MEMORANDUM FOR: |
William D. Travers
Executive Director for Operations |
FROM: |
Annette L. Vietti-Cook, Secretary /RA/ |
SUBJECT: |
STAFF REQUIREMENTS - AFFIRMATION SESSION, 10:30 A.M., FRIDAY, MARCH
7, 2003, COMMISSIONERS' CONFERENCE ROOM, ONE WHITE FLINT NORTH, ROCKVILLE,
MARYLAND (OPEN TO PUBLIC ATTENDANCE) |
I. SECY-02-0221 - Final Rule to Standardize the Process for Allowing
a Licensee to Release Part of its Reactor Facility or Site for Unrestricted
Use Before NRC Has Approved its License Termination Plan
The Commission(1) approved a final rule
amending 10 CFR Parts 2, 20, and 50 to standardize the process for allowing
a power reactor licensee to release part of its facility or site for unrestricted
use before the NRC approves the license termination plan. The rule also
clarifies that the radiological criteria for unrestricted use in 10 CFR
Part 20 apply to a partial site release.
Following incorporation of the attached changes, the Federal Register
notice should be reviewed by the Rules Review and Directives Branch in
the Office of Administration and forwarded to the Office of the Secretary
for signature and publication.
|
(EDO) |
(SECY Suspense: 4/25/03) |
Attachment: As stated
cc: |
Chairman Meserve
Commissioner Dicus
Commissioner Diaz
Commissioner McGaffigan
Commissioner Merrifield
EDO
OGC
CFO
OCAA
OCA
OIG
OPA
Office Directors, Regions, ACRS, ACNW, ASLBP (via E-Mail)
PDR |
Attachment
Changes to the Federal Register Notice in SECY-02-0221
-
On page 2, last paragraph, line 2, replace "to" with "of".
-
On page 3, 2nd full paragraph, revise lines 2 and 3 to
read ' ... site for unrestricted use or require a licensee
to obtain NRC approval of a partial site release.' Revise
line 4 to read ' ... requirement to meet guidance
as to the release criteria ....'
-
On page 3, last paragraph, revise line 4 to read ' ... license termination,
this rule provides that the LTP must ....'
-
On page 4, last paragraph, revise lines 1 and 2 to read 'The
strategy for developing t This rulemaking is
applicable was to narrow its applicability
to power reactor licensees in order to be responsive to
current industry needs, while also ....'
-
On page 5, 1st full paragraph, revise line 5 to read '
... these cases, because as ....' Revise
line 13 to read ' ... adequately justified. If should
NRC should determine that ....' Revise line 14 to read
' ... are needed, such surveys and sampling would be ....'
-
On page 10, item 1. comment, revise lines 6 and 7 to read ' ... option
to effectively use property , which
that does not directly ....'
-
On page 12, last paragraph, revise lines 4 and 5 to read ' ... criteria.
Rather, for purposes of partial site release, the focus is on
it is clarified that the relevant site area to be considered
in demonstrating compliance with 10 CFR 20, Subpart E, is
the ....'
-
On page 14, item 4. comment, revise line 3 to read ' ... with 10
CFR Part 20 ....' Revise line 7 to read ' ... outside the
scope of the EPA's limits under ....' Revise
line 8 to read '... 40 CFR Part 190 ....' In line 11, replace
"to" with "on" in both places.
-
On page 14, last paragraph, revise line 3 to read ' ... use in 10
CFR Part 20, ....'
-
On page 15, 1st full paragraph, line 5, insert a comma
after "Consideration". In line 11, insert a period after "standards"
and correct the spelling of "previously". In line 16, replace the
comma with a period.
-
On page 16, revise line 1 from the top to read ' ... material released
at the time from an operating ....' Revise line 2
to read ' ... reinterpret 40 CFR Part ....' In line 3,
insert a comma after "(d)". Revise line 7 to read ' ... final rulemaking
arise from the voluntary action of the licensee to seek partial
site release are voluntary and thus
do not ....'
-
On page 17, revise line 2 from the top to read ' ... released, it
is no longer ....' Revise line 5 to read ' ... within the
scope of the EPA's regulations at 40 CFR ....'
Revise line 10 to read ' ... if the EPA regulations had
....' Revise line 11 to read ' ... component, i.e., they were
it was intended to ....' Revise line 12 to read '
... regulations contains no temporal limitation
and simply states that the ....' Revise line 16 to
read ' ... their the total contribution
must be ....'
-
On pages 18 - 20, determine whether item 5. constitutes a criterion
or criteria.
-
On page 23, 1st full paragraph, revise line 3 to read
' ... criterion of 10 CFR Part 20, ....' Revise line 9
to read ' ... authority or a court of ....'
-
On page 24, 1st full paragraph, revise lines 2 and 3 to
read ' ... Commission has approved the development of a proposed
rule to address the is currently re-examining its approach
for control of solid ....'
-
On page 24, item 8. comment, revise line 1 to read ' ... commented
that, after once the Commission ....'
-
On page 24, item 8. response, paragraph 1, revise line 6 to read
' ... stating that these provisions are this criteria
is an important in addition providing
for ....'
-
On page 25, revise line 1 from the top to read ' ... July 21, 1997]
points out that, ....'
-
On page 28, 1st full paragraph, revise line 6 to read
' ... HSA, but may yield information be
as inadequate ....' Revise line 17 to read ' ... need to present the
this information obtained in its proper
....'
-
On page 29, revise line 1 from the top to read 'Sections 10
CFR 50.83(c)(2) and 10 CFR 50.83(d)(2) of
the ....'
-
On page 29, 1st full paragraph, revise line 2 to read
' ... areas. Hhowever, licensees
....' Revise line 4 to read ' ... with whether the adequacy
of HSAs and the site characterization process are adequate
bases to conclude in concluding that there
....'
-
On page 30, 1st full paragraph, verify that the next to
last sentence is consistent #2 on page 8.
-
On page 34, paragraph 2, revise lines 2 and 3 to read ' ... policy
statement articulates the NRC's provides a
revised policy concerning that the NRC will follow
in opening meetings ....'
-
On page 35, item 15. response, revise line 3 to read ' ... any regulations,
license conditions, or technical specifications impacted as
....'
-
On page 36, 1st full paragraph, line 6, underline "Federal
Register".
-
On page 36, last paragraph, revise line 6 to read ' ... of 10 CFR
Part 20, ....'
-
On page 38, last paragraph, revise line 2 to read ' ... Analysis
Report, which that form part of ....'
-
On page 39, revise line 2 from the top to read ' ... of the viability
of obtaining requesting NRC ....'
-
On page 39, 1st full paragraph, revise line 4 to read
' ... the activities that are outside the scope
of the NRC's jurisdiction of non-licensed ....' Revise line
5 to read ' ... engaging in such activities which ....'
Revise lines 9 and 10 to read ' ... well - such as suspending
the license, issuing an order, or suspension,
or issuing a demand for ....'
-
On page 40, 4th full paragraph, revise line 3 to read
' ... specified in Section 50.83(f).'
-
On page 41, paragraph 2, delete the period after the section number
to be consistent with the remainder of this section.
-
On page 42, last paragraph, revise line 7 to read ' ... as well
as, in for the ....'
-
On page 43, line 1 from the top, use of the word "lower" is not
clear.
-
On pages 45, 48 & 49, delete the period after the citations.
-
On page 50, line 5 from the top, clarification is needed on when
sampling would be done.
1. Section 201 of the Energy Reorganization Act,
42 U.S.C. Section 5841, provides that action of the Commission shall be
determined by a "majority vote of the members present." Commissioner Diaz
was not present when this item was affirmed. Accordingly the formal vote
of the Commission was 4-0 in favor of the decision. Commissioner Diaz,
however, had previously indicated that he would approve this paper and
had he been present he would have affirmed his prior vote. |