October 4, 2002
MEMORANDUM TO: |
William D. Travers
Executive Director for Operations |
FROM: |
Annette L. Vietti-Cook, Secretary /RA/ |
SUBJECT: |
STAFF REQUIREMENTS - SECY-02-0023 and SECY-02-0023A - PROPOSED REVISION
TO THE ENFORCEMENT POLICY TO INCLUDE AN INTERIM POLICY REGARDING ENFORCEMENT
DISCRETION FOR FITNESS-FOR-DUTY ISSUES. |
The Commission has approved the staff's plan to publish a Federal
Register notice announcing the revision to the enforcement policy
and implement the proposed fitness-for-duty enforcement discretion subject
to the comments and changes noted below and in the attachment.
|
(EDO) |
(SECY Suspense: 10/25/02) |
The staff should ensure that programmatic violations of the requirements
of Part 26 by one licensee are communicated to other licensees so that
any necessary follow-up action may be taken by licensees who have taken
credit for the Part 26 program of the licensee in violation.
The staff should keep the Commission informed on significant FFD matters
including those associated with the FFD rulemaking effort.
cc: |
Chairman Meserve
Commissioner Dicus
Commissioner Diaz
Commissioner McGaffigan
Commissioner Merrifield
OGC
CFO
OCA
OIG
OPA
Office Directors, Regions, ACRS, ACNW, ASLBP (via E-Mail)
PDR |
Attachment
Changes to the Federal Register notice in SECY-02-0023A
-
On page 2, last paragraph, delete the 2nd sentence (After
consideration of ... December 4, 2000.) Revise line 4 to read ' ...
(OMB) to publish a the affirmed final
rule, stakeholders expressed a number of concerns about the rule
and its implementation.' Delete lines 5 through 7 and up to
the period in line 8 (stakeholders objected and expressed ... their
concerns.) Revise lines 8 through 10 to read ' ... concerns, the NRC
considered several options and concluded on
in the Commission's Staff Requirements Memorandum, dated
October 3, 2001, that it ....' In line 11, delete "several".
-
On page 4, 1st full paragraph, revise line 3 to read '
... Plant Personnel." NRC Regulatory Guide ....'
-
On page 4, last paragraph, revise line 11 to read ' ... tested again
pursuant to §26.24(a)(1) before authorization ....'
-
On page 5, revise line 2 from the top to read ' ... FFD regulations
have the potential to may be interpreted
as ....' Revise line 4 from the top to read ' ... and reinstatements
similar to those that are found in the
....'
-
On page 5, last paragraph, revise line 4 from the bottom to read
' ... particularly especially burdensome
regarding to contractor/vendor (C/V) personnel ....'
Revise line 2 from the bottom to read ' ... employees (see NRC
Information Notice ....'
-
On page 6, paragraph 1, revise line 2 to read ' ... business practices
to more efficiently use its workforce more efficiently.'
-
On page 6, paragraph 2, revise line 7 to read ' ... documented
in known to the FFD program, if that ....'
-
On page 6, last paragraph, revise line 4 to read ' ... expertise
and to staff up for outages, the ....' Revise line
5 to read ' ... who work solely only in
the nuclear ....'
-
On page 7, 1st full paragraph, revise line 2 to read '
... site-specific FFD programs , and would
share ....'
-
On page 8, revise line 8 from the top to read ' ... differ, licensees
believed maintained that it was ....'
-
On page 8, last paragraph, revise lines 3 and 4 to read ' ... 30-day
period. Specifically, That is, until a
final rule that would address this issue became effective, under
this interim enforcement policy, the following approach would
be taken under an interim enforcement policy: The NRC ....'
-
On page 10, 1st full paragraph, revise line 1 to read
'For these reasons, in In SECY-01-0134,
the staff proposed, the following interim enforcement policy:
that the The NRC normally would ....'
-
On page 11, item (1), revise line 1 to read ' ... proposed approach
enforcement discretion policy does not adequately
....' In item (2), line 1, remove the quotation marks.
-
On page 11, last paragraph, revise lines 5 through 7 to read ' ...
substance abuse problems and persons with substance abuse
problems are potentially more vulnerable to influence attempts than
persons without such problems. Therefore, in order to ....'
-
On page 12, revise line 1 from the top to read ' ... necessary (with
the one exception noted ....'
-
On page 12, 1st full paragraph, delete the sentence in
lines 6 and 7 (This is a very different ... previously discussed.)
-
On page 12, last paragraph, revise the last line to read ' ... years
is redundant and unnecessary.'
-
On page 17, paragraph 1, line 2, insert a comma after "less". Revise
lines 6 and 7 read ' ... consistency with the § 26.24(a)(1)
requirement that licensees ....' In line 11, provide the ADAMS accession
number for the document. Delete the last sentence (The NRC's goal
is to have ... closely aligned.)
-
On page 17, revise line 1 to read 'This revised enforcement
discretion ....' Revise line 2 to read ' ... proposed in SECY-01-0134.
Specifically, this This policy: ' Revise
item (2) to read 'Provides greater alignment the
maximum match between the interim ....'
-
On page 18, item (4), remove the quotation marks. Revise item (6)
to read 'Minimizes the unnecessary burden of Eliminates
redundant regulatory ....' In item (7), revise line 2 to read ' ...
has been interrupted for up from 1 day
to 60 ....'
-
On page 19, 1st full paragraph (after the numbered items),
revise lines 1 through 3 to read ' ... conclusion, based on
the judgment that these practices provide adequate safety,
the NRC believes that the practices included in this considers
the risk associated with issuing an interim enforcement policy
will ensure adequate protection of public health and safety and
nuclear security to authorize the use in suitable cases
of enforcement discretion pending rulemaking to be insignificant.'
-
On page 23, paragraph 2, item (1), revise line 2 to read ' ... disqualifying
information; unless the individual was subject to a licensee-approved
behavioral observation and arrest-reporting program throughout the
period of interruption; and'
|