/01/1998 |
SECY-98-094 |
|
Proposed NRC Generic Letter 98-XX, "Year 2000 Readiness of
Computer Systems at Nuclear Power Plants" |
05/01/1998 |
SECY-98-093 |
|
Proposed NRC Generic Letter 98-xx, Loss of Reactor Coolant Inventory
and Associated Potential for Loss of Emergency Mitigation Functions
While in a Shutdown Condition |
04/30/1998 |
SECY 98-092 |
|
Weekly Information Report - Week Ending April 24, 1998 |
04/30/1998 |
SECY-98-090 |
|
Selected Issues Related to Recovery of Millstone Nuclear Power Station
Unit 3 |
04/24/1998 |
SECY-98-089 |
|
Public Communications Initiative (DSI-14) |
04/24/1998 |
SECY 98-088 |
|
Weekly Information Report - Week Ending April 17, 1998 |
04/23/1998 |
SECY-98-087 |
|
Proposed Generic Letter 98-XX: Interim Guidance for Updated Final
Safety Analysis Reports in Accordance with 10 CFR 50.71(e) |
04/20/1998 |
SECY-98-084 |
|
Status of Efforts to Finalize Regulations for Radiological Criteria
for License Termination: Uranium Recovery Facilities |
04/15/1998 |
SECY-98-083 |
|
Plan for the Timely Confirmation of Power Reactor Licensees as "Electric
Utilities" as Economic Deregulation Proceeds |
04/16/1998 |
SECY-98-082 |
|
|
Weekly Information Report - Week Ending April 10, 1998 |
04/15/1998 |
SECY-98-081 |
|
Proposed License to Export Heavy Water to the United Arab Emirates
(XMAT0392) |
04/14/1998 |
SECY-98-080 |
|
Status Report of the Nuclear Regulatory Commission Task Force on
Oversight of the U.S. Department of Energy, in Response to COMSECY-96-053-DSI
2 (Report No. 3) |
04/14/1998 |
SECY-98-078 |
|
Preparation for Senior Management Meetings for Fuel Cycle Facilities
and Higher-Risk Materials Licensees |
04/13/1998 |
SECY-98-077 |
|
Proposed Rule: "Respiratory Protection and Controls to Restrict
Internal Exposures, 10 CFR Part 20" |
04/13/1998 |
SECY-98-076 |
|
Core Research Capabilities |
04/09/1998 |
SECY-98-075 |
|
DSI-24 Implementation: Innovative Regulatory Approaches and Risk-Informed,
Performance-Based Concepts Applied to Decommissioning |
04/09/1998 |
SECY-98-074 |
|
Process for the Declassification and Release of Inventory Difference
Data |
04/09/1998 |
SECY-98-073 |
|
Litigation Report - 1998 - 1 |
04/09/1998 |
SECY 98-072 |
|
Weekly Information Report - Week Ending April 3, 1998 |
04/09/1998 |
SECY-98-071 |
|
Exemption to 10 CFR 72.102(f)(1) Seismic Design Requirement for
Three Mile Island Unit 2 Independent Spent Fuel Storage Installation |
04/08/1998 |
SECY-98-068 |
|
Consideration of Application of Federal Government-Wide Conflict
of Interest or Ethics Requirements and NRC Enforcement Policy on Licensee
Integrity Issues to Agreement State Programs |
04/03/1998 |
SECY-98-067 |
|
Final Application-Specific Regulatory Guides and Standard Review
Plans for Risk-Informed Regulation of Power Reactors |
04/02/1998 |
SECY-98-065 |
|
FY 1998 NRC Excellence Plan |
04/02/1998 |
SECY-98-064 |
|
Weekly Information Report - Week Ending March 27, 1998 |
04/03/1998 |
SECY-98-062 |
|
Proposed Section 123 Agreement for Peaceful Nuclear Cooperation
with Ukraine |
04/01/1998 |
SECY-98-061 |
|
Staff Options for Resolving a Petition for Rulemaking (PRM-50-63
AND 50-63A) Relating to a Re-Evaluation of the Policy Regarding the
Use of Potassium Iodide (KI) by the General Public after a Severe
Accident at a Nuclear Power Plant |
03/31/1998 |
SECY-98-060 |
|
Final Rule: Revision of 10 CFR 32.14(d) to Place Timepieces Containing
Gaseous Tritium Light Sources on the Same Regulatory Basis as Timepieces
Containing Tritium Paint |
03/27/1998 |
SECY-98-059 |
|
Proposed Options for Assessing the Performance and Competency of
Licensee Management |
03/26/1998 |
SECY-98-058 |
|
Development of a Risk-Informed, Performance-Based Regulation for
Fire Protection at Nuclear Power Plants (WITS 9200197) |
03/26/1998 |
SECY-98-057 |
|
Weekly Information Report - Week Ending March 20, 1998 |
03/26/1998 |
SECY-98-056 |
|
Rulemaking Plan: Elimination of 30-day Hold in Loading Spent Fuel
after Preoperational Testing of Independent Spent Fuel Storage or
Monitored Retrievable Storage Installations |
03/24/1998 |
SECY-98-055 |
|
Response to Staff Requirements Memorandum of October 24, 1997, Regarding
Improvements in Senior Management Assessment Process for Operating
Reactors (M970919C) |
03/25/1998 |
SECY-98-054 |
|
Commission Resolution of Significant Issues Associated with the
Revision of 10 CFR Part 35, "Medical Uses of Byproduct Material" |
03/20/1998 |
SECY-98-053 |
|
Weekly Information Report - Week Ending March 13, 1998 |
03/19/1998 |
SECY-98-051 |
|
Guidance in Support of Final Rule on Radiological Criteria for License
Termination |
03/16/1998 |
SECY-98-049 |
|
Status of NRC Research Conducted by the Russian Research Center
(I.V. Kurchatov Institute) and the Institute of Nuclear Safety of
the Russian Academy of Sciences |
03/13/1998 |
SECY-98-048 |
|
Request for Limited Exemption to the Commission's Policy to Allow
Commercial Use of an NRC-Supported Code |
03/11/1998 |
SECY 98-047 |
|
Weekly Information Report - Week Ending March 6, 1998 |
03/12/1998 |
SECY-98-046 |
|
Final Rule: Amendments to 10 CFR Parts 30, 40, 50, 70, and 72--Self-Guarantee
of Decommissioning Funding by Non-Profit and Non-Bond Issuing Licensees |
03/09/1998 |
SECY-98-045 |
|
Status of the Integrated Review of the NRC Assessment Process for
Operating Commercial Nuclear Reactors (SRM 9700238) |
03/09/1998 |
SECY-98-044 |
|
Modified Rulemaking Plan: "Certification Renewal and Amendment
Process," 10 CFR Part 76 |
03/09/1998 |
SECY-98-043 |
|
Annual Status Report on the Administration of NRC's Requalification
Program and the Initial Operator Licensing Examinations (WITS 8800098) |
03/06/1998 |
SECY-98-042 |
|
Amendment to SECY-97-288, "Report to Congress on Abnormal Occurrences
for Fiscal Year 1997" |
03/05/1998 |
SECY-98-041 |
|
|
Weekly Information Report - Week Ending February 27, 1998 |
03/05/1998 |
SECY-98-040 |
|
Final Rule: Requirements for Shipping Packages Used to Transport
Vitrified High-Level Waste |
03/05/1998 |
SECY-98-039 |
|
Request by Oregon to Relinquish Authority for Sealed Source and
Device Evaluation and Approval |
03/04/1998 |
SECY-98-038 |
|
Hanford Tank Waste Remediation System Privatization Co-Located Worker
Standards |
03/04/1998 |
SECY-98-037 |
|
Core Capabilities (COMSECY-96-027) |
03/04/1998 |
SECY-98-036 |
|
Rulemaking to Modify Event Reporting Requirements for Power Reactors |
03/04/1998 |
SECY-98-033 |
|
Proposed Rule: Miscellaneous Changes to 10 CFR Part 72, Licensing
Requirements for the Independent Storage of Spent Nuclear Fuel and
High-Level Radioactive Waste |
02/26/1998 |
SECY-98-032 |
|
Revised Process for Information Technology Capital Planning and
Investment Control |
02/27/1998 |
SECY 98-031 |
|
Weekly Information Report - Week Ending February 20, 1998 |
02/27/1998 |
SECY-98-030 |
|
Implementation of DSI 22 Research |
02/25/1998 |
SECY-98-028 |
|
Regulatory Options for Setting Standards on Clearance of Materials
and Equipment Having Residual Radioactivity |
02/19/1998 |
SECY-98-027 |
|
|
Weekly Information Report - Week Ending February 13, 1998 |
02/18/1998 |
SECY-98-025 |
|
Revised Schedule for Guidance in Support of Final Rule on Radiological
Criteria for License Termination |
02/17/1998 |
SECY-98-024 |
|
Final Amendments to 10 CFR Parts 60, 72, 73, 74, and 75, "Physical
Protection for Spent Nuclear Fuel and High-Level Radioactive Waste" |
02/13/1998 |
SECY-98-023 |
|
Proposed "Subsequent Arrangement" to Authorize Argentina
to Recover and Use for Medical Isotope Production, Two Kilograms of
U.S.-Supplied, Unirradiated High Enriched Uranium (HEU) |
02/13/1998 |
SECY-98-019 |
|
Annual Report on Court Litigation (Calendar Year 1997) |
02/04/1998 |
SECY-98-018 |
|
Proposed License to Export Special Nuclear Material (XSNM02999)
to Brazil |
02/04/1998 |
SECY-98-017 |
|
Weekly Information Report - Week Ending February 6, 1998 |
02/11/1998 |
SECY-98-015 |
|
Final General Regulatory Guide and Standard Review Plan for Risk-Informed
Regulation of Power Reactors |
01/30/1998 |
SECY-98-014 |
|
Annual Report on Commission Adjudication |
01/30/1998 |
SECY-98-013 |
|
Weekly Information Report - Week Ending January 23, 1998 |
01/28/1998 |
SECY-98-012 |
|
Quarterly Status Report on the Probabilistic Risk Assessment Implementation
Plan |
01/23/1998 |
SECY-98-011 |
|
Potential Funding Assistance for Agreement States for Closure of
Formerly Terminated NRC Licenses |
01/22/1998 |
SECY-98-010 |
|
Petition for Envirocare of Utah to Possess Special Nuclear Material
in Excess of Current Regulatory Limits |
01/20/1998 |
SECY-98-009 |
|
Weekly Information Report - Week Ending January 16, 1998 |
01/22/1998 |
SECY-98-008 |
|
Weekly Information Report - Week Ending January 9, 1998 |
01/15/1998 |
SECY-98-007 |
|
Annual Status Report on Licensing Actions, Fiscal Year 1997 |
01/09/1998 |
SECY-98-006 |
|
Proposed Agreement for Cooperation Between the U.S. and Romania |
01/12/1998 |
SECY-98-004 |
|
Weekly Information Report - Week Ending December 26, 1997 and January
2, 1998 |
01/08/1998 |
SECY-98-003 |
|
Organizational Conflict of Interest Regarding Department of Energy
Laboratories |
01/06/1998 |
SECY-98-001 |
|
Staff Requirements Memorandum 951219A - Briefing on Mechanisms for
Addressing Generic Safety Issues |
01/02/1998 |