Combined License Applications for New Reactors
Location of Projected New Nuclear Power Reactors
Applications Received
Bell Bend Unit 1
Bellefonte Units 3 & 4
Callaway Unit 2
Calvert Cliffs Unit 3
Comanche Peak Units 3 & 4
Fermi Unit 3
Grand Gulf Unit 3
Levy County Units 1 & 2
Nine Mile Point Unit 3
North Anna Unit 3
River Bend Station Unit 3
Shearon Harris Units 2 & 3
South Texas Project Units 3 & 4
Victoria County Station Units 1 & 2
Virgil C. Summer Units 2 & 3
Vogtle Units 3 & 4
William States Lee III Units 1 & 2

William States Lee III Nuclear Site, Units 1 and 2 Application

William States Lee III Nuclear Site
Who:   Duke Energy

What:   Application for a combined license (COL) for two Westinghouse Advance Passive 1000 (AP1000) Pressurized Water Reactors (PWRs) designated as Lee Nuclear Station Units 1 & 2

When:   December 13, 2007 (date of application submittal)

Where:   Duke's Lee site near Charlotte in Cherokee County, South Carolina

On this page:

Some links on this page are to documents in our our Agencywide Documents Access and Management System (ADAMS). For additional information, see our Plugins, Viewers, and Other Tools.

Reference Documents

To top of page

Applicant Documents

Some combined license applications were submitted with hyperlinks to various reference documents. Currently, the hyperlinks in those applications are not active. These hyperlinks represent an advanced feature that could be activated when the agency upgrades to web-based ADAMS, at which point these applications and documents such as the Design Control Documents would be linked together. In the interim, and for those applications that do not have the hyperlink feature, the reference documents may be viewed under the Reference Documents section of the combined license application page. In addition, DVDs of the various documents are available by contacting the Public Document Room staff.

Date Description
12/12/07 Duke transmittal letter for Lee Nuclear Station Units 1 & 2 COLA
  • Part 0 - Cover Letter, Affidavits, etc
  • Part 1 - Administrative and Financial Information
  • Part 2 - Final Safety Analysis Report (FSAR)
  • Part 3 - Environmental Report
  • Part 4 - Technical Specifications
  • Part 5 - Emergency Plan
  • Part 6 - [Not used. Reserved for applicants requesting Limited Work Authorization (LWA)]
  • Part 7 - Departures and Exemption Requests
  • Part 8 - [This Part contains safeguards information which is withheld from public availability]
  • Part 9 - [This Part contains other information which is withheld from public availability]
  • Part 10 - License Conditions and Inspection, Tests, Analyses and Acceptance Criteria (ITAAC)
  • Part 11 - Enclosures

To top of page

Application Review Schedule

Key Milestones Completion Date
Actual - A
Target - T
Application Tendered 12/13/07 - A
Acceptance Review
Acceptance Review Start
01/02/08 - A
Docketing Decision Letter Issued/Acceptance Review Complete
02/25/08 - A
Review Schedule Established/Schedule Letter Issued to Applicant
04/02/08 - A
Safety Review
Phase 1 - Requests for Additional Information (RAIs) Issued to Applicant
02/05/09 - T
Phase 2 - SER with Open Items issued
10/08/09 - T
Phase 3 - ACRS Review of SER with Open Items Complete
01/10 - T
Phase 4 - Advanced SER with no Open Items Issued
09/10 - T
Phase 5 - ACRS Review of SER with no Open Items Complete
12/10 - T
Phase 6 - Final SER Issued
02/11 - T
Environmental Review
Phase 1 - Environmental impact statement (EIS) summary report issued
09/11/08 - A
Phase 2 - Draft EIS issued to EPA
03/18/09 - T
Phase 3 - Response to public comments on draft EIS issued
08/19/09 - T
Phase 4 - Final EIS issued to EPA
03/10 - T
Hearing
Commission or ASLB hold mandatory hearing
 
License
Commission decision on issuance of COL application
 

Information on Federal Register notices for receipt of the application and opportunity to request a hearing or petition to intervene can be found on the Hearing Opportunities page.

To top of page

NRC Documents

Date Description
09/11/08 Environmental Scoping Summary Report
04/22/08 Notice of Hearing and Opportunity to Petition for Leave to Intervene and Order
04/02/08 William States Lee III Nuclear Station Units 1 and 2 Combined License Application Review Schedule
03/20/08 Notice of Intent To Prepare an Environmental Impact Statement and Conduct Scoping Process
02/25/08 Notification of Docketing and Federal Register Notice
01/08/08 Acknowledgement of Receipt of Application and Federal Register Notice

To top of page

Requests for Additional Information

Category RAI Date RAI Letter No. and Subject Applicant Response
Safety 08/06/08 RAI Letter No. 01 SRP Section 8.2 09/05/08
08/11/08 RAI Letter No. 02 SRP Section 10.04.05 09/10/08
08/11/08 RAI Letter No. 03 SRP Section 10.04.05 09/10/08
08/14/08 RAI Letter No. 04 SRP Section 7.5 09/11/08
08/27/08 RAI Letter No. 05 SRP Section 8.2 09/26/08
08/18/08 RAI Letter No. 06 SRP Section 10.04.06 09/17/08
08/25/08 RAI Letter No. 07 SRP Section 1.9 09/17/08
08/28/08 RAI Letter No. 08 SRP Section 9.2.1 09/26/08
08/28/08 RAI Letter No. 09 SRP Section 9.5.1 09/19/08
09/11/08 RAI Letter No. 10 SRP Section 2.3 10/10/08
09/12/08 RAI Letter No. 11 SRP Section 2.3.2  
09/12/08 RAI Letter No. 12 SRP Section 2.3.4 12/04/08 - Non-Public
12/04/08
10/10/08
09/16/08 RAI Letter No. 13 SRP Section 11.02 12/11/08 - Non-Public
09/17/08 RAI Letter No. 14 SRP Section 11.03 11/11/08
10/17/08
09/18/08 RAI Letter No. 15 SRP Section 08.02 10/17/08
09/19/08 RAI Letter No. 16 SRP Section 2.4.13  
09/19/08 RAI Letter No. 17 SRP Section 02.04.12 12/11/08 - Non-Public
11/25/08 - Non-Public
10/27/08
09/19/08 RAI Letter No. 18 SRP Section 19 10/17/08
09/19/08 RAI Letter No. 19 SRP Section 6.4 12/23/08 - Non-Public
10/27/08 - Partial Response
09/19/08 RAI Letter No. 20 SRP Section 03.02.01 10/17/08
09/19/08 RAI Letter No. 21 SRP Section 09.05.02 10/28/08
09/19/08 RAI Letter No. 22 SRP Section 09.02.01 10/28/08
09/19/08 RAI Letter No. 23 SRP Section 02.03.01 10/31/08
09/26/08 RAI Letter No. 24 SRP Section 12.03 - 12.04 12/04/08
09/25/08 RAI Letter No. 25 SRP Section 13.03 12/23/08 - Non-Public
12/17/08 - Non-Public
12/09/08
11/20/08
11/11/08
11/07/08
10/03/08 RAI Letter No. 26 SRP Section 02.05.03 12/03/08
10/03/08 RAI Letter No. 27 SRP Section 2.5.2 10/11/08
10/03/08 RAI Letter No. 28 SRP Section 02.04.01 11/18/08
10/03/08 RAI Letter No. 29 SRP Section 13.01.01 11/07/08
10/03/08 RAI Letter No. 30 SRP Section 13.01.01 11/25/08 - Partial Response
11/18/08 - Partial Response
10/03/08 RAI Letter No. 31 SRP Section 13.1.2, 13.1.3 11/04/08
10/05/08 RAI Letter No. 32 SRP Section 2.5.2  
10/05/08 RAI Letter No. 33 SRP Section 2.4.13  
10/05/08 RAI Letter No. 34 SRP Section 2.4.13 12/03/08
10/30/08 RAI Letter No. 35 SRP Section 02.03.02 11/25/08
10/06/08 RAI Letter No. 36 SRP Section 02.02.01 & 02.02.02 11/07/08 - Non-Public
10/06/08 RAI Letter No. 37 SRP Section 17.5 12/11/08 - Non-Public
11/04/08 RAI Letter No. 38 SRP Section 9.2.2 11/24/08
10/17/08 RAI Letter No. 39 SRP Section 15.00.03 11/25/08
10/20/08 RAI Letter No. 40 SRP Section 02.03.05 12/17/08 - Non-Public
10/21/08 RAI Letter No. 41 SRP Section 3.07, 3.08 12/17/08 - Non-Public
10/22/08 RAI Letter No. 42 SRP Section 01 12/03/08
10/23/08 RAI Letter No. 43 SRP Section 02.02.03 12/23/08 - Non-Public
12/23/08 - Non-Public
10/22/08 RAI Letter No. 44 SRP Section 02.05.04 11/24/08 - Non-Public
10/23/08 RAI Letter No. 45 SRP Section 02.02.03 11/24/08
10/31/08 RAI Letter No. 46 SRP Section 03.02.02 11/20/08
11/05/08 RAI Letter No. 47 SRP Section 02.03.03  
11/07/08 RAI Letter No. 49 SRP Section 02.05.02 12/03/08
12/23/08 RAI Letter No. 50 SRP Section 02.05.02  
10/05/08 RAI Letter No. 52 SRP Section  
11/12/08 RAI Letter No. 53 SRP Section 02.02.01 11/20/08
11/12/08 RAI Letter No. 55 SRP Section 02.05.02  
12/08/08 RAI Letter No. 57 SRP Section 12/17/08 - Non-Public
Environmental 08/21/08 RAI Letter Regarding the Environmental Review of the Combined License Application 11/25/08
11/24/08
11/20/08
11/12/08
10/28/08
10/17/08
10/17/08
10/17/08 - Non-Public
10/10/08 - Non-Public

To top of page

Public Meetings

Date Description
05/01/08 Scoping Meeting
03/19/08 Duke Energy Lee Combined License Schedule Discussion
08/30/07 Public Outreach

To top of page

Contacts

Contacts for the William States Lee III Nuclear Site COL Application
Safety Project Manager Brian Hughes
Environmental Project Manager Linda Tello