415
Change Order Definitization – REA-167, Revision 0 – Remediation of 100-D-100 Tier 3 |
414
Incremental Base Funding Obligation (FY 2013) - $75,400,000 |
412
Incremental Base Funding Obligation - $2,689,400.98 |
411
Change Order Definitization – REA-184, Revision 0 – 100-D-100 Tier 3 Power Line and Ground Water Well Decommissioning/Replacement |
410
Undefinitized Changed Order – REA-197 –Develop Data Quality Objectives and Sampling and Analysis Plan for Waste Site Nos. 100-K-111 and 100-K-64 - Notice to Proceed with Not-to-Exceed Limit of $100,000 |
409
Undefinitized Changed Order – REA-182 – Remediate Waste Site No. 100-D-104, 100-D Area - Notice to Proceed with Not-to-Exceed Limit of $500,000 |
408
Undefinitized Changed Order – REA-167 – Remediate Waste Site No. 100-D-100, 100-D Area - Notice to Proceed with Not-to-Exceed Limit of $3M |
407
Undefinitized Changed Order – REA-138 – Design Six and Remediate Ten Waste Sites in the 100-H Area - Notice to Proceed with Not-to-Exceed Limit of $1.2M |
406
Revise Contract Section C.5.4, “Project Performance Information and Measurement" |
405
Undefinitized Changed Order – REA-191 – Remediate Eight Waste Sites, Closeout of Three Waste Sites, and Design of One Waste Site in the 100-D Area – Notice to Proceed with Not-to-Exceed Limit of $1M |
404
Incremental Base Funding Obligation - $21,588,847.17 |
403
Reallocation of ARRA Funding |
402
Change Order Definitization – REA-160, Revision 0 – 1724-N Below Grade Demolition |
401
Base Funding Deobligation – ($413,460.80) |
400
Change Order Definitization – REA-183, Revision 0 – Remediation of Waste Site Nos. 600-356, 600-386, and Miscellaneous Restoration of 600-275 |
399
Undefinitized Changed Order – REA-193 – Remediation of Six Waste Sites and Remediation of one Archaeological Site in the 100-N Area – Notice to Proceed with Not-to-Exceed Limit of $1.7M |
398
Update Contract Attachment J-11, RCC Funding Profile |
397
Update Contract Section H, Clause H.25(c), List of Key Personnel |
396
Revisions to Contract Attachment J-1, River Corridor Closure Contract Work Scope |
395
Change Order Definitization – REA-164, Revision 0 – Design of Four, Remediation of Fourteen, and Closeout Sampling of Four 100-N Area Sites |
394
Incorporation of Contract Clause H.31, “National Nuclear Security Administration/Environmental Management Strategic Sourcing Partnership;” Revisions to Contract Attachment J-9, “Service Contract Act and Davis-Bacon Act Wage Determinations;” and Revisions to Contract Clauses H.7(k), “Implementation of the Hanford Site Stabilization Agreement,” Clause H.26, “Responsible Corporate Official,” and Clause I.80,”Submission of Commercial Transportation Bills to the General Services Administration for Audit” |
393
Revisions to Contract Attachment J-6, Advance Agreement, Personnel, and Related Costs |
391
Change Order Definitization – REA-175, Revision 0 – 1900N Below Grade Demolition and Closure |
390
Change Order Definitization – REA-153, Revision 0 – Design of Seven and Remediation of One 100-N Area Sites |
389
Change Order Definitization – REA-162, Revision 0 – Soil Contamination Under 324 Building B-Cell Sump |
388
Change Order Definitization – REA-145, Revision 0 – 105-B Interim Safe Storage |
387
Change Order Definitization – REA-145, Revision 0 – 105-B Interim Safe Storage |
386
Issue Undefinitized Changed Order – REA-193 – Initiate the Procurement Process for Future Remediation of Remaining Waste Sites in the 100-N Area, Hanford Site – Notice to Proceed with Not-to-Exceed Limit of $50K |
385
Issue Undefinitized Changed Order – REA-192 – Exhume Underground Injection Control (UIC) Wells and Remove, Treat, and Dispose Waste Site Nos. 300-284 and 300-32, 300 Area Hanford Site – Notice to Proceed with Not-to-Exceed Limit of $300K |
384
Change Order Definitization – REA-165, Revision 0 – High Energy Real Time Radiography |
383
ARRA Funding Reallocation – Net $0 |
382
Incremental Base Funding Obligation - $50M |
381
Issue Undefinitized Changed Order – REA-167 – Initiate the Procurement Process for Future Remediation of Remaining Waste Sites in the 100-D and 100-H Areas – Notice to Proceed with Not-to-Exceed Limit of $50K |
380
Incremental Base Funding Obligation - $85M |
379
Change Order Definitization – REA-148, Revision 0 – Implementation of Contractor Requirements Document O 458.1, Radiation Protection of the Public and Environment |
378
Extend ARRA Period of Performance through September 30, 2012 |
377
Issue Undefinitized Changed Order – REA-183 – Remediation of 600-356, 600-386, and Miscellaneous Restoration of 600-275 – Notice to Proceed with Not-to-Exceed Limit of $40K |
376
Issue Undefinitized Changed Order – REA-184 – Electrical Design, Power Line Relocation, and Groundwater Well Relocation at Waste Site 100-D-100 – Notice to proceed with not-to-Exceed Limit of $700K |
375
Change Order Definitization – REA-158, Revision 0 – Impacts of Hanford Atomic Metal Trades Council Bump and Roll |
374
Change Order Definitization – REA-151, Revision 0 – Mission Support Alliance Employee Separation Costs |
373
Incorporation of DOE Directives into the WCH Contract |
372
Incremental Base Funding Obligation - FY 2012 - $12,400,000 |
371
Schedule Performance Incentive Fee (SPIF) Revisions to Contract Tables B.1, B.2, C.1, and Attachment J-1 |
370
Change Order Definitization – REA-161, Revision 0 – 100-C-7:1 Power Line Relocation Design and Construction |
369
ARRA Funding Reallocation – Net $0 |
368
Reallocation of Incremental Base Funding Obligation - FY 2012 - $20,000,000 |
367
Incremental Base Funding Obligation - FY 2012 - $20,000,000 |
366
Issue Undefinitized Change Order – REA-164 – Design of Four, Remediation of Fourteen, and Closeout Sampling of Four Waste Sites in the 100-N Area – Notice to Proceed with Not-to-Exceed Limit of $1.3M |
365
Change Order Definitization – REA-144, Revision 0 – Deduct Change Proposal #2 |
364
Change Order Definitization – REA-106, Revision 0 – Descope Confirmatory Work Scope of One Waste Site and Add Remediation of Two Waste Sites in the 100-N Area |
363
Incorporate Contractor Requirements Document O 442.2, “Differing Professional Opinions for Technical Issues Involving Environmental, Safety, and Health Technical Concerns” |
362
Revisions to Contract Table B.5, “Provisional Fee Performance Milestones” (Milestones 27and 28) |
361
Incremental Base Funding Obligation - FY 2012 - $3,800,000 |
360
Incorporate Contractor Requirements Document O 472.2, “Personnel Security,” into Contract |
359
Update Contract Section H, Clause H.25(c), List of Key Personnel |
358
Incremental Base Funding Obligation - $15,000,000 |
357
Base Funding Deobligation of FY 2010 EEOICPA Funds – Net ($4,000) |
356
Incremental Base Funding Obligation - $3,210,252.83 |
355
Change Order Definitization – REA-108, Revision 0 – “Implementation of the Hanford Site Wide Confined Space Program” |
354
Change Order Definitization – REA-086, Revision 0 – “Implementation of the Hanford Site Wide Fall Protection Plan” |
353
Change Order Definitization – REA-118 – “Design of Three and Remediation of Six 100-K Area Sites” |
348
Change Order Definitization – REA-147 – “300 Area Retained Facilities Mitigation Analysis" |
347
Incremental Base Funding Obligation - $24,000,000 |
346
Change Order Definitization – REA-093 – Confirmatory Sampling of 100-D Orphan and Discovery Sites |
345
Incorporate Contractor Requirements Document O 232.2, Supp. Rev. 0, “Occurrence Reporting and Processing of Operations Information,” into Contrac |
344
Incremental Base Funding Obligation - $2,000,000 |
342
Undefinitized Change Order – REA-161 – 100-C-7:1 Power Line Relocation Design and Construction (Increase NTE to $1,087,000) |
341
Incremental Base Funding Obligation - $14,000,000 |
340
Change Order Definitization – REA-143 – ARRA Buyback – ERDF – FY 2012 |
338
ARRA Funding Reallocation – Net $0 |
337
Update Contract Section H, Clause H.25(c), List of Key Personnel |
336
Incremental Base Funding Obligation – Sept/Oct FY 2012 - $20,000,000 |
335
Undefinitized Change Order – REA-106 – Descope and Remediation of 100-N Waste Sites – Notice to Proceed with Not-to-Exceed Limit of $400,000 |
334
Change Order Definitization – REA-142 – ARRA Buyback – ERDF Operations – FY 2011 |
333
Undefinitized Change Order – REA-143 – ARRA Buyback – ERDF Operations – FY 2012 – Increase Not-to-Exceed Limit by $4,000,000 |
332
Change Order Definitization – REA-136 – Cultural Resource Reviews |
331
Undefinitized Change Order – REA-150 – Chronic Beryllium Disease Prevention Program – FY 2012 – Notice to Proceed/Not to Exceed Limit ($320,000) |
330
Change Order Definitization – REA-146 – Remediation of 100-F-64 and 100-F-65 ($232,788) |
329
Issue Undefinitized Change Order – REA-161 – 100 B/C Area Power Line Relocation - NTP/NTE ($100K) |
328
Change Order Definitization – REA-130 – Continued Implementation of Safety, Health, and Security Assessment of Hanford Site Chronic Beryllium Disease Prevention Program ($1,005,510) |
327
Change Order Definitization – REA-126 – Remediation of Two 100-H Area Sites (100-H-28:2 and 100-H-28:4) ($6,426,257) |
326
Update DOE Directives - CRD O 210.2A - "DOE Corporate Operating Experience Program" - CRD O 426.2 (Supp. Rev. 1) - "Personnel Selection, Training, Qualification, and Certification Requirements for DOE Nuclear Facilities" - DOE/RL-2001-36, Revision 1-E, "Hanford Sitewide Transportation Safety Document" |
325
Change Order Definitization – REA-132 – Design of Six 100-IU Sites and Remediation of 24 100-IU Sites ($2,700,000) |
324
Change Order Definitization – REA-115 – 100-D Area Remove, Treat, Dispose for High Priority Chromium Sites and Miscellaneous Sites ($10,832,370) |
323
Issue Undefinitized Change Orders – REA-151–ARRA-Designated Workforce Restructuring Severance Costs–NTP/NTE ($360K) and REA-158-HAMTC “Bump and Roll” Impacts-NTP/NTE ($1.5M) – Extend ARRA Period of Performance through March 31, 2012 |
322
Incremental Base Funding Allocation – $995,192.04 |
321
Incremental Base Funding Allocation – September 2011 - $3,198,747.00 |
320
Undefinitized Change Order – REAs 142 and 143 – ERDF Buyback - Increase Not-to-Exceed Limit by $11,000,000 |
319
Change Order Definitization – REA-134 – Additional Activities to Support the Ongoing Remedial Investigation of Hanford Site Releases to the Columbia River ($215,197) |
318
Change Order Definitization – REA-131 – Coal Ash and Transition Zone Sampling and Remedial Investigation/Feasibility Study Support Activities ($1,679,130) |
317
Undefinitized Change Order – REA-131 – Coal Ash Sampling - Increase Not-to-Exceed Limit by $271,000 (Total NTE $1,216,000) |
316
Change Order Definitization – REA-133 – Design of Twelve and Remediation of Two 100-D Area Sites ($432,784) |
315
Change Order Definitization – REA-127 – Remediation of Four 100-K Area Remove, Treat, and Dispose Sites ($203,809) |
314
Undefinitized Change Order – REA-130 – Continued Support for Resolution of Corrective Actions for Hanford Site Chronic Beryllium Disease Prevention Program - Increase Not-to-Exceed Limit by $275,937 (Total NTE $1,025,937) |
313
Incremental Base Funding Allocation – September 2011 - $22,000,000 |
312
Update Contract Section H, Clause H.25(c), List of Key Personnel |
311
Incremental Base Funding Allocation – August 2011 - $19,000,000 |
310
Revise Schedule Performance Incentive Fee within Contract Table B.1, Incentive Fee Structure |
309
Revise Provisional Fee Performance Milestone No. 25 and Update Contract Table B.5, Provisional Fee Performance Milestones |
308
Change Order No. REA-108 – Implementation of DOE-0360 – Hanford Site Confined Space Procedure – NTE ($100K) |
307
Change Order No. REA-086 – Implementation of DOE-0346 – Hanford Site Fall Protection Program – NTE ($100K) |
306
Incorporate Contractor Requirements Document O 422.1, Supp. Rev. “Conduct of Operations,” into Contract |
305
Incremental Base Funding Allocation – July 2011 - $37,556,000 |
304
ARRA Funding Reallocation – Net $0 |
303
Update Contract Section H, Clause H.25(c), List of Key Personnel |
302
Update Contract Clause I.11a – FAR 52.204-11 – “American Recovery and Reinvestment Act – Reporting Requirements (July 2010)” |
301
DOE Directives Update – Remove CRD O 110.3A (Supp. Rev. 0) - "Conference Management" – Incorporate CRD M 142.2-1 (Supp. Rev. 0) – "Manual for Implementation of the Voluntary Offer Safeguards Agreement and Additional Protocol with the International Atomic Energy Agency;" CRD O 241.1B - "Scientific and Technical Information Management;" CRD O 243.2 (Supp. Rev. 2) - "Vital Records;" and CRD O 420.1B Chg 1 (Supp. Rev. 0) - "Facility Safety" |
300
Update Contract Clause C.2.6 – “Activity 6 – Field Remediation” – Revise Start Date for Remediation of Waste Site 124-N-10 (100-N Sewage Lagoon) |
299
Incremental Base Funding Allocation – May/June 2011 - $23M |
298
ARRA Funding Reallocation – Net $0 |
297
Issue Undefinitized Change Order – REA-146 – Remediation of Two 100-F Waste Sites – NTP/NTE ($100K) |
296
Change Order Definitization – REA-019B – 300 Area Utility Relocation Project – Pipe Bursting ($2,936,142) |
295
Change Order Definitization – REA-092 – Below Grade Demolition for 3701-D Hanford Patrol Headquarters |
294
Change Order Definitization – REA-047 – Remediation of Three 100-D Sites |
293
Base Funding Deobligation – Net ($3.8M) |
292
Issue Undefinitized Change Order – Miscellaneous 100/300/400 Area Deduct |
291
Replaces Mod 290 - Undefinitized Change Order – REA-142 – ARRA Buy Back for ERDF Operations (FY 2011) – NTP/NTE $15,000,000 |
290
Undefinitized Change Order – REA-142 – ARRA Buy Back for ERDF Operations (FY 2011) – NTP/NTE $15,000,000 |
289
Update Contract Section H, Clause H.25(c), List of Key Personnel, to Include Gordon L. Dover as Project Integration Manager |
288
Incorporate Contractor Requirements Document (CRD) O 413.3B, Program and Project Management for the Acquisition of Capital Assets, Replacing CRD O 413.3A, Chg. 1 |
287
Undefinitized Change Order – REA-131 – Coal Ash and Transition Zone Sampling Implementation – Increase Not-to-Exceed Limit by $695,000 (Total NTE $945,000) |
286
Undefinitized Change Order – REA-132 – Remediation of 100-IU Waste Sites – Increase Not-to-Exceed Limit by $1,450,000 (Total NTE $1,500,000) |
285
Incremental Base Funding Allocation – May 2011 - $21,000,000 |
284
ARRA Funding Reallocation – Net $0 |
283
Incremental Base Funding Allocation – April 2011 - $14,088,254 |
282
Change Order Definitization – REA-120 – Implementation of CRD O 426.2, Personnel Selection, Training, Qualification, and Certification Requirements for DOE Nuclear Facilities |
281
Increase ARRA Cost Authority for Program FD0221000 (1111333), Soil and Groundwater (RL1041) – Total Cost Authority (1111333) - $76,754,000 |
280
Change Order Definitization – REA-019A – 300 Area Water Utility Upgrades (GPP2) |
279
Undefinitized Change Order – REA-130 – Continued Support for Resolution of Corrective Actions for Hanford Site Chronic Beryllium Disease Prevention Program – NTP/NTE ($750K) |
278
Undefinitized Change Order – REA-137 – Conduct Bat Habitat Study at 183-B Facility – NTP/NTE ($50K) |
277
Undefinitized Change Order – REA-126 – Remediate Two 100-H Area Waste Sites (100-H-28:2 and 100-H-28:4 – NTP/NTE ($700K) |
276
Undefinitized Change Order – REA-136 – Conduct Cultural Resource Reviews for 132 Waste Sites in 100 and 300 Areas – NTP/NTE ($200K) |
275
Change Order Definitization – REA-121 – Confirmatory Sampling of 300 Area Orphan Sites |
274
Incremental Base Funding Allocation – March 2011 - $11,999,999.50 |
273
Contract Section H – Update Clause H.25(c) – List of Key Personnel |
272
Change Order Definitization – Incorporate 4814 Building into Contract Workscope |
271
Incremental Base Funding Allocation – March 2011 - $19M |
270
Incremental Base Funding Allocation – March 2011 - $3M |
269
Undefinitized Change Order – REA-134 – Columbia River Risk Assessment – Increase in NTE - $190,618 |
268
Incremental Base Funding Allocation – March 2011 - $4M |
267
Change Order Definitization – Approval for Early Release of 320 Building |
266
ARRA Funding Reallocation – Net $0 (Program 1111331 River Corridor) |
265
Change Order Definitization – REA-079 – Remedial Investigation/Feasibility Study Field Investigation and Supplemental Activities |
264
Change Order Definitization – REA-112 – Implementation of Hanford Site Chronic Beryllium Disease Prevention Program |
263
Incremental Base Funding Allocation – February 2011 - $17M |
262
Undefinitized Change Order – REA-115 – Remove, Treat and Disposal for Eight 100-D High Priority Chromium and Miscellaneous Sites – NTP/NTE $5,850,796 |
261
Update Contract Tables B.1, B.2, C.1, and Attachment J-1 as a result of Definitization of REA Nos. 024,054, 056, 097, 073, 062, 112, 079, 121, 019A, 120, 047, 092, 019B, and Mod 272 (4818 Building) |
260
Change Order Definitization – REA-062, Rev. 0 – Prepare Remove, Treat, and Dispose Report for 100-K-84 and Design of 27 Sites at 100-K, 100-H, 100-N, and 300 Area |
259
Change Order Definitization – REA-097 – Executive Order No. 13514, Federal Leadership in Environmental, Energy, and Economic Performance |
258
Change Order Definitization – REA-056 – 183-D Demolition |
257
Undefinitized Change Order – REA-062 – Preparation of RTD Report for 100-K-84 and Design of 27 Sites at 100-K, 100-H, 100-N, and the 300 Area – NTP/NTE $100,000 |
256
Undefinitized Change Order – REA-134 – Columbia River Risk Assessment – NTP/NTE $100,000 |
255
Undefinitized Change Order – REA-079 – Remedial Investigation/Feasibility Study – Increase Total NTE to $15,250,000.00 |
254
Undefinitized Change Order – REA-132 – Remediation of 100-IU Waste Sites - Notice to Proceed with Not-to-Exceed Cost Authority of $50K |
253
Increase ARRA Cost Authority for Program FD0211120 (1111331) River Corridor – Total Cost Authority $156,847,000 and ARRA Funding Reallocation (Net $0) |
252
Incremental Base Funding for January 2011 - $15,000,000.00 |
251
Incremental Base Funding for January 2011 - $20,000,000.00 |
250
Undefinitized Change Order – REA-131 – Implementation of Sampling Analysis Plan for Coal Ash and Step-Out Sampling – NTP/NTE ($250K) |
249
Change Order Definitization – REA-073 – Incorporation of CRD O 200.1A, Information Technology Management |
248
Change Order Definitization – REA-024 – 100/300/400 Area Descope |
247
ARRA Funding Reallocation (Net $0) |
246
Change Order Definitization – REA-054 – Performance Assessment for Environmental Restoration Disposal Facility |
245
Incremental Base Funding for December 2010 - $9,000,000.00 |
244
Update Contract Tables B.1, B.2, C.1, and Attachment J-1 as a result of Definitization of REA Nos. 048, 098, 099, 102, 103, 105, 107, 109, and 111 |
243
Incorporate Hanford Long-Term Stewardship Program Plan (DOE/RL-2010-35, Rev. 0) into Contract |
242
Increase ARRA Cost Authority for Program FD0221000 (1111333), Soil and Groundwater (RL1041) – Total Cost Authority (1111333) - $57,565,500 |
241
ARRA Funding Reallocation (Net $0) - $447,777 |
240
Incremental Base Funding for October/November 2010 - $20,000,000.00 |
239
Change Order Definitization – REA-111– Removal of Two Plutonium Vaults at 600-108 and 600-257 |
238
Change Order Definitization – REA-098 – 100-D Area Remediation of 100-D-8 and 132-D-1 |
237
Change Order Definitization – REA-105 – Removal of Soil Mounds at Waste Site 600-350 |
236
Change Order Definitization – REA-103 – “Completion of 19 Sites at 100-F Area (Initiated under ARRA)" |
235
Undefinitized Change Order - WCH-REA-112 - “Hanford Site CBDPP Corrective Action Plan” – Increased NTE (Total $2,283,000) |
233
Change Order Definitization – REA-107, Rev. 0 – Cost Impacts of 100-B-27 Backfill Delay |
232
Change Order Definitization – REA-109, Rev. 0 – Design Twenty-Two Failed Confirmatory Sites at 100-IU Area |
231
Update Contract Tables B.1, B.2, C.1, and Attachment J-1 as a result of Definitization of WCH-110, Rev. 0), ARRA Phase 3. |
230
Change Order Definitization - WCH-REA-110 – ARRA Phase 3 |
229
Undefinitized Change Order - WCH-REA-112 - “CBDPP Final Corrective Action Plan” – Increased NTE (Total $750K) |
228
Change Order Definitization – REA-102, Revision 0 – Engineering Study for the 600-349-UXO Site |
227
Change Order Definitization – REA-099, Revision 0 – 100-H Area Remediation of 132-H-3 |
226
Transfer of the following 300 Area Facilities from CLIN 2 to CLIN 1: 320, 326, 329, 331C, 331D, 331G, and 331H |
225
Change Order Definitization – REA-048 – “Groundwater Integration” and REA-079 NTP/NTE ($7.5M) |
224
DOE Directives - Incorporate CRD O 425.1D (SR0) – Verification of Readiness to Start Up and Restart Nuclear Facilities; CRD O 460.2A (SR 1) – Dept. Materials Transportation and Packaging Mgmt; DOE/RL-94-02, Rev. 4 – Hanford Emergency Mgmt Plan; DOE/RL-96-68, Rev. 3 – Hanford Analytical Services Quality Assurance Requirements Documents; DOE/RL-2008-17, Rev. 0 – Gable Mountain and Gable Butte Resource Mgmt Plan; and Remove CRD O 471.1A (SR0) – Identification and Protection of Unclassified Controlled Nuclear Information |
223
Incremental Base Funding Obligation for September 2010 – $22,398,000.00 |
222
Update Contract Tables B.1, B.2, C.1, and Attachment J-1 as a result of Definitization of REAs 005R1, 015, 019, 036, 059, 060, 061, 064, 070, 074, 076, 077, 081, 083, and 095 |
221
DOE Directives - Incorporate CRD O 142.3A – Unclassified Foreign Visits and Assignments Program; CRD O 433.1B – Maintenance Mgmt Program for DOE Nuclear Facilities; CRD O 460.1C – Packaging and Transportation Safety; CRD M 470.4-2A (SR0) – Physical Protection, and DOE/RL-2009-89, Rev. 0 – Transportation Hazards Survey and Emergency Planning Hazards Assessment |
220
Change Order Definitization – REA-081, Rev. 0 – Confirmatory Sampling Process for 20 100-N Sites |
219
Change Order Definitization – REA-077, Revision 0 – Environmental Management Primavera Initiative (P6) |
218
Change Order for Completion of Interim Corrective Actions in Response to DOE Office of Health, Safety, and Security Independent Oversight Inspection of the Hanford Site Chronic Beryllium Disease Prevention Program |
217
Incremental ARRA Funding Obligation – ($4,322M) |
216
Incorporate Project Assessment and Reporting System (PARS II) Reporting Requirements into Contract Section C.5.4 |
215
Incremental Base Funding Obligation – $56,791,000 |
214
Increase NTE to $100,000 for Contractor Participation in Site-Wide Safety Programs and Update Contract Section J, Attachment J-15, Site-Wide Safety Programs and Standardized Training |
213
Revise Contract Table B.5, Provisional Fee Performance Milestones (Milestones 21 through 32) |
212
Incorporate CRD O 243.2, Supp. Rev. 0, Vital Records |
211
Incorporate CRDs O 144.1, M 231.1-2 (SR 8), O 350.1 Chg 3, and M470.4-1 Chg 1 (SR 1) |
210
ARRA Funding Deobligation – ($24,335,000.00) |
209
Change Order Definitization – REA-061, Revision 0 – Remediation of 100-H-3 and 100-H-4 Failed Confirmatory Waste Sites |
208
Change Order Definitization – REA-060, Revision 0 – Remediation of 128-H-1 Failed Confirmatory Waste Site |
207
Change Order – Environmental Primavera Initiative (EMPI) – P6 Software Phase II (NTE Increase REA-077) |
206
Incorporation of CRD O 413.3A, Change 1, “Program and Project Management for the Acquisition of Capital Assets” |
205
ARRA Funding Reallocation - Net $0 |
204
Undefinitized Change Order – Removal of two Plutonium Vaults in sites 600-108 and 600-257 (NTP/NTE $173,000) |
203
Incremental Base Funding Obligation - $30,378,211.38 |
202
Change Order Definitization – REA-036, Revision 0 – “Remedial Investigation of Hanford Site Releases to the Columbia River Phase III” |
201
Change Order Definitization – REA-083, Revision 0 – Implementation of CRD O 205.1A Supplemented Rev.4, DOE Cyber Security Management |
200
Undefinitized Change Order – Removal of 100 and 400 Area Buildings from WCH Work scope (Trailer MO-718, Trailer MO-374, 1614-N, 1606-D) |
199
Undefinitized Change Order – ARRA Phase 3 Second Notice to Proceed for Additional Authorized Work Scope (No additional NTE Authorized for ARRA) |
198
Undefinitized Change Order – REA-099, Revision 0 – “Remediation of 132-H-3, 1608-H Effluent Pumping Station Failed Confirmatory Site” (NTP/NTE $874,917) |
197
Undefinitized Change Order – REA-098, Revision 0 – “Remediation of two 100-D Sites” (NTP/NTE $1,950,000) |
196
Change Order – Incorporate DOE-0344, “Hanford Site Excavating, Trenching, and Shoring,” into Contract Attachment J-2 and Rescind NTE of $100K for REA-094 |
195
Change Order Definitization – REA-095, Revision 0 – “Design for Five Failed Confirmatory Sites in 100-K Area” |
194
Undefinitized Change Order – ARRA Phase 3 Notice to Proceed (No additional NTE Authorized for ARRA) |
193
Undefinitized Change Order – REA-081, Revision 0 – “Confirmatory Sampling Process for 20 100-N Sites” (NTP/NTE $759,000) |
192
Incremental ARRA Funding Obligation - $5,383,000 |
191
Change Order – Executive Order 13514 (NTE Increase Mod 177) |
190
Undefinitized Change Order – REA-054 – Performance Assessment for ERDF (NTP/NTE $1M) |
189
Change Order Definitization – REA-074, Revision 0 – “Cost Impact to B Reactor Partial Interim Safe Storage/Hazardous Material Reduction Due to Changed Conditions” |
188
Change Order Definitization – REA-019, Revision 0 – 300 Area Utility Upgrades (Definitization of GPPs 1, 3, 4, 5, and 6; the Mitigation Plan; and “Expense”) |
187
Revision of Provisional Fee Performance Milestone Nos. 19 and 20 (Update of Contract Table B.5) |
186
Update Contract Tables B.2, C.1, and Attachment J-1 as a result of Definitization of WCH-355, Rev. 0), ARRA Phase 2 |
185
WCH-355 Definitization – ARRA Phase 2 |
184
Update Contract Tables B.1, B.2, and Attachment J-1 as a result of Definitization of REAs 021, 042, 050, and 087 |
183
Undefinitized Change Order – Soil Mound Removal Near Old Hanford Townsite (NTP/NTE $50K) |
182
Undefinitized Change Order – WCH-355, ARRA Phase II (Additional NTE $32M) |
181
Change Order Definitization – REA-015, Revision 0 – “Design and Remediation of Three 100 B/C Sites (100-B-20, 100-B-25, and 100-B-28)” |
180
Undefinitized Change Order – REA-094 – Implementation of Hanford Site Wide Excavation, Trenching, and Shoring (NTP/NTE $100K) |
179
Undefinitized Change Order – REA-077 – Environmental Management Primavera Initiative – P6 Software (NTP/NTE $170K) |
178
Change Order Definitization – REA-070, Revision 0 - 100-D Area Remediation No. 2 (Supersedes Modification No. 168) |
177
Change Order – Implement requirements of Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance |
176
Undefinitized Change Order – Implementation of CRD O 200.1A, “Information Technology Management” (NTP/NTE - $222,216) |
175
Incorporate Directives – CRD M 205.1-5 (SR0), CRD M 205.1-6 (SR0), CRD M 205.1-7 (SR0), CRD M 205.1-8 (SR0), CRD O 350.1 (Chg 2), CRD M 470.4-4A, and DOE/RL-2008-17 |
174
ARRA Funding Deobligation - $5,383,000 |
173
Change Order Definitization – REA-076, Revision 0 – Development and Implementation of the US DOE Tribal Use Scenario |
172
Contract Section H – Update Clause H.2(e) - Post-Contract Responsibilities for Pension and Benefit Plans; Incorporate Clause H.14A – Emergency Procedures; Update Clause H.25(c) – List of Key Personnel; Update Clause H.26 – Responsible Corporate Official; and Correct Contract Formatting issues in Clauses H.9, H.35, H.36, H.37 and H.38 |
171
Update Section I, Clause I.117, FAR 52.222-8, Payrolls and Basic Records (Deviation Nov 2009) |
170
Change Order Definitization – REA-064, Revision 0 – 100-D Remediation of Three Failed Confirmatory Sites and Design of Ten Failed Confirmatory Sites |
169
Change Order Definitization – REA-059, Revision 0 – 100H Area Failed Confirmatory Sites for Remedial Design and Remediation |
168
Change Order Definitization – REA-070, Revision 0 - 100-D Area Remediation No. 2 |
167
Change Order Definitization – REA-005, Rev. 1 – Implementation of CRD O 151.1C, Comprehensive Emergency Management System |
166
Incorporate Table B.5, Provisional Fee Performance Milestones (Contract Page B-20) |
165
Incorporate RRD 008, Rev. 2, Quality Assurance Program Requirements |
164
Incremental Base Funding Obligation |
163
Update Contract Tables B.1, B.2, C.1, and Attachment J-1 as a result of Definitization of REAs 022, 023, 025, 032, 041, 043, 045, 051, 052, 066, and 069 |
162
Change Order – REA-036 – Hanford Site Releases to the Columbia River (NTE Increase-$500K) |
161
Change Order – 100-H Area Remediation (NTE Increase REA-061) |
160
Incremental Base Funding Obligation |
159
Change Order – 300 Area Utilities Upgrade (NTE Increase REA-019) |
158
Issue a Change Order – REA-061 – Remediation of two Failed Confirmatory Sites at 100-H Area (NTE/NTP) |
157
Change Order – REA-070 – Remediation of six Failed Confirmatory Sites at 100-D Area (NTE/NTP) |
156
Change Order – REA-083 - CRD O 205.1A, Supp. Rev. 4, DOE Cyber Security Mgmt Program (NTE/NTP) |
155
Incremental Base Funding Obligation |
154
ARRA Phase I (WCH-339, Rev. 1) – Update Table B.2 and Attachment J-1 |
153
Change Order Definitization – REA-042 – Implementation of Chronic Beryllium Disease Prevention Program |
152
Change Order Definitization – REA-087 – Design of 12 100-D Area Failed Confirmatory Sites |
151
Change Order – Incorporate Contract Clause H.38, Project Management Controls |
150
Change Order Definitization – REA-050 - CRD O 450.1A, Supp. Rev. 0, Environmental Protection Program |
149
Change Order Definitization – REA-021 - CRD O 205.1A, Supp. Rev. 1, DOE Cyber Security Mgmt Program |
148
Change Order – Incorporate FAR 52.222-54, Employment Eligibility Verification, Contract Clause I.38.a |
147
Incorporate CRD O 442.1A, Supp. Rev. 2, DOE Employee Concerns Program |
146
Update Section J; Attachments J-7 and J-9 |
145
Incremental Funding – Base |
144
Change Order Definitization – REA-025 – Lockout/Tagout |
143
Change Order Definitization – REA-069 – Implementation of RRD008, Rev. 1 |
142
Change Order Definitization – REA-339 – ARRA Phase I |
141
Change Order Definitization – REA-066 – 100 B/C Design and Remediation - 100-B-31, 100-B-32, and 100-B-33 |
140
Incremental Funding – Base |
139
Incremental Funding - ARRA |
138
Change Order Definitization – REA-045 – 100H Confirmatory Sites |
137
Change Order Definitization – REA-022 – Characterization Activities |
136
Remove Operation and Maintenance of 1904N Sewage Lagoon from Section C, Statement of Work |
135
Key Personnel Change – Clause H.25 |
134
Change Order Definitization – REA-052 – 1902D Water Tower Demolition |
133
Change Order Definitization – REA-032 – 100-F Shoreline Investigation |
132
Change Order Definitization – REA-023 – 100-D Chrome Sites |
131
Funding Reallocation – Net $0 |
130
Change Order Definitization – REA-041 – Initial Characterization and Remedial Design for the 100-D-100 Waste Site |
129
Change Order – Remediation of Three Discovery Sites - 100 B/C Area (NTE Increase REA-066) |
128
Change Order – Remediation of the 128-H-1 Waste Site (NTE Increase REA-060) |
127
Change Order – Remedial Investigation of Hanford Site Releases to the Columbia River (NTE Increase REA-036) |
126
Update Clause H.37 – ARRA Reporting Requirements |
125
Incremental Funding |
124
Change Order Definitization – REA-043 – Mission Support Contract Transition |
123
True-Up of Contract Work Scope Baseline, Replacement of Table J-1 |
122
Change Order – NTP/NTE $1,000,000 – 105B Partial Interim Safe Storage |
121
Directives Changes – CRD O 430.2B, CRD O 450.1A, and RRD008 |
M120
Change – 100-D Failed Confirmatory Sites (NTP/NTE REA-064) |
M119
Change – 183-D Facility Bat Habitat Study (NTP/NTE) |
M118
Change – 618-10 and 618-11 Nonintrusive Characterization Planning (NTE Increase REA-022) |
M117
Change - 100 B/C Orphan Sites Remediation (NTE Increase REA-015) |
A116
Incremental Funding |
M115
Change – 100-H Area Failed Confirmatory Sites (NTE Increase REA-059) |
M114
Change – 100-D-100 Chrome Sites (NTE Increase REA-041) |
M113
Change - Mission Support Contract Transition Activities (NTE REA-043) |
A112
Replacement page J-4 |
M111
Replacement Pages J-2 through J-4 |
A110
Changes - Cost Reimbursement - Alt 1 |
M109
Update to Section H |
A108
Changes - Cost Reimbursement - Alt 1 |
A107
Changes - Cost Reimbursement - Alt 1 |
M106
Update Contract Tables B.2, C.1, and Attachment J-1 as a result of Definitization of REA Nos. 008, 031, 035, and 040 |
A105
Changes - Cost Reimbursement - Alt 1 |
M104
Updated Section H |
A103
Changes - Cost Reimbursement - Alt 1 |
A102
Changes - Cost Reimbursement - Alt 1 |
M101
Changes - Cost Reimbursement - Alt 1 |
A100
Changes - Cost Reimbursement - Alt 1 |
A099
Changes - Cost Reimbursement - Alt 1 |
A098
UniLateral Mod. Contract Paragraph B.2, Obligation and Availability of Funds |
A097
Changes - Cost Reimbursement - Alt 1 |
A096
UniLateral Mod. Contract Paragraph B.2, Obligation and Availability of Funds |
A095
Changes - Cost Reimbursement - Alt 1 |
M094
Replacement page H-19 |
A093
Changes - Cost Reimbursement - Alt 1 |
A092
Bi-Lateral Mod. Contract Paragraph B.2, Obligation and Availability of Funds |
A091
Bi-Lateral Mod. Contract Paragraph B.2, Obligation and Availability of Funds |
A090
Changes - Cost Reimbursement - Alt 1 |
A089
Bi-Lateral Mod. Contract Paragraph B.2, Obligation and Availability of Funds |
A088
Bi-Lateral Mod. Contract Paragraph B.2, Obligation and Availability of Funds |
A087
Changes - Cost Reimbursement - Alt 1 |
A086
Bi-Lateral Mod. Contract Paragraph B.2, Obligation and Availability of Funds |
A085
Changes - Cost Reimbursement - Alt 1 |
A084
WCH to discontinue all work associated with RL letter 09-AMRC-0033 |
A083
Bi-Lateral Mod. Contract Paragraph B.2, Obligation and Availability of Funds |
M082
Updated Section H. Replacement pages included. |
A081
Incremental Base Funding Obligation |
A080
Changes to 52.243-2 Cost Reimbursement |
A079
Changes to 52.243-2 - Cost Reimbursement |
A078
Chanes Clause of contract and negotiated agreement of parties |
A077
Changes Clause of contract and negotiated agreement of parties |
M076
Changes Clause 52.244-2 Section I Subcontracts |
A075
Obligation and availability of funds is increased in clause B.2. B-2 is provided. |
A074
Changes 52.243-2 with Cost Reimbursement. |
M073
Replacement Pages J-2 through J-4 and Pages H-19 through H-20. |
A072
Obligation and availability of funds is increased in clause B.2. B-2 is provided. |
A071
Changes 52.243-2 with Cost Reimbursement. |
A070
Obligation and availability of funds is increased in clause B.2. B-2 is provided. |
A069
Changes 52.243-2 with Cost Reimbursement. |
A068
Obligation and availability of funds is increased in clause B.2. B-2 is provided. |
M067
Replacement page H-19. |
A066
Changes 52.243-2 with Cost Reimbursement. |
A065
Obligation and availability of funds is increased in clause B.2. B-2 is provided. |
A064
Obligation and availability of funds is increased in clause B.2. B-2 is provided. |
A063
Obligation and availability of funds is increased in clause B.2. B-2 is provided. |
A062
Changes 52.243-2 with Cost Reimbursement. |
A061
Obligation and availability of funds is increased in clause B.2. B-2 is provided. |
M060
Replacement table and replacement Section J.J-1 provided. |
M059
Replacement Page J-17. |
A058
Obligation and availability of funds is increased in clause B.2. B-2 is provided. |
A057
Obligation and availability of funds is increased in clause B.2. B-2 is provided. |
M056
Replacement Pages J-2 through J-4 and Page H.19. |
A055
Obligation and availability of funds is increased in clause B.2. B-2 is provided. |
A054
Obligation and availability of funds is increased in clause B.2. B-2 is provided. |
A053
Obligation and availability of funds is increased in clause B.2. B-2 is provided. |
A052
Obligation and availability of funds is increased in clause B.2. B-2 is provided. |
A051
Obligation and availability of funds is increased in clause B.2. B-2 is provided. |
A050
Obligation and availability of funds is increased in clause B.2. B-2 is provided. |
A049
Obligation and availability of funds is increased in clause B.2. B-2 is provided. |
A048
Obligation and availability of funds is increased in clause B.2. B-2 is provided. Also update to section I. |
A047
Obligation and availability of funds is increased in clause B.2. B-2 is provided. |
A046
Obligation and availability of funds is increased in clause B.2. B-2 is provided. |
M045
Update contract clause H25. Replacement page H-19 is provided. |
M043
Replacement Pages J-2 through J-4. |
A044
Obligation and availability of funds is increased in clause B.2. B-2 is provided. |
A042
Obligation and availability of funds is increased in clause B.2. B-2 is provided. |
A041
Obligation and availability of funds is increased in clause B.2. B-2 is provided. |
A040
Obligation and availability of funds is increased in clause B.2. B-2 is provided. |
A039
Obligation and availability of funds is increased in clause B.2. B-2 is provided. |
M038
Update Attachment I - 3 |
A036
Clause B.2 obligation notice of funds increase H.26 changed to correct name and address. |
M035
Update replaced Section C and Section H |
M034
DOE directives applicable to river corridor closure contract section J-2 |
A033
Obligation and availability of funds is increased in clause B.2. B-2 is provided. Banking agreement at attachment J7 is replaced also. |
M032
Miscellaneous updates and directives changes. |
A031
Obligation and availability of funds is increased in clause B.2. B-2 is provided. |
A029
Obligation and availability of funds, is increased by $40,000,000.00 from $198,749,070.38 to $238,749,070.38 |
A028
Obligation and availability of funds is increased in clause B.2. B-2 is provided. |
A027
Contract section C is revised (from Mod M021) to include orphan and confirmatory language. Sections C-13 to C-34 included. |
A026
Obligation and availability of funds is increased in clause B.2. B-2 is provided. |
A025
Obligation and availability of funds is increased in clause B.2. B-2 is provided. |
A024
Obligation and availability of funds is increased in clause B.2. B-2 is provided. |
A023
Obligation Notice |
A022
Obligation Notice |
M021
This document modifies A, B, C, D, E, F, G, and H. |
A020
Obligation Notice |
A019
Obligation Notice |
M018
Updates to Directives, Wage Determinations, & misc. clauses |
A017
Obligation Notice |
A016
Obligation Notice |
M014
Miscellaneous Updates and Directives Changes (453 KB) |
A013
Obligation Notice |
A012
Obligation Notice |
A011
Obligation Notice |
A010
Obligation Notice (pdf: 209kb) |
A009
Obligation Notice (pdf: 367kb) |
M008
Section H changes and incorporation of J-6 (PDF: 809kb) |
M007
Update Attachment J-1 (PDF: 477kb) |
A006
Obligation Notice (PDF: 91kb) |
M005
Replace Attachment J-7, Special Financial Institution Account Agreement (PDF: 456kb) |
M004
Changes to Section C and Attachment J-1 (PDF: 499kb) |
M003
Clause H.2 revision (PDF: 102kb) |
A002
Obligation and Miscellaneous Updates (PDF: 3mb) |
M001
Miscellaneous updates (PDF: 7.5mb) |