Home > Nuclear Reactors > New Reactors > Combined License Applications
> Bell Bend Nuclear Power Plant Application
Bell Bend Nuclear Power Plant Application
|
Who: |
PPL Bell Bend, LLC
|
What: |
Application for a combined license (COL) for an AREVA U.S. Evolutionary Power Reactor (U.S. EPR) designated as the Bell Bend Nuclear Power Plant Unit 1
|
When: |
October 10, 2008 (date of application submittal)
|
Where: |
New Site adjacent to PPL's Susquehanna Steam Electric Station, Luzerne County, PA. |
|
On this page:
Some links on this page are to documents in our our Agencywide Documents Access and Management System (ADAMS). For additional information, see our Plugins, Viewers, and Other Tools.
Reference Documents
Applicant Documents
Some combined license applications were submitted with hyperlinks to various reference documents. Currently, the hyperlinks in those applications are not active. These hyperlinks represent an advanced feature that could be activated when the agency upgrades to web-based ADAMS, at which point these applications and documents such as the Design Control Documents would be linked together. In the interim, and for those applications that do not have the hyperlink feature, the reference documents may be viewed under the Reference Documents section of the combined license application page. In addition, DVDs of the various documents are available by contacting the Public Document Room staff.
Date |
Description |
10/10/08 |
PPL Bell Bend, LLC's transmittal letter for Bell Bend Nuclear Power Plant COLA
- Part 1 - General Information
- Part 2 - Final Safety Analysis Report (FSAR)
- Part 3 - Environmental Report
- Part 4 - Technical Specifications
- Part 5 - Emergency Plan
- Part 6 - Limited Work Authorization
- Part 7 - Departures and Exemption Requests
- Part 8 - Security Plan
- Part 9 - Sensitive Information [This Part contains safeguards information which is with-held from public availability]
- Part 10 - Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC)
- Part 11A - Quality Assurance Program Description (QAPD)
- Part 11B - AREVA Design Control Document
- Part 11C - AREVA DCD Supplements
- Part 11D - NEI References
- Part 11E - Fuel Rack Supplements
- Part 11F - Boring Logs
- Part 11G - Seismic Refraction
- Part 11H - Wetlands Delineation Report
- Part 11I - Cultural Resources
- Part 11J - Terrestrial Ecology
- Part 11K - Aquatic Ecology
- Part 11L - Noise Studies
- Part 11M - Traffic Impact Studies
|
Application Review Schedule
Key Milestones |
Completion Date Actual - A Target - T |
Application Tendered |
10/10/08 - A |
Acceptance Review |
Acceptance Review Start |
10/14/08 - A |
Docketing Decision Letter Issued/Acceptance Review Complete |
12/15/08 - T |
Review Schedule Established/Schedule Letter Issued to Applicant |
TBD |
Safety Review |
Phase 1 - Requests for Additional Information (RAIs) Issued to Applicant |
|
Phase 2 - SER with Open Items issued |
|
Phase 3 - ACRS Review of SER with Open Items Complete |
|
Phase 4 - Advanced SER with no Open Items Issued |
|
Phase 5 - ACRS Review of SER with no Open Items Complete |
|
Phase 6 - Final SER Issued |
|
Environmental Review |
Phase 1 - Environmental impact statement (EIS) summary report issued |
|
Phase 2 - Draft EIS issued to EPA |
|
Phase 3 - Response to public comments on draft EIS issued |
|
Phase 4 - Final EIS issued to EPA |
|
Hearing |
Commission or ASLB hold mandatory hearing |
|
License |
Commission decision on issuance of COL application |
|
Information on Federal Register notices for receipt of the application and opportunity to request a hearing or petition to intervene can be found on the Hearing Opportunities page.
NRC Documents
Date |
Description |
12/30/08 |
Notice of Intent To Prepare an Environmental Impact Statement and Conduct Scoping Process
|
11/05/08 |
Acknowledgement of Receipt of Application
|
Public Meetings
Date |
Description |
01/29/09 |
Environmental Scoping Process
|
11/20/08 |
Public Meeting with PPL Bell Bend LLC to discuss issues regarding application submittal
|
Contacts
Contacts for the Bell Bend COL Application |
Safety Project Manager |
Michael Canova |
Environmental Project Manager |
Stacey Imboden |
Contact a Public Affairs Officer |
|