Date |
Location |
Description |
09/23/2008 |
Amargosa Valley, NV |
Overview of NRC's licensing process for Yucca Mountain: Judging the Safety of a High-Level Waste Repository.
|
04/17/2008 |
Las Vegas, NV |
NRC’s Licensing Process: Judging the Safety of a Potential High-Level Waste Repository - 2008 Update Workshop for Affected Units of Local and Tribal Government
|
6/19-20/2007 |
Las Vegas, NV |
NRC’s Hearing Process: Judging the Safety of a Potential High-Level Waste Repository - 2007 - Update. 2nd Workshop for Affected Units of Local Government.
|
10/26/2005
|
Tecopa, CA
|
Public meeting to provide an overview of the NRC’s independent oversight function and its role in regulating a possible repository for high-level radioactive waste disposal and a discussion of NRC’s role in the shipment and transportation of waste.
|
08/26/2004 |
Las Vegas, NV |
Information Workshop with Affected Units of Local Government, "Judging the Safety of a Potential High-Level Waste Repository," to discuss NRC's Licensing and Hearing Processes
|
05/23/2002 |
Las Vegas, NV |
Public meeting to engage the public in a discussion of the Yucca
Mountain Review Plan, NUREG-1804, Revision 2 Draft Report for comment
|
05/23/2001 |
Las Vegas, NV |
Public Meeting to Discuss the Hearing Process for Judging the Safety
of a Potential Repository
|
05/22/2001 |
Pahrump, NV |
Public Meeting to Discuss the Hearing Process for Judging the Safety
of a Potential Repository
|
05/22/2002 |
Las Vegas, NV |
Public meeting to engage the public in a discussion of the Yucca
Mountain Review Plan, NUREG-1804, Revision 2 Draft Report for comment
|
05/21/2002 |
Pahrump, NV |
Public meeting to engage the public in a discussion of the Yucca
Mountain Review Plan, NUREG-1804, Revision 2 Draft Report for comment
|
05/04/2000 |
Las Vegas, NV |
Information Workshop on NRC's Licensing process for a high-level
waste repository at Yucca Mountain, NV
|
05/04/2000 |
Pahrump, NV |
Public Meeting to acquaint the public with NRC's high-level waste
licensing process
|
04/08-10/2002 |
Beatty, Tonopah & Ely, NV |
Public Meetings to present an Overview of Activities Related to
the Potential High-Level Waste Repository at Yucca Mountain
|
11/02/1999 |
Las Vegas, NV |
Public Meeting - A Roundtable Discussion on Defense-in-Depth as
Applied to a possible High-Level Waste Repository at Yucca Mountain,
NV
|
06/16/1999 |
Las Vegas, NV |
Public Meeting to Discuss Proposed Regulations (10 CFR Part 63)
for a High-Level Waste Repository at Yucca Mountain, NV
|
06/15/1999 |
Amargosa Valley, NV |
Public Meeting to Discuss Proposed Regulations (10 CFR Part 63)
for a High-Level Waste Repository at Yucca Mountain, NV
|
03/25/1999 |
Beatty, NV |
Public Meeting to Discuss Proposed 10 CFR Part 63 High-Level Waste Licensing Standards
|
03/23/1999 |
Las Vegas, NV |
Public Meeting to Discuss Proposed 10 CFR Part 63 High-Level Waste
Licensing Standards
|
Date |
Meeting Purpose |
NRC/DOE Agreements |
04/03-04/2008 |
NRC/DOE Technical Exchange on Total System Performance Assessment
|
N/A |
04/02/2008 |
NRC/DOE Technical Exchange on Infiltration
|
N/A |
09/13/2007 |
NRC/DOE Technical Exchange and Management Meeting on Licensing Process Topic
|
N/A |
08/16/2007 |
NRC/DOE Technical Exchange on Criticality
|
N/A |
06/28/2007 |
NRC/DOE Technical Exchange on Physical Protection, Material Control & Accounting, and Emergency Planning
|
N/A |
06/26/2007 |
NRC/DOE Technical Exchange on Quality Assurance
|
N/A |
05/30/2007 |
NRC/DOE Technical Exchange on Preclosure Facility Layout and Operations
|
N/A |
11/7-9/2006 |
NRC/DOE Technical Exchange on Preclosure Topics
| N/A |
10/24-25/2006 |
NRC/DOE Technical Exchange on Total System Performance Assessment
|
N/A |
08/29/2006 |
NRC/DOE Technical Exchange on Design Changes Approved through DOE’s Critical Decision-1 (CD-1) Process |
N/A |
06/07/2006 |
NRC/DOE Technical Exchange and Management Meeting Seismic Design Methodology and Performance Demonstration
|
N/A |
05/16-17/2006 |
NRC/DOE Technical Exchange and Management Meeting on Preclosure Safety Analysis and Supporting Information
|
N/A |
07/20/2005 |
NRC/DOE Technical Exchange on Information to Support 10 CFR Part 63 Analyses
|
N/A |
06/01/2005 |
Interim Summary of the NRC/DOE Technical Exchange on Preclosure
Interaction Plans and Aircraft Hazards (includes Agenda, Attendees,
and Presentations)
|
N/A |
05/19/2005 |
Technical Exchange on Yucca Mountain Project Performance
Indicators and Safety Conscious Work Environment
|
N/A |
02/10/2005 |
Discuss Quality Assurance Requirements and Description
- Revision 17
|
N/A |
9/14-15/2004 |
To discuss the geologic repository operations area design and the preclosure safety analysis for surface and subsurface facilities
|
N/A |
05/12/2004 |
To discuss DOE's methodology for identifying structures, systems,
and components (SSCs) Important to Safety
|
N/A |
05/05/2004 |
To discuss the results of NRC Staff Evaluation of DOE Analysis
Model Reports, Process Controls, and Corrective Actions
|
N/A |
05/03/2004 |
To discuss DOE's Performance Indicator
|
N/A |
02/25/2004 |
To discuss NRC's requirements for physical protection and materials
control and accounting for the proposed geologic high-level waste
repository at Yucca Mountain
|
N/A |
02/03/2004 |
To discuss the content of DOE's proposed license application for
a geologic repository at Yucca Mountain, Nevada, and NRC's risk-informed
approach for review of the license application
|
N/A |
09/30/2003 |
Discuss DOE's plan for the identification and estimation of aircraft
hazards of the proposed license application for a high-level waste
geologic repository at Yucca Mountain, NV
|
N/A |
09/23/2003 |
To discuss DOE's revised integrated and systematic strategy for
resolution of KTI agreements
|
N/A |
07/01/2003 |
To discuss NRC's response to DOE's Igneous Consequences Peer Review
Report
|
N/A |
06/04-05/2003 |
To discuss (1) the current scope of waste package design information
in the license application, (2) application of the American Society
of Mechanical Engineers Boiler and Pressure Vessel Code to the waste
package design, (3) status of ongoing work to resolve Key Technical
Issues, and (4) an update on postclosure seismic evaluations as it
applies to the proposed geological repository at Yucca Mountain,
|
N/A |
05/15/2003 |
To discuss DOE's current approach on the use of risk information
to resolve Key Technical Issue Agreements as it applies to the proposed
geological repository at Yucca Mountain
|
N/A |
05/06-08/2003 |
1. To review and discuss the geological rock properties testing and
modeling work conducted in the past year aimed at resolution of RDTME
agreement items.
2. To receive NRC feedback on DOE's resolution strategy and adequacy
of data and modeling conducted thus far.
3. To define the path forward on any remaining information needs prior to a License Application
submittal.
|
|
03/05-06/2003 |
To discuss DOE's current approach to the disposal of the DOE owned
spent nuclear fuel as it applies to the proposed geologic repository
at Yucca Mountain
|
N/A |
02/26/2003 |
To discuss DOE's strategy to develop its Performance Confirmation
Plan
|
N/A |
12/10/2002 |
To discuss electronic submissions related to the potential of proceedings
for the proposed geologic repository at Yucca Mountain
|
N/A |
11/05-06/2002 |
To discuss a potential phased approach to the repository design,
DOE document hierarchy, and license application design products
|
N/A |
07/23/2002 |
To discuss KTI agreements DOE plans to address FY 03-05 (All KTIs)
|
N/A |
06/25-26/2002 |
To discuss electronic submissions related to the potential of proceedings
for the proposed geologic repository at Yucca Mountain
|
N/A |
04/25-26/2002 |
To discuss resolution of open issues related to Pre-Closure Safety
|
N/A |
04/15-16/2002 |
To discuss KTI agreements DOE plans to address in FY02 (All KTIs)
|
|
02/05/2002 |
To discuss future issue resolution meetings (All KTIs)
|
N/A |
09/18-19/2001 |
To discuss resolution of issues related to Range of Thermal Operating
Temperatures (All KTIs)
|
|
09/05/2001 |
To discuss resolution of open issues related to Igneous Activity
(KTI 1)
|
|
08/06-10/2001 |
To discuss resolution of open issues related to Total
System Performance Assessment and Integration (KTI 9)
|
|
08/02/2001 |
To discuss resolution of issues related to Range of Thermal Operating
Temperatures (All KTIs)
|
N/A |
07/24-26/2001 |
To discuss resolution of open issues related to Pre-Closure Safety
|
|
06/21-22/2001 |
To discuss resolution of open issues related to Igneous Activity
(KTI 1)
|
|
05/15-17/2001 |
To discuss resolution of open issues related to Total System Performance
Assessment and Integration (KTI 9)
|
|
02/06-08/2001 |
To discuss resolution of open issues related to Repository Design
and Thermal-Mechanical Effects (KTI 6)
|
|
01/23/2001 |
To discuss DOE's results of its total system performance assessment
|
N/A |
01/09-12/2001 |
To discuss resolution of open issues related to the Evolution of
the Near-Field Environment (KTI 3)
|
|
01/08-09/2001 |
To discuss resolution of open issues related to the Thermal Effects
on Flow (KTI 5)
|
|
12/05-07/2000 |
To discuss resolution of open issues related to Radionuclide Transport
(KTI 8)
|
|
10/31-11/02/2000 |
To discuss resolution of open issues relating to the saturated zone
for the Unsaturated and Saturated Flow Under Isothermal Conditions
(KTI 7)
|
|
10/23-24/2000 |
To discuss resolution of open issues related to the Criticality
in the Container Life and Source Term, Evolution of the Near-Field
Geochemical Environment, and Radionuclide Transport (KTI 3, 4, and
8)
|
|
10/11-13/2000 |
To discuss resolution of open issues related to the Structural Deformation
and Seismicity (KTI 2)
|
|
09/12-13/2000 |
To discuss resolution of open issues related to the Container Life
and Source Term (KTI 4)
|
|
08/29-31/2000 |
To discuss resolution of open issues related to the Igneous Activity
(KTI 1)
|
|
08/16-17/2000 |
To discuss resolution of open issues relating to the unsaturated
zone for the Unsaturated and Saturated Flow Under Isothermal Conditions
(KTI 7)
|
|
06/06-07/2000 |
To discuss the integration of the individual process models within
the Total System Performance Assessment (TSPA) and to discuss further
the NRC's issues and resolution |
N/A |
Date |
Description |
NRC/DOE Agreements |
03/25/2008 |
NRC/DOE Quarterly Management Meeting
|
N/A |
12/19/2007 |
NRC/DOE Quarterly Management Meeting
|
N/A |
09/25/2007 |
NRC/DOE Quarterly Management Meeting
|
N/A |
06/14/2007 |
NRC/DOE Quarterly Management Meeting
|
N/A |
03/27/2007 |
NRC/DOE Quarterly Management Meeting
|
N/A |
12/07/2006
|
NRC/DOE Quarterly Management Meeting
|
N/A |
09/12/2006
|
Management Meeting
|
N/A |
06/06/2006
|
Management Meeting
|
N/A |
03/21/2006
|
Management Meeting
|
|
12/07/2005 |
Management Meeting
|
|
09/15/2005 |
Management Meeting
|
|
06/06/2005 |
Management Meeting
|
|
02/17/2005 |
Management Meeting
|
|
11/22/2004 |
Management Meeting
|
|
09/29/2004 |
Quality Assurance Meeting
|
|
08/19/2004 |
Management Meeting
|
|
05/11/2004 |
Management Meeting
|
|
05/04/2004 |
Quality Assurance Meeting
|
|
02/19/2004 |
Management Meeting
|
|
02/18/2004 |
Quality Assurance Meeting
|
|
11/13/2003 |
Management Meeting
|
|
11/12/2003 |
Quality Assurance Meeting
|
|
07/16/2003 |
Management Meeting
|
|
07/15/2003 |
Quality Assurance Meeting
|
|
04/30/2003 |
Management Meeting
|
|
04/29/2003 |
Quality Assurance Meeting
|
|
01/23/2003 |
Management Meeting
|
|
01/22/2003 |
Quality Assurance Meeting
|
|
10/17/2002 |
Management Meeting
|
|
10/16/2002 |
Quality Assurance Meeting
|
|
07/31/2002 |
Quality Assurance and Management Meetings between NRC and DOE
|
|
07/30/2002 |
Quality Assurance Meeting
|
|
04/19/2002 |
Management Meeting
|
|
04/18/2002 |
Quality Assurance
|
|
12/06/2001 |
Management Meeting
|
|
12/05/2001 |
Quality Assurance and Key Technical Issue Status
|
|
09/07/2001 |
Management Meeting
|
|
09/06/2001 |
Quality Assurance and Key Technical Issue Status
|
|