Bellefonte Units 3 & 4
Callaway Unit 2
Calvert Cliffs Unit 3
Comanche Peak Units 3 & 4
Fermi Unit 3
Grand Gulf Unit 3
Levy County Units 1 & 2
North Anna Unit 3
River Bend Station Unit 3
Shearon Harris Units 2 & 3
South Texas Project Units 3 & 4
Victoria County Station Units 1 & 2
Virgil C. Summer Units 2 & 3
Vogtle Units 3 & 4
William States Lee III Units 1 & 2

Bellefonte Nuclear Station, Units 3 and 4 Application

Bellefonte
Who:   Tennessee Valley Authority (TVA)

What:   Application for a combined license (COL) for two Westinghouse Advance Passive 1000 (AP1000) Pressurized Water Reactors (PWRs) designated as Bellefonte Nuclear Station Units 3 & 4

When:   October 30, 2007 (date of application submittal)

Where:   TVA's Bellefonte site near Scottsboro in Jackson County, Alabama

On this page:

The following links on this page are to documents in our Agencywide Documents Access and Management System (ADAMS). ADAMS documents are provided in either Adobe Portable Document Format (PDF) or Tagged Image File Format (TIFF). To obtain free viewers for displaying these formats, see our Plugins, Viewers, and Other Tools. If you have problems with viewing or printing documents from ADAMS, please contact the Public Document Room staff.

Reference Documents

To top of page

Applicant Documents

Some combined license applications were submitted with hyperlinks to various reference documents. Currently, the hyperlinks in those applications are not active. These hyperlinks represent an advanced feature that could be activated when the agency upgrades to web-based ADAMS, at which point these applications and documents such as the Design Control Documents would be linked together. In the interim, and for those applications that do not have the hyperlink feature, the reference documents may be viewed under the Reference Documents section of the combined license application page. In addition, DVDs of the various documents are available by contacting the Public Document Room staff.

TVA transmittal letter for Bellefonte Nuclear Station Units 3 & 4 COLA (October 30, 2007)

  • Part 0 - Cover Letter, Affidavits, etc
  • Part 1 - Administrative and Financial Information
  • Part 2 - Final Safety Analysis Report (FSAR)
  • Part 3 - Environmental Report
  • Part 4 - Technical Specifications
  • Part 5 - Emergency Plan
  • Part 6 - [Not used. Reserved for applicants requesting Limited Work Authorization (LWA)]
  • Part 7 - Departures and Exemption Requests
  • Part 8 - [This Part contains safeguards information which is withheld from public availability]
  • Part 9 - [This Part contains other information which is withheld from public availability]
  • Part 10 - License Conditions and Inspection, Tests, Analyses and Acceptance Criteria (ITAAC)
  • Part 11 - Information Incorporated By Reference

To top of page

Application Review Schedule

Key Milestones Completion Date
Actual - A
Target - T
Application Tendered 10/30/07 - A
Acceptance Review
Acceptance Review Start
11/07/07 - A
Docketing Decision Letter Issued/Acceptance Review Complete
01/18/08 - A
Review Schedule Established/Schedule Letter Issued to Applicant
02/15/08 - A
Safety Review
Phase 1 –Requests for Additional Information (RAIs) Issued to Applicant
01/16/09 - T
Phase 2 - SER with Open Items issued
09/22/09 - T
Phase 3 - ACRS Review of SER with Open Items Complete
02/08/10 - T
Phase 4 - Advanced SER with no Open Items Issued
09/10 - T
Phase 5 - ACRS Review of SER with no Open Items Complete
01/11 - T
Phase 6 - Final SER Issued
03/11 - T
Environmental Review
Phase 1 - Environmental impact statement (EIS) summary report issued
08/19/08 - T
Phase 2 - Draft EIS issued to EPA
03/06/09 - T
Phase 3 - Response to public comments on draft EIS issued
08/10/09 - T
Phase 4 - Final EIS issued to EPA
01/10 - T
Hearing
Commission or ASLB hold mandatory hearing
 
License
Commission decision on issuance of COL application
 

Information on Federal Register Notices for receipt of the application and opportunity to request a hearing or petition to intervene can be found at NRC’s Website on Hearing Opportunities.

To top of page

NRC Documents

To top of page

Requests for Additional Information

Category RAI Date RAI Letter No. and Subject Applicant Response
Safety 02/15/08 Seismology RAI 06/30/08
05/30/08
03/19/08
04/14/08 RAI Letter No. 1 SRP Sections 03.06.03, 05.02.03 and 06.01.02 08/18/08
05/23/08
04/17/08 RAI Letter No. 2 SRP Section 05.03.01 07/10/08
05/30/08
04/22/08 RAI Letter No. 3 SRP Section 05.04.02.02 06/05/08
04/22/08 RAI Letter No. 4 SRP Section 05.03.03 05/16/08
04/23/08 RAI Letter No. 5 SRP Section 05.03.02 06/05/08
04/24/08 RAI Letter No. 6 SRP Section 03.09.06 06/05/08
04/28/08 RAI Letter No. 7 SRP section 03.09.06 06/12/08
05/05/08 RAI Letter No. 8 SRP Section 09.05.01 06/11/08
05/08/08 RAI Letter No. 9 SRP Section 09.05.01 06/23/08
05/08/08 RAI Letter No. 10 SRP Section 09.05.01 06/23/08 - NON-PUBLIC
05/09/08 RAI Letter No. 11 SRP Section 09.05.01 06/23/08
05/12/08 RAI Letter No. 12 SRP Section 06.04 06/23/08
05/12/08 RAI Letter No. 13 SRP Section 17.5 06/26/08
05/12/08 RAI Letter No. 14 SRP Section 17.5-10 06/11/08
05/12/08 RAI Letter No. 15 SRP Section 17.5-12 06/11/08
05/12/08 RAI Letter No. 16 SRP Sections 17.5-12 thru 17.5-18 06/24/08
05/13/08 RAI Letter No. 17 SRP Section 14.02-1 06/26/08
05/13/08 RAI Letter No. 18 SRP Section 10.03.06 06/27/08
05/13/08 RAI Letter No. 19 SRP Section 14.02-3 06/11/08
06/03/08 RAI Letter No. 20 SRP Section 09.05.01 07/10/08
05/15/08 RAI Letter No. 21 SRP Section 14.02 06/26/08
05/20/08 RAI Letter No. 22 SRP Section 2.3.1 08/18/08
06/12/08 - Partial Response
05/21/08 RAI Letter No. 23 SRP Section 5.2.4 08/29/08
07/03/08
05/22/08 RAI Letter No. 24 SRP Section 5.2.1 07/03/08
05/23/08 RAI Letter No. 25 SRP Section 08.01 06/24/08
05/23/08 RAI Letter No. 26 SRP Section 08.02 07/09/08
05/28/08 RAI Letter No. 27 SRP Section 14.03 06/24/08
05/28/08 RAI Letter No. 28 SRP Section 14.02 06/30/08
06/03/08 RAI Letter No. 29 SRP Section 10.04.07 07/17/08
06/06/08 RAI Letter No. 30 SRP Section 06.02.02 08/01/08
06/06/08 RAI Letter No. 31 SRP Section 11.02 08/01/08
06/06/08 RAI Letter No. 32 SRP Section 6.4 07/07/08
06/06/08 RAI Letter No. 33 SRP Section 11.03 08/01/08
06/09/08 RAI Letter No. 34 SRP Section 2.1.3 07/08/08
06/09/08 RAI Letter No. 35 SRP Section 2.2.1 & 2.2.2 07/08/08
06/09/08 RAI Letter No. 36 SRP Section 2.2.3 07/09/08
06/10/08 RAI Letter No. 37 SRP Section 10.03 07/21/08
06/10/08 RAI Letter No. 38 SRP Section 10.04.05 07/21/08
06/11/08 RAI Letter No. 39 SRP Section 10.02.03 07/10/08
06/17/08 RAI Letter No. 40 SRP Section 09.05.01 08/06/08
07/16/08
06/18/08 RAI Letter No. 41 SRP Section 11.02 07/28/08
06/19/08 RAI Letter No. 42 SRP Section 09.03.03 07/18/08
06/19/08 RAI Letter No. 43 SRP Section 11.05 07/31/08
06/20/08 RAI Letter No. 44 SRP Section 09.02.01 07/18/08
06/20/08 RAI Letter No. 45 SRP Section 09.02.01 07/18/08
06/20/08 RAI Letter No. 46 SRP Section 09.05.01 07/17/08
06/20/08 RAI Letter No. 47 SRP Section 06.02.06 07/23/08
06/20/08 RAI Letter No. 48 SRP Section 03.11 07/23/08
06/20/08 RAI Letter No. 49 SRP Section 09.02.01 07/18/08
06/25/08 RAI Letter No. 50 SRP Section 1 08/12/08
08/05/08
06/25/08 RAI Letter No. 51 SRP Section 05.02.01.01 07/25/08
06/25/08 RAI Letter No. 52 SRP Section 05.02.01.01 07/25/08
06/27/08 RAI Letter No. 53 SRP Section 03.05.01.03 07/23/08
06/30/08 RAI Letter No. 54 SRP Section 9.5.1 08/01/08
06/30/08 RAI Letter No. 55 SRP Section 9.5.1 07/23/08
06/30/08 RAI Letter No. 56 SRP Section 9.5.1 08/06/08
06/30/08 RAI Letter No. 57 SRP Section 9.5.1 08/08/08
07/01/08 RAI Letter No. 58 SRP Section 9.5.1 08/06/08
07/01/08 RAI Letter No. 59 SRP Section 01 08/12/08
07/01/08 RAI Letter No. 60 SRP Section 07.09 08/12/08
07/02/08 RAI Letter No. 61 SRP Section 09.01.05 08/13/08
07/03/08 RAI Letter No. 62 SRP Section 2.4.12 08/01/08
07/03/08 RAI Letter No. 63 SRP Section 2.4.13 08/01/08
07/03/08 RAI Letter No. 64 SRP Section 2.4.2 08/01/08
07/03/08 RAI Letter No. 65 SRP Section 2.4.6 07/28/08
07/07/08 RAI Letter No. 66 SRP Section 1 08/19/08
07/07/08 RAI Letter No. 67 SRP Section 2.4.12 08/04/08
07/09/08 RAI Letter No. 68 SRP Section 9.5.1 08/14/08
07/11/08 RAI Letter No. 69 SRP Section 13.03 09/17/08
08/11/08
07/11/08 RAI Letter No. 70 SRP Section 18 08/20/08
07/16/08 RAI Letter No. 71 SRP Section 01 08/29/08
07/16/08 RAI Letter No. 72 SRP Section 2.4.12 08/12/08
07/16/08 RAI Letter No. 73 SRP Section 2.4.13 08/15/08
07/16/08 RAI Letter No. 74 SRP Section 05.02.04 08/19/08
07/16/08 RAI Letter No. 75 SRP Section 2.3.3 08/13/08
07/16/08 RAI Letter No. 76 SRP Section 2.3.5 08/13/08
07/16/08 RAI Letter No. 77 SRP Section 2.3.3 08/14/08
07/18/08 RAI Letter No. 78 SRP Section 18 08/29/08
07/18/08 RAI Letter No. 79 SRP Section 18 09/02/08
07/18/08 RAI Letter No. 80 SRP Section 13.05.01.01 08/19/08
07/18/08 RAI Letter No. 81 SRP Section 13.02.01 08/19/08
07/17/08 RAI Letter No. 82 SRP Section 2.4.3 08/15/08
07/21/08 RAI Letter No. 83 SRP Section 19 09/04/08
07/21/08 RAI Letter No. 84 SRP Section 09.01.04 09/02/08
07/21/08 RAI Letter No. 85 SRP Section 09.03.03 08/15/08
07/21/08 RAI Letter No. 86 SRP Section 09.02.01 09/02/08
07/22/08 RAI Letter No. 87 SRP Section 01 08/21/08
07/25/08 RAI Letter No. 88 SRP Section 2.3.1 08/20/08
07/28/08 RAI Letter No. 89 SRP Section 07.05 09/04/08
07/29/08 RAI Letter No. 90 SRP Section 2.5.3 08/22/08
07/30/08 RAI Letter No. 91 SRP Section 09.05.01 08/20/08
08/01/08 RAI Letter No. 92 SRP Section 09.05.04 08/29/08
08/01/08 RAI Letter No. 93 SRP Section 13.03 08/29/08
08/01/08 RAI Letter No. 94 SRP Section 2.3.4 08/29/08
08/01/08 RAI Letter No. 95 SRP Section 2.3.4 08/29/08
08/04/08 RAI Letter No. 96 SRP Section 2.3.3 09/03/08
08/05/08 RAI Letter No. 97 SRP Section 2.3.2 09/04/08
08/05/08 RAI Letter No. 98 SRP Section 13.05.02.01 09/15/08
08/05/08 RAI Letter No. 99 SRP Section 2.3.1 08/29/08
08/05/08 RAI Letter No. 100 SRP Section 3.5.1.6 09/04/08 - NON-PUBLIC
08/05/08 RAI Letter No. 101 SRP Section 2.5.4 09/19/08 - NON-PUBLIC
08/05/08 RAI Letter No. 102 SRP Section 14.2 09/03/08
08/06/08 RAI Letter No. 103 SRP Section 01 09/04/08
08/06/08 RAI Letter No. 104 SRP Section 3.2.0.1 08/29/08
08/08/08 RAI Letter No. 105 SRP Section 3.2.6 08/29/08
08/07/08 RAI Letter No. 106 SRP Section 01 09/17/08
08/07/08 RAI Letter No. 107 SRP Section 03.09.03 09/04/08
08/07/08 RAI Letter No. 108 SRP Section 03.07.04 08/21/08
08/07/08 RAI Letter No. 109 SRP Section 12.01, 12.03-04, 12.05 09/22/08 - NON-PUBLIC
08/07/08 RAI Letter No. 110 SRP Section 03.07.01 09/05/08
08/07/08 RAI Letter No. 111 SRP Section 03.10 08/22/08
08/07/08 RAI Letter No. 112 SRP Section 19 09/22/08 - NON-PUBLIC
08/07/08 RAI Letter No. 113 SRP Section 10.04.06 09/05/08
08/07/08 RAI Letter No. 114 SRP Section 03.6.02 08/21/08
08/08/08 RAI Letter No. 115 SRP Section 03.02.02 08/29/08
08/08/08 RAI Letter No. 116 SRP Section 3.2.1 08/29/08
08/08/08 RAI Letter No. 117 SRP Section 03.02.02 08/29/08
08/08/08 RAI Letter No. 118 SRP Section 03.02.01 08/29/08
08/08/08 RAI Letter No. 119 SRP Section 2.3.4 09/05/08
08/08/08 RAI Letter No. 120 SRP Section 19 09/18/08 - NON-PUBLIC
08/08/08 RAI Letter No. 121 SRP Section 17.04 09/17/08
08/08/08 RAI Letter No. 122 SRP Section 13.03 09/08/08 - Partial Response
09/19/08 RAI Letter No. 125 SRP Section 2.5.2  
09/19/08 RAI Letter No. 126 SRP Section 2.5.2  
Environmental 07/11/08 RAI regarding the Environmental Review of the COL application for Bellefonte Nuclear Plant, Units 3 and 4  

To top of page

Public Meetings

Date Description
06/23 - 24/08 Trip Report of June 23 - 27, 2008, Hydrology-related site visit in support of the Bellefonte Combined License application
06/10/08 Meeting with TVA to discuss Electrical Power and the Fire Safety Program Requests for Additional Information (RAIs)
05/13 - 16/08 Hydrology-Related site visit in support of Bellefonte COL application
04/25/08 TVA to discuss Bellefonte combined license application hydrology review
04/03/08 Public Scoping Meeting
03/26 - 27/08 Meeting with Westinghouse and TVA to discuss inservice testing program
01/31/08 Westinghouse and TVA Regarding AP1000 Design Certification Amendment
11/13/07 Bellefonte R-COLA Orientation
09/11/07 Public Outreach

To top of page

Contacts

Contacts for the Bellefonte COL Application
Safety Project Manager Joseph Sebrosky
Sr. Environmental Project Manager Robert Schaaf
Environmental Project Manager Mallecia Hood
Contact a Public Affairs Officer

To top of page



Privacy Policy | Site Disclaimer
Wednesday, October 01, 2008