| Guidance: Zone A99 and Zone AR Determinations (May 2015) | 0.15M | July 15, 2015 |
| Guidance: Areas of Mitigation Interest (May 2016) | 0.81M | |
| Guidance: Coastal General Study Considerations (May 2016) | 0.41M | September 6, 2016 |
| Guidance: Flood Risk Report (May 2016) | 0.91M | September 6, 2016 |
| Guidance: Discovery (May 2016) | 0.62M | August 4, 2016 |
| Guidance: Coastal General Study Considerations (May 2014) | 0.34M | July 30, 2014 |
| Guidance: Flood Risk Map (May 2014) | 1.38M | August 1, 2014 |
| Guidance: Flood Risk Database (May 2016) | 0.55M | August 16, 2016 |
| Guidance: Flood Risk Map (May 2016) | 1.55M | August 16, 2016 |
| Guidance: Coastal Water Levels (May 2016) | 0.76M | August 23, 2016 |
| Guidance: Flood Insurance Rate Map (FIRM) Graphics (May 2016) | 2.69M | |
| Guidance: Coastal Notation, Acronyms, and Glossary of Terms (May 2016) | 0.45M | August 23, 2016 |
| Guidance: Coastal Non-Regulatory Datasets (May 2014) | 0.67M | August 23, 2016 |
| Guidance: MT-1 Technical (May 2016) | 1.79M | July 29, 2016 |
| Guidance: Contiguous Community Matching (May 2016) | 0.09M | July 29, 2016 |
| Guidance: Database Verification Tool (DVT) (May 2016) | 0.18M | July 29, 2016 |
| Guidance: Flood Insurance Rate Map (FIRM) Index (Nov 2015) | 1.87M | December 11, 2015 |
| Guidance: Coastal Floodplain Mapping (Nov 2015) | 0.91M | December 18, 2015 |
| Guidance: Coastal Structures (Nov 2015) | 0.21M | December 18, 2015 |
| Guidance: Mapping Information Platform (Nov 2015) | 1.70M | December 11, 2015 |
| Guidance: Stakeholder Engagement Project Planning Phase (May 2016) | 0.19M | August 4, 2016 |
| Guidance: Stakeholder Engagement Preliminary National Flood Insurance Program (NFIP) Map Release Phase (May 2016) | 0.23M | August 4, 2016 |
| Guidance: Stakeholder Engagement Due Process Phase (May 2016) | 0.30M | August 4, 2016 |
| Guidance: Stakeholder Engagement Discovery Phase (May 2016) | 0.29M | August 4, 2016 |
| Guidance: Stakeholder Engagement Risk Awareness Phase (May 2016) | 0.77M | August 4, 2016 |
| Guidance: Technical Support Data Notebook and Flood Elevation Determination Docket (May 2016) | 0.34M | |
| Guidance: Automated Engineering (May 2016) | 0.54M | July 21, 2016 |
| Guidance: Appeal and Comment Processing (May 2016) | 0.76M | July 21, 2016 |
| Guidance: Levee-Specific Non-Regulatory Flood Risk Datasets (May 2016) | 1.07M | July 21, 2016 |
| Guidance: Letter of Final Determination (May 2016) | 0.38M | July 21, 2016 |
| Guidance: Flood Risk Assessments (May 2016) | 0.85M | July 21, 2016 |
| Guidance: Base Map and FIRM Panel Layout (May 2016) | 0.81M | July 29, 2016 |
| Guidance: Data Capture - Workflow Details (May 2016) | 3.03M | July 29, 2016 |
| Guidance: Elevation (May 2016) | 0.16M | July 29, 2016 |
| Guidance: Documentation of Endangered Species Act Compliance for Conditional Letters of Map Change (May 2016) | 0.29M | July 29, 2016 |
| Guidance: Flood Insurance Rate Map (FIRM) Database (May 2016) | 2.81M | July 29, 2016 |
| Guidance: General Hydologic Considerations (May 2016) | 0.17M | July 29, 2016 |
| Guidance: Geospatial Data Coordination (May 2016) | 0.23M | July 29, 2016 |
| Guidance: Key Decision Point (KDP) Process (May 2016) | 1.41M | July 29, 2016 |
| Guidance: LOMR Incorporation (May 2016) | 0.19M | July 29, 2016 |
| Guidance: Notice-to-Users Revisions (May 2016) | 0.60M | July 29, 2016 |
| Guidance: Physical Map Revision (PMR) (May 2016) | 0.34M | July 29, 2016 |
| Guidance: Projections Coordinate Systems (May 2016) | 0.09M | July 29, 2016 |
| Guidance: Quality Review (May 2016) | 0.17M | July 29, 2016 |
| Guidance: Stakeholder Engagement Data Product Development Phase (May 2016) | 0.26M | August 4, 2016 |
| Guidance: Dam-Specific Non-Regulatory Flood Risk Datasets (May 2016) | 1.29M | |
| Guidance: Flood Insurance Study (FIS) Report (May 2016) | 0.91M | |
| Guidance: Preliminary Distribution and Revised Preliminary (Nov 2015) | 0.45M | December 18, 2015 |
| Guidance: Coastal Wave Setup (Nov 2015) | 0.79M | December 28, 2015 |
| Guidance: Versioning (Nov 2015) | 0.11M | January 5, 2016 |
| Guidance: Appeal and Comment Processing (May 2016) | 0.76M | |
| Guidance: Calculation of Incident Wave Height and Slope for use with TAW Wave Runup Method (May 2015) | 0.10M | July 15, 2015 |
| Guidance: Flood Insurance Study (FIS) Report (Nov 2015) | 0.50M | December 11, 2015 |
| Guidance: First Order Approximation (Nov 2015) | 0.32M | December 11, 2015 |
| Guidance: Extraterritorial Jurisdiction Mapping and Distribution (Nov 2014) | 0.47M | |
| Guidance: Coastal Data Capture (May 2014) | 0.25M | July 30, 2014 |
| Guidance: Coastal-Specific Non-Regulatory Datasets (May 2014) | 0.67M | July 30, 2014 |
| Guidance: Vertical Datum Conversion (May 2014) | 0.33M | July 30, 2014 |
| Guidance: Levee Seclusion (Nov 2014) | 1.26M | January 7, 2015 |
| Guidance: Mapping Base Flood Elevations on Flood Insurance Rate Maps (Nov 2014) | 0.56M | January 7, 2015 |
| Guidance: Metadata (Nov 2014) | 0.20M | January 7, 2015 |
| Guidance: Quality Management (May 2014) | 0.14M | July 30, 2014 |
| Guidance: Flood Depth and Analysis Grids (May 2014) | 2.26M | July 30, 2014 |
| Guidance: Coastal Study Documentation and Intermediate Data Submittals (May 2014) | 0.29M | July 30, 2014 |
| Guidance: Changes Since Last FIRM (May 2014) | 1.12M | July 30, 2014 |
| Guidance: Flood Risk Assessments (May 2014) | 1.35M | July 30, 2014 |
| Guidance: Quality Review (May 2014) | 0.17M | July 30, 2014 |
| Guidance: Coastal Barrier Resources System (CBRS) Mapping on FEMA FIRMs (May 2014) | 0.74M | August 6, 2014 |
| Guidelines and Specifications for Flood Hazard Mapping Partners, Volume 2: Map Revisions and Amendments (Apr 2003) | 5.02M | |
| Guidelines for Coastal Flood Hazard Analysis and Mapping for the Pacific Coast of the United States (Jan 2005) | 6.57M | |
| Policy for Accepting GIS Tools for Flood Hazard Mapping in NFIP (Aug 2001) | 0.58M | |
| Policy for the Use of HEC-RAS in the National Flood Insurance Program (Apr 2001) | 0.55M | |
| Guidelines and Specifications for Flood Hazard Mapping Partners, Appendix F: Guidance for Ice-Jam Analyses and Mapping (Apr 2003) | 1.64M | |
| Guidelines and Specifications for Flood Hazard Mapping Partners, Appendix H: Guidance for Mapping or Areas Protected by Levee Systems (Apr 2003) | 1.81M | |
| Procedure Memorandum 9: Processing of Controlled Correspondence (Jul 2000) | 0.59M | |
| Procedure Memorandum 10: Guidance on the New Fee Charge Structure (Feb 2000) | 0.53M | |
| Procedure Memorandum 17: Direct Deposit Refunds for LOMCs (Dec 2000) | 0.47M | |
| Procedure Memorandum 18: Countywide News Releases (Dec 2000) | 0.51M | |
| Procedure Memorandum 19: MSC Product Naming Conventions (Apr 2002) | 2.92M | |
| Procedure Memorandum 20: Advance Proof Copies of FIRMs (Feb 2001) | 0.54M | |
| Procedure Memorandum 23: Procedures for Making Changes to FEMA Document Control Procedures Manual (Jun 2001) | 0.60M | |
| Procedure Memorandum 24: Unique Identifiers for MCC Products (May 2002) | 0.58M | |
| Procedure Memorandum 29: Maintenance and Control of the Guidelines and Specifications for Flood Hazard Mapping Partners (Dec 2002) | 1.07M | |
| Procedure Memorandum 31: Insert Letters Regarding Retention of Flood Insurance Policies for MT-1 & MT-2 As-Built LOMCs (Mar 2003) | 0.60M | |
| Procedure Memorandum 32: Levee Review Protocol (Jun 2003) | 0.58M | |
| Procedure Memorandum 33: Processing of Letters of Map Change Involving Below-Grade Crawlspaces Constructed Within Identified Special Flood Hazard Areas (Jul 2004) | 0.60M | |
| Procedure Memorandum 34: Interim Guidance for Studies Including Levees (Aug 2005) | 0.89M | |
| Procedure Memorandum 35: Additional Requirements for Inclusion in FY05 Study Contracts (Jul 2005) | 0.54M | |
| Procedure Memorandum 36: Profile Baselines on Digital Flood Insurance Rate Maps (DFIRMs) with Orthophoto Bases (Jul 2005) | 0.57M | |
| Procedure Memorandum 37: Protocol for Atlantic and Gulf Coast Coastal Flood Insurance Studies in FY05 (Aug 2005) | 0.73M | |
| Procedure Memorandum 38: Implementation of Floodplain Boundary Standard (Section 7 of MHIP V1.0) (Jan 2010) | 8.84M | |
| Procedure Memorandum 39: Requirements for Mapping and Review of Coastal Barrier Resources System Boundaries on Flood Insurance Rate Maps (Aug 2007) | 4.55M | |
| Procedure Memorandum 41: North American Vertical Datum of 1988 (NAVD88) Policy | 0.57M | |
| Procedure Memorandum 43: Answers to Questions about Procedure Memorandum No. 43 (Oct 2012) | 0.55M | |
| Procedure Memorandum 43: Guidelines for Identifying Provisionally Accredited Levees (Sept 2006) | 1.11M | |
| Procedure Memorandum 43: Answers to Questions about Procedure Memorandum No. 43 (Jul 2008) | 3.03M | |
| Procedure Memorandum 44: Protocol for Publishing Base Flood Elevation (BFE) Notices on the Web (Mar 2007) | 0.50M | |
| Procedure Memorandum 46: Partial-Countywide Mapping Evaluation (Jun 2008) | 0.49M | |
| Procedure Memorandum 47: Guidance for Determination of the 0.2-Percent-Annual-Chance Wave Envelope along the Atlantic Ocean and Gulf of Mexico Coasts | 1.48M | |
| Procedure Memorandum 48: Protocol for Contractors Who Use and/or Order Paper Flood Insurance Maps and Map Products (Mar 2009) | 0.57M | |
| Procedure Memorandum 50: Policy and Procedures for Identifying and Mapping Areas Subject to Wave Heights Greater than 1.5 feet as an Informational Layer on Flood Insurance Rate Maps (FIRMs) (Dec 2008) | 2.13M | |
| Procedure Memorandum 51: Guidance for Mapping of Non-Levee Embankments Previously Identified as Accredited (Feb 2009) | 2.23M | |
| Procedure Memorandum 52: Guidance for Mapping Processes Associated with Levee Systems (Apr 2009) | 2.24M | |
| Procedure Memorandum 53: Guidance for Notification and Mapping of Expiring Provisionally Accredited Levee Designations - Factsheet (Sept 2009) | 0.53M | |
| Procedure Memorandum 53: Guidance for Notification and Mapping of Expiring Provisionally Accredited Levee Designations (Apr 2009) | 1.25M | |
| Procedure Memorandum 54: Revised Requirements for MSC Deliverables Package (Apr 2010) | 1.26M | |
| Procedure Memorandum 56: Guidelines for Implementation of Coordinated Needs Management Strategy (CNMS) (Jun 2011) | 4.58M | |
| Procedure Memorandum 57: Expanded Appeals Process (EAP) (Nov 2011) | 0.97M | |
| Procedure Memorandum 58: Implementing the Scientific Resolution Panel Process (Nov 2010) | 2.72M | |
| Procedure Memorandum 59: Guidance for Implementation of Watershed-Based Studies (Jul 2010) | 1.12M | |
| Procedure Memorandum 60: Revision to Figure D.2.8-3, Wave Runup Guidance for Vertical Wall, From Shore Protection Manual (USACE, 1984) (Oct 2011) | 0.88M | |
| Procedure Memorandum 61: Standards for Lidar and Other High Quality Digital Topography (Sept 2010) | 0.72M | |
| Procedure Memorandum 62: Technical Support Data Notebook (TSDN) submittal and Flood Elevation Determination Docket (FEDD) File Review Protocol for Mapping Projects (May 2011) | 2.09M | |
| Procedure Memorandum 63: Guidance for Reviewing Levee Accreditation Submittals (Sept 2010) | 0.63M | |
| Procedure Memorandum 64: Compliance with the Endangered Species Act (ESA) for Letters of Map Change (Aug 2010) | 0.63M | |
| Operating Guidance 1-11: Risk MAP Guidance for Incorporating Mitigation Planning Technical Assistance and Training into Flood Risk Projects - Summary (Oct 2012) | 0.08M | |
| Operating Guidance 1-11: Risk MAP Guidance for Incorporating Mitigation Planning Technical Assistance and Training into Flood Risk Projects (Jun 2011) | 0.16M | |
| Operating Guidance 2-11 Operating Guidance for Creation of Risk MAP Products - Summary (Nov 2012) | 0.08M | |
| Operating Guidance 2-11-Operating Guidance for Creation of Risk MAP Products (Oct 2011) | 0.98M | |
| Operating Guidance 3-11: Communicating Flood Risk with Risk MAP Datasets and Products (Jul 2011) | 2.35M | |
| Operating Guidance 3-11: Communicating Flood Risk with Risk MAP Datasets and Products - Summary (Sep 2011) | 0.53M | |
| Operating Guidance 4-11: Risk MAP Meetings Guidance - Summary (Oct 2012) | 0.09M | |
| Operating Guidance 4-11: Risk MAP Meetings Guidance (Jun 2011) | 0.54M | |
| Operating Guidance 6-11: User Guidance for Flood Risk Datasets and Products (Dec 2011) | 1.82M | |
| Operating Guidance 6-11: User Guidance for Flood Risk Datasets and Products - Summary (Dec 2011) | 0.52M | |
| Operating Guidance 7-11: Application of TAW Runup Methodology to FEMA Needs (Oct 2011) | 0.49M | |
| Operating Guidance 7-11: Application of TAW Runup Methodology to FEMA Needs - Summary (Oct 2012) | 0.09M | |
| Operating Guidance 8-12-Joint Probability - Optimal Sampling Method for Tropical Storm Surge Frequency Analysis - Summary (Oct 2012) | 0.08M | |
| Operating Guidance 8-12: Joint Probability - Optimal Sampling Method for Tropical Storm Surge Frequency Analysis (Mar 2012) | 0.37M | |
| Operating Guidance 9-13: Operating Guidance for Designation of Zone VE based on Wave Runup Height (May 2013) | 0.08M | |
| Operating Guidance 10-13: Operating Guidance for Selection of Wave Runup Methods (May 2013) | 0.06M | |
| Operating Guidance 11-13: Operating Guidance for Review of Regulatory Products - Summary (Aug 2013) | 0.15M | |
| Operating Guidance 11-13: Operating Guidance for Review of Regulatory Products (Aug 2013) | 0.37M | |
| Operating Guidance 11-13- Post QR3 Self-Certification (Sample) This is a sample of the Post-QR3 Corrections Confirmation and Self-Certification Form | 0.13M | November 7, 2013 |
| Operating Guidance 11-13- Pre QR3 Self-Certification (Sample) This is a sample of the Pre-QR3 Corrections Confirmation and Self-Certification Form | 0.16M | November 7, 2013 |
| Operating Guidance 12-13: Non-Accredited Levee Analysis and Mapping Guidance (Sept. 2013) (Tables) This spreadsheet contains tables referenced in "Operating Guidance 12-13 Non-Accredited Levee Analysis and Mapping Guidance (Sept. 2013)." | 0.02M | |
| Operating Guidance 12-13: Non-Accredited Levee Analysis and Mapping Guidance (Sept. 2013) | 0.71M | |
| Operating Guidance 13-13: Operating Guidance for Improving the Identification and Mapping of the LiMWA on Regulatory and Non-Regulatory NFIP Products (Oct 2013) | 0.06M | |
| Operating Guidance 14-13: Operating Guidance for Processing Appeals and Revisions to the LiMWA on Regulatory NFIP Products (Oct 2013) | 0.04M | |
| Operating Guidance 15-13: Revised Guidance for Dune Erosion Analysis for the Atlantic Ocean and Gulf of Mexico Coasts (Oct 2013) | 0.08M | |
| Memo: Policy for Accepting Numerical Models for Use in the NFIP (Aug 2004) | 0.49M | |
| Guidelines and Standards for Flood Risk Analysis and Mapping, Appendix N: Flood Risk Data Development (Jan 2012) | 5.54M | |
| Guidelines and Standards for Flood Risk Analysis and Mapping, Appendix O: Format and Standards for Non-Regulatory Flood Risk Products (Jan 2012) (Tables) This spreadsheet contains tables referenced in "Guidelines and Standards for Flood Risk Analysis and Mapping, Appendix O: Format and Standards for Non-Regulatory Flood Risk Products (Jan 2012)." | 0.04M | |
| Guidelines and Standards for Flood Risk Analysis and Mapping, Appendix O: Format and Standards for Non-Regulatory Flood Risk Products (Jan 2012) | 2.88M | |
| Guidelines and Specifications for Flood Hazard Mapping Partners, Volume 1: Flood Studies and Mapping (Apr 2003) | 2.91M | |
| Guidelines and Standards for Flood Risk Analysis and Mapping, Appendix I: Discovery (Jul 2011) | 1.56M | |
| Guidelines and Specifications for Flood Hazard Mapping Partners, Appendix J: Format and Specifications for Flood Insurance Study Report (Apr 2003) | 2.17M | |
| Guidelines and Specifications for Flood Hazard Mapping Partners, Volume 3: Program Support (Apr 2003) | 2.35M | |
| Guidelines and Specifications for Flood Hazard Mapping Partners, Appendix B: Guidance for Converting to the North American Vertical Datum (Apr 2003) | 0.70M | |
| Atlantic Ocean and Gulf of Mexico Coastal Guidelines Update (Feb 2007) | 5.09M | |
| Guidelines and Specifications for Flood Hazard Mapping Partners - Reference Pages (April 2003) | 1.67M | |
| Technical Memorandum: Guidance for Coastal Flood Hazard Analyses and Mapping in Sheltered Waters (Feb 2008) | 0.87M | |
| Guidelines and Specifications for Flood Hazard Mapping Partners, Appendix A: Guidance for Aerial Mapping and Surveying (Apr 2003) | 1.73M | |
| Guidelines and Specifications for Flood Hazard Mapping Partners, Appendix C: Guidance for Riverine Flooding Analyses and Mapping (Nov 2009) | 0.86M | |
| Guidelines and Specifications for Flood Hazard Mapping Partners, Appendix E: Guidance for Shallow Flooding Analyses and Mapping (Feb 2003) | 1.62M | |
| Guidelines and Specifications for Flood Hazard Mapping Partners, Appendix D: Guidance for Coastal Flooding Analyses and Mapping (Apr 2003) | 3.67M | |
| Guidelines and Specifications for Flood Hazard Mapping Partners, Appendix G: Guidance for Alluvial Fan Flooding Analyses and Mapping (Apr 2003) | 0.02G | |