Document number |
File Type |
Description |
Date |
SECY-02-0225 |
|
|
Proposed Criteria for the Treatment of Individual Requirements in
a Regulatory Analysis |
03/21/2003 |
SECY-02-0221 |
|
|
Final Rule to Standardize the Process for Allowing a Licensee to
Release Part of Its Reactor Facility or Site for Unrestricted Use
Before NRC Has Approved Its License Termination Plan |
03/07/2003 |
SECY-02-0216 |
|
|
Proposed Process for Providing Information on Significant Nuclear
Materials Issues and Adverse Licensee Performance |
02/25/2003 |
SECY-02-0214 |
|
|
Guidance on the Use of Effective Dose Equivalent in External Dose
Assessments |
01/22/2003 |
SECY-02-0204 |
|
|
Update of Uranium Recovery Guidance Documents |
05/07/2003 |
SECY-02-0199 |
|
|
Denial of Petition for Rulemaking to Use Information from Prior
Licensing Actions as Resolved Information for Early Site Permit and
Combined License Applications (PRM-52-1) |
05/07/2002 |
SECY-02-0196 |
|
|
Recommendations Stemming from the Systematic Assessment of Exemptions
from Licensing in 10 CFR parts 30 and 40; and a Rulemaking Plan for
Risk-informing 10 CFR Parts 30, 31, and 32 |
11/17/2003 |
SECY-02-0194 |
|
|
Options for Addressing Part 35 Training and Experience Issues Associated
With Recognition of Specialty Boards by NRC |
02/12/2003 |
SECY-02-0191 |
|
|
Status of the Entombment Option for Power Reactors |
11/26/2002 |
SECY-02-0182 |
|
|
Briefing on EEO Program |
11/07/2002 |
SECY-02-0180 |
|
|
Legal and Financial Policy Issues Associated with Licensing New
Nuclear Power Plants |
|
SECY-02-0179 |
|
|
Final Rule: Material Control and Accounting Amendments |
12/03/2002 |
SECY-02-0176 |
|
|
Proposed Rulemaking to Add New Section 10 CFR 50.69, "Risk-Informed
Categorization and Treatment of Structures, Systems, and Components"
(WITS 199900061) |
03/28/2003 |
SECY-02-0175 |
|
|
Denial of Petition for Rulemaking to Eliminate Review of Alternative
Sites, Alternative Energy Sources and Need for Power in Nuclear Power
Reactor Siting and Licensing Reviews (PRM-52-2) |
05/07/2003 |
SECY-02-0169 |
|
|
Briefing on Decommissioning Activities and Status |
10/16/2002 |
SECY-02-0166 |
|
|
Policy Options and Recommendations for Revising the NRC's Process
for Handling Discrimination Issues |
03/26/2003 |
SECY-02-0138 |
|
|
Denial of Petition for Rulemaking on Mandatory Submittal of Performance
Indicator Information Needed for the Reactor Oversight Process (PRM-50-72) |
08/13/2002 |
SECY-02-0135 |
|
|
Proposed Rule: 10 CFR Parts 63: Specification of a Probability for
Unlikely Features, Events, and Processes |
09/04/2002 |
SECY-02-0133 |
|
|
Control of Solid Materials: Options and Recommendations for Proceeding |
10/25/2002 |
SECY-02-0132 |
|
|
Proposed Rule: Revision of 10 CFR 50.48 to Permit Light-Water Reactors
to Voluntarily Adopt National Fire Protection Association (NFPA) Standard
805, " Performance-Based Standard for Fire Protection for Light-Water
Reactor Electric Generating Plants, 2001 Edition" (NFPA 805)
as an Alternative Set of Risk-Informed, Performance-Based Fire Protection
Requirements (WITS 199900032) |
10/03/2002 |
SECY-02-0127 |
|
|
Proposed Response to State of Ohio on Its Assured Isolation Storage
Facility Draft Rules |
09/05/2002 |
SECY-02-0122 |
|
|
Staff Review Guidance for Gaseous Diffusion Plant Changes in Ownership
or Control |
09/10/2002 |
SECY-02-0116 |
|
|
Proposed Rule: 10 CFR Parts 30, 40, and 70: Financial Assurance
Amendments for Materials Licensees |
08/27/2002 |
SECY-02-0112 |
|
|
NRC Review of Idaho National Engineering and Environmental Laboratory
Draft Incidental Waste (Waste Incidental to Reprocessing) Determination
for Sodium-bearing Waste |
07/26/2002 |
SECY-02-0111 |
|
|
Proposed Rule to Amend 10 CFR Part 35 to Require Licensees to Notify
NRC or an Individual Receiving a Dose Exceeding 50 Millisieverts (5
REM) From a Patient Released Under 10 CFR 35.75 |
08/27/2002 |
SECY-02-0107 |
|
|
Addendum to SECY-02-0074: "National Materials Program: Pilot
Projects" |
08/20/2002 |
SECY-02-0096 |
|
|
Direct Final Rule on Electronic Maintenance and Submission of Information |
07/23/2002 |
SECY-02-0095 |
|
|
Applicability of Section 11e.(2) of the Atomic Energy Act to Material
at the Sequoyah Fuels Corporation Uranium Conversion Facility |
07/25/2002 |
SECY-02-0090 |
|
|
Proposed Regulatory Framework and Cost Estimates for U.S. Nuclear
Regulatory Commission Regulation of Nuclear Safety at the U.S. Department
of Energy's Non-Defense Science Laboratories |
06/28/2002 |
SECY-02-0089 |
|
|
Revised Draft Nureg-1633 and Public Information Brochure on Potassium
Iodide (KI) For the General Public |
11/26/2002 |
SECY-02-0088 |
|
|
Turkey Point Nuclear Plants, Units 3 and 4, Renewal of Full-Power
Operating Licenses |
06/05/2002 |
SECY-02-0084 |
|
|
Final Rule on Decommissioning Trust Provisions |
11/21/2002 |
SECY-02-0081 |
|
|
Staff Activities Related to the NRC Goal of Reducing Unnecessary
Regulatory Burden on Power Reactor Licensees |
06/25/2002 |
SECY-02-0080 |
|
|
Proposed RulemakingRisk-Informed 10 CFR 50.44 "Combustible
Gas Control In Containment" (WITS 20010003) |
06/27/2002 |
SECY-02-0077 |
|
|
Proposed Rule to Update 10 CFR 52, "Early Site Permits, Standard
Design Certifications, and Combined Licenses for Nuclear Power Plants" |
05/06/2003 |
SECY-02-0068 |
|
|
Proposed Rule on Financial Information Requirements for Applications
to Renew or Extend the Term of an Operating License for a Power Reactor |
05/10/2002 |
SECY-02-0067 |
|
|
Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) for
Operational Programs (Programmatic
ITAAC) |
09/11/2002 |
SECY-02-0060 |
|
|
Proposed Policy on Enhancing Public Participation in NRC Meeting |
05/08/2002 |
SECY-02-0057 |
|
|
Update to Secy-01-0133, "Fourth Status Report on Study of Risk-informed
Changes to the Technical Requirements of 10 CFR Part 50 (Option 3)
and Recommendations on Risk-informed Changes to 10 CFR 50.46 (ECCS
Acceptance Criteria)" |
03/31/2003 |
SECY-02-0044 |
|
|
Annual Status Report for FY 2001 on the Administration of the NRC's
Requalification Program and the Results of Initial Operator Licensing
Examinations (WITS 198800098) |
04/03/2002 |
SECY-02-0043 |
|
|
Proposed Rule: Geological and Seismological Characteristics for
the Siting and Design of Dry Cask Independent Spent Fuel Storage Installations
and Monitored Retrievable Storage Installations - 10 CFR Part 72 |
06/18/2002 |
SECY-02-0033 |
|
|
Amergen's Request to Consolidate the Clinton Power Station Emergency
Operations Facility (EOF) into the Centralized EOF Operated by Exelon
Generation Co. |
03/15/2002 |
SECY-02-0032 |
|
|
Report to Congress on Abnormal Occurrences for Fiscal Year 2001 |
03/27/2002 |
SECY-02-0023A |
|
|
Addendum to SECY-02-0023: Proposed Revision to the Enforcement Policy
to Include an Interim Policy Regarding Enforcement Discretion for
Fitness-For-Duty Issues and Status of Rulemaking Effort |
10/04/2002 |
SECY-02-0023 |
|
|
Proposed Revision to the Enforcement Policy to Include an Interim
Policy Regarding Enforcement Discretion for Fitness-For-Duty Issues
and Status of Rulemaking Effort |
10/04/2002 |
SECY-02-0021 |
|
|
Final Rule on Revision of the Skin Dose Limit, 10 CFR Part 20 |
03/20/2002 |
SECY-02-0002 |
|
|
Revision of Gaseous Diffusion Plant Recertification Standard Review
Plan Chapter on Foreign Ownership and Financial Requirements |
02/21/2002 |