Home > Nuclear Reactors > New Reactors > Combined License Applications > North Anna, Unit 3 Application
North Anna, Unit 3 Application
|
Who: |
Dominion Virginia Power (Dominion)
|
What: |
Application for a combined license (COL) for an Economic Simplified Boiling Water Reactor (ESBWR) designated as North Anna Unit 3
|
When: |
November 27, 2007 (date of application submittal)
|
Where: |
Dominion's North Anna site near Richmond in Louisa County, Virginia |
|
On this page:
The following links on this page are to documents in our Agencywide
Documents Access and Management System (ADAMS). ADAMS documents are provided
in either Adobe Portable Document Format (PDF) or Tagged Image File Format
(TIFF).
To obtain free viewers for displaying these formats, see our Plugins,
Viewers, and Other Tools. If you have problems
with viewing or printing documents from ADAMS, please contact the Public
Document
Room staff.
Reference Documents
Applicant Documents
Some combined license applications were submitted with hyperlinks to various reference documents. Currently, the hyperlinks in those applications are not active. These hyperlinks represent an advanced feature that could be activated when the agency upgrades to web-based ADAMS, at which point these applications and documents such as the Design Control Documents would be linked together. In the interim, and for those applications that do not have the hyperlink feature, the reference documents may be viewed under the Reference Documents section of the combined license application page. In addition, DVDs of the various documents are available by contacting the Public Document Room staff.
Application Review Schedule
Key Milestones |
Completion Date Actual - A Target - T |
Application Tendered |
11/27/07 - A |
Acceptance Review |
Acceptance Review Start |
12/03/07 - A |
Docketing Decision Letter Issued/Acceptance Review Complete |
01/28/08 - A |
Review Schedule Established/Schedule Letter Issued to Applicant |
02/27/08 - A |
Safety Review |
Phase 1 –Requests for Additional Information (RAIs) Issued to Applicant |
08/29/08 - T |
Phase 2 – SER with Open Items issued |
04/20/09 - T |
Phase 3 – ACRS Review of SER with Open Items Complete |
07/28/09 - T |
Phase 4 – Advanced SER with no Open Items Issued |
03/10 - T |
Phase 5 – ACRS Review of SER with no Open Items Complete |
07/10 - T |
Phase 6 – Final SER Issued |
08/10 - T |
Environmental Review |
Phase 1 – Environmental impact statement (EIS) summary report issued |
09/05/08 - T |
Phase 2 – Draft EIS issued to EPA |
12/08 - T |
Phase 3 – Response to public comments on draft EIS issued |
06/09 - T |
Phase 4 – Final EIS issued to EPA |
12/09 - T |
Hearing |
Commission or ASLB hold mandatory hearing |
|
License |
Commission decision on issuance of COL application |
|
Information on Federal Register Notices for receipt of the application and opportunity to request a hearing or petition to intervene can be found at NRC’s Website on Hearing Opportunities.
NRC Documents
Requests for Additional Information
Category |
RAI Date |
RAI Letter No. and Subject |
Applicant Response |
Safety |
03/20/08 |
RAI Letter No. 01 SRP Section 12.02
|
04/28/08
|
03/28/08 |
RAI Letter No. 02 SRP Section 2.3.2.3
|
04/25/08
|
04/01/08 |
RAI Letter No. 03 SRP Section 2.3.4.3
|
05/12/08
|
05/19/08 |
RAI Letter No. 04 SRP Sections 11.02, 11.04, and 11.05
|
06/30/08
|
06/04/08 |
RAI Letter No. 05 SRP Sections 17.04, 17.06, and 19
|
07/14/08
|
06/05/08 |
RAI Letter No. 06 SRP Sections 06.02.01, 06.02.04, 10.03.06, and 14.02
|
07/14/08
|
06/11/08 |
RAI Letter No. 07 SRP Sections 09.03.02, 11.02, 11.03, 11.04, 11.05, and 13.05.02.01
|
07/23/08
|
06/11/08 |
RAI Letter No. 08 SRP Section 09.05.01
|
07/23/08
|
06/13/08 |
RAI Letter No. 09 SRP Section 08.02
|
07/28/08
|
06/17/08 |
RAI Letter No. 10 SRP Sections 2.05.04 and 02.05.05
|
07/14/08
|
06/19/08 |
RAI Letter No. 11 SRP Sections 02.05.04, 08.03.02, 09.02.05, 12.02, 13.01.02-13.01.03
|
08/04/08
|
06/23/08 |
RAI Letter No. 12 SRP Sections 05.02.05, 10.04.05, and 14.02
|
08/07/08
|
06/24/08 |
RAI Letter No. 13 SRP Sections 09.01.04, 09.01.05, 09.05.04, and 17.5
|
08/04/08
|
06/27/08 |
RAI Letter No. 14 SRP Sections 03.07.01, 03.07.02, and 05.02.04
|
08/12/08
|
07/07/08 |
RAI Letter No. 15 SRP Section 13.03
|
Rescheduled |
07/09/08 |
RAI Letter No. 16 SRP Sections 08.02, 09.05.04, and 12.02
|
08/21/08
|
07/15/08 |
RAI Letter No. 17 SRP Sections 02.01.02, 02.03.01, 02.03.02, 02.03.05, 09.02.01, and 14.02
|
08/28/08
|
07/18/08 |
RAI Letter No. 18 SRP Sections 13.03 and 14.03.10
|
Rescheduled |
07/21/08 |
RAI Letter No. 19 SRP Sections 02.03.05, 03.09.03, 05.03.01, and 14.03.10
|
09/03/08
|
07/27/08 |
RAI Letter No. 20 SRP Sections 09.05.01, 11.04
|
09/04/08
|
07/28/08 |
RAI Letter No. 21 SRP Sections 05.02.01.01, 05.02.01.02, 13.01.01, 13.01.02-13.01.03, 13.02.01, 13.02.02, 13.05.02.01, and 14.02
|
09/11/08
|
08/01/08 |
RAI Letter No. 22 SRP Sections 03.09.06 and 03.11
|
|
08/06/08 |
RAI Letter No. 23 SRP Sections 03.02.01 and 03.02.02
|
|
08/08/08 |
RAI Letter No. 24 SRP Sections 02.04.12, 12.02, 12.03-12.04, 12.05, 14.02, and 14.03.03
|
|
08/12/08 |
RAI Letter No. 25 SRP Sections 02.02.03, 03.05.01.05, 12.02, and 15.06.05
|
|
08/19/08 |
RAI Letter No. 26 SRP Sections 02.04.13, 03.09.02, 05.03.02, and 11.05
|
|
08/21/08 |
RAI Letter No. 27 SRP Sections 12.01 and 12.03-12.04
|
|
08/21/08 |
RAI Letter No. 28 SRP Sections 01 and 02.04.02
|
|
Environmental |
06/18/08 |
RAI Letter Regarding the Environmental Review of the Combined License Application
|
07/17/08
|
Public Meetings
Date |
Description |
04/16/08 |
Environmental Scoping
|
12/13 - 14/07 |
Meeting regarding the technical content of the North Anna 3 COLA
|
11/29/07 |
North Anna 3 COLA Orientation
|
10/24/07 |
Public Outreach Meeting
|
Contacts
Contacts for the North Anna COL Application |
Safety Project Manager |
Thomas Kevern |
Environmental Project Manager |
Alicia Williamson |
Contact a Public Affairs Officer |
|