Home > Nuclear Reactors > New Reactors > Design Certification Applications > ESBWR
Design Certification Application Review -
Economic Simplified Boiling-Water Reactor (ESBWR)
The Economic Simplified Boiling-Water Reactor (ESBWR) is a 4,500-MWt
reactor, which uses natural circulation for normal operation and has passive
safety features. GE-Hitachi Nuclear Energy (GEH) submitted an application for final design approval and standard design certification for the ESBWR
on August
24, 2005. By letter dated December
1, 2005, the U.S. Nuclear Regulatory Commission (NRC) accepted the application for docketing, and assigned Docket No.
52-010. For additional information, please use the Advanced Web Search feature of our Agencywide Documents Access and Management System (ADAMS), and enter 05200010 in the "Docket Number" field to
search for documents related to the ESBWR design certification application.
For additional detail, see the following topics on this page:
Some links on this page are to documents in our Agencywide
Documents Access and Management System (ADAMS), and others are to
documents in Adobe Portable Document Format (PDF). ADAMS documents are
provided in either PDF or Tagged Image File Format (TIFF). To obtain free
viewers for displaying these formats, see our Plugins,
Viewers, and Other Tools page. If you have questions about search
techniques or problems with viewing or printing documents from ADAMS,
please contact the Public Document Room
staff.
Design Certification Review
On June 1, 2008, GEH submitted Revision 5 of the ESBWR DCD. Revision 3 of the ESBWR Probabilistic Risk Assessment (PRA) is also publicly available. See NEDO-33201, Revision 3.
Application Review Schedule
The staff's review schedule for the ESBWR Design Certification was provided to GEH on November 27, 2007. On February 20, 2008, GEH updated its schedule for submittal of Revision 5 of the ESBWR DCD, and GEH subsequently submitted DCD Revision 5 on June 1, 2008.
GEH also submitted letters dated July 7, 2008, September 17, 2008, November 4, 2008, and December 1, 2008, updating their schedule for responding to staff requests for additional information and for submittal of revisions to Topical Reports currently under staff review in support of the design certification. The staff is currently re-evaluating its review schedule based on this information.
Key Milestones |
Completion Date Actual - A Target - T |
Application |
Received design certification application |
08/24/05 - A |
|
Acceptance Review |
Federal Register Notice (FRN) published for receipt and availability |
09/28/05 - A |
FRN published announcing acceptance |
12/09/05 - A |
Review schedule published |
|
|
Review |
Advanced SER with no Open Items issued to ACRS |
|
Response to ACRS regarding SER with no Open Items issued |
|
Final SER issued |
|
|
Rulemaking |
Issue proposed rule |
|
Issue final draft rule |
|
Issue final rule |
|
Pre-Application Review
On April 18, 2002, GEH requested a pre-application review of the ESBWR design.
Since that time, the staff completed its review of the application of
the TRAC-G thermal hydraulic code to ESBWR
loss-of-coolant accidents. The staff is currently reviewing the application
of the TRAC-G code for ESBWR anticipated operational occurrences (AOOs)
and thermal-hydraulic stability. These
reviews will be completed as part of the design certification review. For additional information, please use the Advanced Web Search feature of our Agencywide Documents Access and Management System (ADAMS), and enter proj0717 in the "Docket Number" field to
search for documents related to the ESBWR design certification application.
Contacts
|