|
|
|
![](https://webarchive.library.unt.edu/eot2008/20090120084403im_/http://www.netl.doe.gov/images/double-line.gif)
Clean Coal Demonstrations
Filters, Cyclones, and Other Hot Gas Particulates Cleanup Technologies
- A.K. Henderson, et al., Characterization of Hot-Gas Filter Ash Under PFBC Operating Conditions [PDF-644KB]
- D.E. Boss, Ceramic Component Development Analysis, Volume I, Final Report [PDF-3.4MB] (June 1998)
- D.E. Boss, Hot-Gas Filter Manufacturing Assessments, Volume V, Final Report [PDF-3.2MB] (April 1997)
- J.E. Lane, et al., Advanced Hot-Gas Filter Development, Topical Report, September 1994 - May 1996 [PDF-21.4MB]
- J.L. Hurley and M.R. June, Advanced Hot Gas Filter Development, Topical Report, May 1995 - December 1996 [PDF-7.2MB]
- K. Salo, et al., "Pilot Scale Experience on IGCC Hot Gas Cleanup," [PDF-781KB] Advanced Coal-Fired Power Systems '95 Review Meeting, Morgantown, West Virginia, June 27-29, 1995
- S. Bevan, et al., "Integrated Operation of a Pressurized Fixed-Bed Gasifier, Hot Gas Desulfurization System, and Turbine Simulator," [PDF-781KB] Advanced Coal-Fired Power Systems '95 Review Meeting, Morgantown, West Virginia, June 27-29, 1995
- M.L. Swanson, Task 3.10, Gas Separation and Hot-Gas Cleanup, Topical Report [PDF-1.0MB] (November 1995)
- High Temperature High Pressure Filter Materials Exposure Test Program, Final Report, METC/3M Cooperative Agreement CRADA 94-024
- High Temperature High Pressure Filtration and Sorbent Test Program, Final Report, METC/Shell Cooperative Agreement CRADA 93-011
- J.R. Longanbach, "Particulate Control Device (PCD) Testing at the Power Systems Development Facility, Wilsonville, Alabama," [PDF-874KB] 12th Annual International Pittsburgh Coal Conference, Pittsburgh, Pennsylvania, September 11-15, 1995.
- S. Bevan, et al., "Filter Systems for IGCC Applications," [PDF-1.3MB] Advanced Coal-Fired Power Systems '95 Review Meeting, Morgantown, West Virginia, June 27-29, 1995.
- K.B. Wilson, et al., "Status of Granular Bed Filter Development Program," [PDF-663KB] Advanced Coal-Fired Power Systems '95 Review Meeting, Morgantown, West Virginia, June 27-29, 1995.
- K.B. Wilson, et al., "Moving Granular Bed Filter Development Program," [PDF-102KB] Advanced Coal-Fired Power Systems '96 Review Meeting, Morgantown, West Virginia, July 16-18, 1996.
- M.A. Galica et al., "Subpilot-Scale Testing of Acoustically Enhanced Cyclone Collectors," [PDF-4.3MB] Final Report, September 1988 - September 1994 (August 1994).
- Particulate Hot Gas Stream Cleanup Technical Issues, Quarterly Reports
- Particulate Hot Gas Stream Cleanup Technical Issues, Annual Report, October 1994 - September 1995 [PDF-9.4MB] (December 1995)
- D.H. Pontius and T.R. Synder, "Particulate Hot Gas Stream Cleanup Technical Issues," [PDF-334KB] Advanced Coal-Fired Power Systems '96 Review Meeting, Morgantown, West Virginia, July 16-18, 1996.
- T. Snyder and D. Pontius, "Particulate Hot Gas Stream Cleanup Technical Issues ," [PDF-1.1MB] Advanced Coal-Based Power and Environmental Systems '97 Conference, Pittsburgh, Pennsylvania, July 22-24, 1997.
- E.P. Stankiewicz, et al., "Hot-Gas Filter Development," [PDF-15KB] Advanced Coal-Based Power and Environmental Systems '97 Conference, Pittsburgh, Pennsylvania, July 22-24, 1997.
- M.L. Swanson, et al., "Hot-Gas Filter Ash Characterization Project," [PDF-47KB] Advanced Coal-Based Power and Environmental Systems '97 Conference, Pittsburgh, Pennsylvania, July 22-24, 1997.
- Energy and Environmental Research Emphasizing Low-rank Coal, Task 4.3 -- Hot Gas Cleaning, Technical Report (includes Semiannual Report for January - June 1995), [PDF-2.0MB] (June 1995).
- J.A. Salter and J.M. Rockey, "Shell/METC High-Temperature, High-Pressure Filtration Program," [PDF-917KB] 12th Annual International Pittsburgh Coal Conference, Pittsburgh, Pennsylvania, Sept 11-15, 1995.
- T.E. Lippert, et al., "Westinghouse Advanced Particle Filter System," Advanced Coal-fired Power Systems '95 Review Meeting, Morgantown, West Virginia, June 27-29, 1995. [PDF-1.2MB]
- R.A. Dennis, et al., "Filter System Cost Comparison for IGCC and PFBC Power Systems," [PDF-874KB] 12th Annual International Pittsburgh Coal Conference, Pittsburgh, Pennsylvania, September 11-15, 1995.
- R.A. Dennis, "The Morgantown Energy Technology Center's Particulate Cleanup Program," [PDF-833KB] Conference on New Power Generation Technology, San Francisco, California, October 25-27, 1995.
- Hot Gas Cleanup Test Facility for Gasification and Pressurized Combustion Project, Quarterly Reports
- Fundamental Mechanisms in Flue Gas Conditioning
- T.E. Lippert, et al., "Westinghouse Advanced Particle Filter System," [PDF-1.2MB] Advanced Coal-Fired Power Systems '95 Review Meeting, Morgantown, West Virginia, June 27-29, 1995.
- T.E. Lippert, et al., "Westinghouse Advanced Particle Filter System," [PDF-108KB] Advanced Coal-Fired Power Systems '96 Review Meeting, Morgantown, West Virginia, July 16-18, 1996.
- M.D. Mann, et al., "Hot Gas Filter Testing with a Transport Reactor Demonstration Unit," Advanced Coal-Fired Power Systems '95 Review Meeting, Morgantown, West Virginia, June 27-29, 1995. [PDF-921KB]
- M.L. Swanson and R.O. Ness, Jr., "Hot Gas Filter Testing with a Transport Reactor Development Unit," [PDF-257KB] Advanced Coal-Fired Power Systems '96 Review Meeting, Morgantown, West Virginia, July 16-18, 1996.
- R. Dennis, "U. S. Department of Energy's High-Temperature and High-Pressure Particulate Cleanup for Advanced Coal-Based Power Systems," [PDF-440KB] Air & Waste Management Association 90th Annual Meeting and Exhibition, Toronto, Ontario, Canada, June 8-13, 1997.
- R.A. Newby, et al., "Integrated Low Emissions Cleanup System for Coal Fueled Turbines, Phase III, Bench-Scale Testing and Evaluation," [PDF-10.5MB] Final Report, September 1987 - July 1995 (August 1995).
- R.A. Newby, et al., Integrated Low Emissions Cleanup System for Coal Fueled Turbines (Moving Bed, Fluid Bed Contactor/Ceramic Filter), Quarterly Reports
- PFBC Hot Gas Cleanup Test Prog., Quarterly Report, April-June 1995 [PDF-372KB]
- Evaluation, Engineering, and Development of Advanced Cyclone Processes, Final Separating Media Evaluation and Test Report [PDF-2.5MB] (May 1995)
- Evaluation, Engineering, and Development of Advanced Cyclone Processes, Final Separating Media Evaluation and Test Report, Appendices (Material Safety Data, Aqueous Medium Regeneration Report, pH Control Strategy, MEM Notes and Data) [PDF-2.7MB]
- Evaluation, Engineering, and Development of Advanced Cyclone Processes, Quarterly Technical Progress Reports
- M.A. Galica, et al., Subpilot-Scale Testing of Acoustically Enhanced Cyclone Collectors, Final Report, September 1988 - September 1994. [PDF-4.3MB]
- J.P.Hurley and J.W. Nowok, Support Services for Ceramic Fiber-Ceramic Matrix Composites, Annual Technical Progress Report [PDF-1.5MB] (December 1996)
- J.P.Hurley and V. Kuhnel, Support Services for Ceramic Fiber-Ceramic Matrix Composites, Annual Technical Progress Report [PDF-683KB] (June 1998)
- E.R. Kupp, et al., High Temperature Corrosion of Advanced Ceramic Materials for Hot Gas Filters and Heat Exchangers, Final Report [PDF-3.1MB] (August 1995)
- K.E. Spear, et al., High Temperature Corrosion of Advanced Ceramic Materials for Hot Gas Filters, Topical Report for Part 1 of High Temperature Materials for Hot Gas Filters and Heat Exchangers [PDF-2.6MB] (December 1997)
- R.R. Judkins, et al., "Carbon Formation and Metal Dusting in Hot-Gas Cleanup Systems of Coal Gasifiers," [PDF-1.1MB] Advanced Coal-Fired Power Systems '95 Review Meeting, Morgantown, West Virginia, June 27-29, 1995.
- J.P. Hurley, et al., "Hot-Gas Filter Ash Characterization," Advanced Coal-Fired Power Systems '95 Review Meeting, Morgantown, West Virginia, June 27-29, 1995. [PDF-1.1MB]
- K.P. Plucknett, et al., Environmental Aging Degradation in Continuous Fiber Ceramic Composites. [PDF-893KB]
- S.G. DiPietro and M.A. Alvin, Development and Characterization of Textron Continuous Fiber Ceramic Composite Hot Gas Filter Materials, Final Report, September 1994 - October 1997. [PDF-6.9MB]
- Continuous Fiber Ceramic Composites for Energy Related Applications, Final Report [PDF-5.0MB] (April 1998)
- J. Sankar, et al., Effect of Sample Test Volume and Geometry of the Tensile Mechanical Behavior of SIC/SIC Continuous Fiber Ceramic Composites, Final Report. [PDF-2.0MB]
- B.A. Dockter, et al., "Hot-Gas Filter Ash Characterization Project,"[PDF-103KB] Advanced Coal-Fired Power Systems '96 Review Meeting, Morgantown, West Virginia, July 16-18, 1996.
- B. Bishop and N. Raskin, "CeraMem Filter Development Program," [PDF-294KB] Advanced Coal-Fired Power Systems '96 Review Meeting, Morgantown, West Virginia, July 16-18, 1996.
- Task 3.13 -- Hot Gas Filter Testing, Semi-Annual Reports
|
|
|
|