Combined License Applications for New Reactors
Location of Projected New Nuclear Power Reactors
Applications Received
Bell Bend Unit 1
Bellefonte Units 3 & 4
Callaway Unit 2
Calvert Cliffs Unit 3
Comanche Peak Units 3 & 4
Fermi Unit 3
Grand Gulf Unit 3
Levy County Units 1 & 2
Nine Mile Point Unit 3
North Anna Unit 3
River Bend Station Unit 3
Shearon Harris Units 2 & 3
South Texas Project Units 3 & 4
Victoria County Station Units 1 & 2
Virgil C. Summer Units 2 & 3
Vogtle Units 3 & 4
William States Lee III Units 1 & 2

Victoria County Station, Units 1 and 2 Application

Victoria County Station
Who:   Exelon Nuclear Texas Holdings, LLC (Exelon)

What:   Application for a combined license (COL) for two Economic Simplified Boiling Water Reactors (ESBWR) designated as Victoria County Station, Units 1 and 2

When:   September 3, 2008 (date of application submittal)

Where:   Exelon's Victoria County Station site near Victoria City in Victoria County, Texas

On this page:

Some links on this page are to documents in our our Agencywide Documents Access and Management System (ADAMS). For additional information, see our Plugins, Viewers, and Other Tools.

Reference Documents

To top of page

Applicant Documents

Some combined license applications were submitted with hyperlinks to various reference documents. Currently, the hyperlinks in those applications are not active. These hyperlinks represent an advanced feature that could be activated when the agency upgrades to web-based ADAMS, at which point these applications and documents such as the Design Control Documents would be linked together. In the interim, and for those applications that do not have the hyperlink feature, the reference documents may be viewed under the Reference Documents section of the combined license application page. In addition, DVDs of the various documents are available by contacting the Public Document Room staff.

Date Description
12/16/08 Submittal of Additional Environmental Data in Support of Combined License Application for Victoria County Station, Units 1 and 2
11/24/08 Notification to Designate Alternate Reactor Technology for Combined License Application for Victoria County Station, Units 1 and 2
11/13/08 Submittal of Additional Environmental Data in Support of Combined License Application
10/24/08 Additional Information - Conceptual Temporary Dewatering Plan in Support of Combined License Application
10/16/08 Submittal of Additional Geological Data and Environmental Monitoring Status Update in Support of Combined License Application
09/23/08 Submittal of Meteorological Data in Support of Combined License Application
09/02/08 Exelon transmittal letter for Victoria County Station COLA
  • Part 1 - General and Administrative Information
  • Part 2 - Final Safety Analysis Report (FSAR)
  • Part 3 - Environmental Report
  • Part 4 - Technical Specifications
  • Part 5 - Emergency Plan
  • Part 6 - [Part not used in this application]
  • Part 7 - Departures (Variances, Supplemental Information) from the ESBWR Design Control Document (DCD)
  • Part 8 - [This Part contains safeguards information which is with-held from public availability]
  • Part 9 - [This Part contains other information which is with-held from public availability]
  • Part 10 - Tier 1/Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC)
  • Part 11- Enclosures

To top of page

Application Review Schedule

Key Milestones Completion Date
Actual - A
Target - T
Application Tendered 09/03/08 - A
Acceptance Review
Acceptance Review Start
09/04/08 - A
Docketing Decision Letter Issued/Acceptance Review Complete
10/30/08 - A
Review Schedule Established/Schedule Letter Issued to Applicant
01/12/09 - T
Safety Review
Phase 1 - Requests for Additional Information (RAIs) Issued to Applicant
 
Phase 2 - SER with Open Items issued
 
Phase 3 - ACRS Review of SER with Open Items Complete
 
Phase 4 - Advanced SER with no Open Items Issued
 
Phase 5 - ACRS Review of SER with no Open Items Complete
 
Phase 6 - Final SER Issued
 
Environmental Review
Phase 1 - Environmental impact statement (EIS) summary report issued
 
Phase 2 - Draft EIS issued to EPA
 
Phase 3 - Response to public comments on draft EIS issued
 
Phase 4 - Final EIS issued to EPA
 
Hearing
Commission or ASLB hold mandatory hearing
 
License
Commission decision on issuance of COL application
 

Information on Federal Register notices for receipt of the application and opportunity to request a hearing or petition to intervene can be found on the Hearing Opportunities page.

To top of page

NRC Documents

Date Description
12/18/08 Staff Review of the Combined License Application for Victoria County Station, Units 1 and 2
10/30/08 Letter of Acceptance for Docketing of the Exelon Application for a Combined License for Victoria County Station, Units 1 and 2 and Associated Federal Register Notice
10/24/08 Additional Information - Conceptual Temporary Dewatering Plan in Support of Combined License Application for Victoria County Station, Units 1 and 2
09/24/08 Acknowledgement of Receipt of the Combined License Application for Victoria County Station, Units 1 and 2 and Federal Register Notice

To top of page

Requests for Additional Information

Category RAI Date RAI Letter No. and Subject Applicant Response
Applicant RAI Evaluation 11/20/08 Applicability Evaluation of North Anna Unit 3 (R-COLA) Responses to NRC Requests for Additional Information (RAIs) NA
Safety   None issued  
Environmental   None issued  

To top of page

Public Meetings

Date Description
09/24/08 COLA Orientation/Technical Content Meeting
08/07/08 Public Outreach Meeting

To top of page

Contacts

Contacts for the Victoria County Station COL Application