Combined License Applications for New Reactors
Bellefonte Units 3 & 4
Callaway Unit 2
Calvert Cliffs Unit 3
Comanche Peak Units 3 & 4
Fermi Unit 3
Grand Gulf Unit 3
Levy County Units 1 & 2
North Anna Unit 3
River Bend Station Unit 3
Shearon Harris Units 2 & 3
South Texas Project Units 3 & 4
Victoria County Station Units 1 & 2
Virgil C. Summer Units 2 & 3
Vogtle Units 3 & 4
William States Lee III Units 1 & 2

South Texas Project, Units 3 and 4 Application

South Texas Project
Who:   STP Nuclear Operating Company (STPNOC)

What:   Application for a combined license (COL) for two Advanced Boiling Water Reactors (ABWR) designated as South Texas Project Units 3 & 4

When:   September 20, 2007 (date of application submittal)

Where:   STPNOC's South Texas Project site near Bay City in Matagorda County, Texas

On this page:

The following links on this page are to documents in our Agencywide Documents Access and Management System (ADAMS). ADAMS documents are provided in either Adobe Portable Document Format (PDF) or Tagged Image File Format (TIFF). To obtain free viewers for displaying these formats, see our Plugins, Viewers, and Other Tools. If you have problems with viewing or printing documents from ADAMS, please contact the Public Document Room staff.

Reference Documents

To top of page

Applicant Documents

Some combined license applications were submitted with hyperlinks to various reference documents. Currently, the hyperlinks in those applications are not active. These hyperlinks represent an advanced feature that could be activated when the agency upgrades to web-based ADAMS, at which point these applications and documents such as the Design Control Documents would be linked together. In the interim, and for those applications that do not have the hyperlink feature, the reference documents may be viewed under the Reference Documents section of the combined license application page. In addition, DVDs of the various documents are available by contacting the Public Document Room staff.

STP 3 & 4 COLA

  • Part 1 – General and Financial Information
  • Part 2 – Final Safety Analysis Report (FSAR)
  • Part 3 – Environmental Report
  • Part 4 – Technical Specifications
  • Part 5 – Emergency Plan
  • Part 6 – not used (place holder for Site Redress Plan if needed at later date)
  • Part 7 – Summary of exemptions to and departures from the ABWR DCD
  • Part 8 – [This Part contains safeguards information which is withheld from public availability]
  • Part 9 – Inspection, Tests, Analyses and Acceptance Criteria (ITAAC)

To top of page

Application Review Schedule

Key Milestones Completion Date
Actual - A
Target - T
Application Tendered 09/20/07 - A
Acceptance Review
Acceptance Review Start
10/01/07 - A
Docketing Decision Letter Issued/Acceptance Review Complete
11/29/07 - A
Review Schedule Established/Schedule Letter Issued to Applicant
To be determined*
Safety Review
Phase 1 –Requests for Additional Information (RAIs) Issued to Applicant
 
Phase 2 – SER with Open Items issued
 
Phase 3 – ACRS Review of SER with Open Items Complete
 
Phase 4 – Advanced SER with no Open Items Issued
 
Phase 5 – ACRS Review of SER with no Open Items Complete
 
Phase 6 – Final SER Issued
 
Environmental Review
Phase 1 – Environmental impact statement (EIS) summary report issued
12/05/07 - A
Phase 2 – Draft EIS issued to EPA
To be determined*
Phase 3 – Response to public comments on draft EIS issued
 
Phase 4 – Final EIS issued to EPA
 
Hearing
Commission or ASLB hold mandatory hearing
 
License
Commission decision on issuance of COL application
 

* The NRC will establish a schedule after STPNOC resolves vendor support issues and makes any COL revisions necessary to allow staff’s review of the application in full. See the January 30, 2008 letter below for additional details.

Information on Federal Register Notices for receipt of the application and opportunity to request a hearing or petition to intervene can be found at NRC’s Website on Hearing Opportunities.

To top of page

NRC Documents

To top of page

Requests for Additional Information

Category RAI Date RAI Letter No. and Subject Applicant Response
Safety 03/25/08 RAI Letter No. 01 SRP Section 03.04.01 04/28/08
03/25/08 RAI Letter No. 02 SRP Section 03.04.01 04/28/08
03/25/08 RAI Letter No. 03 SRP Section 03.04.01 04/28/08
03/25/08 RAI Letter No. 04 SRP Section 03.04.01 04/28/08
04/14/08 RAI Letter No. 05 SRP Section 10.04.01 05/20/08
04/14/08 RAI Letter No. 06 SRP Section 10.03 05/20/08
05/06/08 RAI Letter No. 07 SRP Section 10.04.07 06/12/08
04/16/08 RAI Letter No. 08 SRP Section 17.5 05/22/08
04/15/08 RAI Letter No. 09 SRP Section 02.03.01 06/26/08
05/29/08
04/15/08 RAI Letter No. 10 SRP Section 02.03.03 06/26/08
06/12/08
05/29/08
04/15/08 RAI Letter No. 11 SRP Section 02.01.02 05/29/08
04/16/08 RAI Letter No. 12 SRP Section 10.04.03 05/20/08
04/16/08 RAI Letter No. 13 SRP Section 10.04.03 05/20/08
04/16/08 RAI Letter No. 14 SRP Section 10.04.03 05/20/08
04/16/08 RAI Letter No. 15 SRP Section 02.03.04 05/29/08
04/17/08 RAI Letter No. 16 SRP Section 02.03.04 05/29/08
04/16/08 RAI Letter No. 17 SRP Section 02.02.03 05/29/08
04/16/08 RAI Letter No. 18 SRP Section 02.03.04 06/26/08
05/29/08
04/16/08 RAI Letter No. 19 SRP Section 02.03.04 05/29/08
04/16/08 RAI Letter No. 20 SRP Section 02.03.05 05/29/08
04/23/08 RAI Letter No. 21 SRP Section 02.01.03 05/29/08
04/22/08 RAI Letter No. 22 SRP Section 10.03 05/20/08
05/01/08 RAI Letter No. 23 SRP Section 03.06.01 06/12/08
05/06/08 RAI Letter No. 24 SRP Section 10.04.07 05/29/08
05/06/08 RAI Letter No. 25 SRP Section 09.01.03 06/12/08
05/06/08 RAI Letter No. 26 SRP Section 09.03.03 06/12/08
05/06/08 RAI Letter No. 27 SRP Section 09.03.03 06/12/08
05/07/08 RAI Letter No. 28 SRP Section 02.03.03 06/12/08
05/14/08 RAI Letter No. 29 SRP Section 02.03.04 06/12/08
05/07/08 RAI Letter No. 30 SRP Section 02.03.05 06/12/08
05/12/08 RAI Letter No. 31 SRP Section 02.04.02 08/12/08
07/09/08
06/12/08
05/12/08 RAI Letter No. 32 SRP Section 02.04.03 07/09/08
07/02/08
06/12/08
05/12/08 RAI Letter No. 33 SRP Section 02.04.04 07/24/08
05/12/08 RAI Letter No. 34 SRP Section 02.04.05 09/10/08
09/04/08
08/27/08
08/12/08
06/26/08
05/12/08 RAI Letter No. 35 SRP Section 02.04.06  
05/12/08 RAI Letter No. 36 SRP Section 02.04.09 07/02/08
05/12/08 RAI Letter No. 37 SRP Section 02.04.10  
05/12/08 RAI Letter No. 38 SRP Section 02.04.11 06/26/08
05/12/08 RAI Letter No. 39 SRP Section 02.04.12 09/10/08
08/12/08
07/24/08
07/16/08
07/09/08
07/02/08
06/26/08
05/12/08 RAI Letter No. 40 SRP Section 02.04.13 08/27/08
08/12/08
07/24/08
07/02/08
06/26/08
05/12/08 RAI Letter No. 41 SRP Section 02.04.14 06/26/08
05/12/08 RAI Letter No. 42 SRP Section 02.04.01 07/09/08
06/12/08
05/12/08 RAI Letter No. 43 SRP Section 11.04 06/26/08
05/12/08 RAI Letter No. 44 SRP Section 02.04.08 08/27/08
05/14/08 RAI Letter No. 45 SRP Section 09.01.04 06/26/08
05/15/08 RAI Letter No. 46 SRP Section 05.02.05 06/26/08
05/21/08 RAI Letter No. 47 SRP Section 05.02.05 06/26/08
05/21/08 RAI Letter No. 48 SRP Section 05.02.05 06/26/08
05/19/08 RAI Letter No. 49 SRP Section 02.05.01 09/04/08
08/27/08
08/12/08
07/24/08
07/16/08
07/09/08
07/02/08
06/26/08
05/19/08 RAI Letter No. 50 SRP Section 02.05.02 09/04/08
08/27/08
08/12/08
07/24/08
07/09/08
07/02/08
05/19/08 RAI Letter No. 51 SRP Section 02.05.03 09/04/08
08/27/08
06/26/08
05/19/08 RAI Letter No. 52 SRP Section 02.05.04 09/10/08
08/12/08
07/09/08
05/21/08 RAI Letter No. 53 SRP Section 05.02.05 06/26/08
05/21/08 RAI Letter No. 54 SRP Section 10.04.05 07/02/08
05/21/08 RAI Letter No. 55 SRP Section 09.01.05 07/02/08
07/17/08 RAI Letter No. 56 SRP Section 13.03 08/27/08
08/01/08 RAI Letter No. 57 SRP Section 13.03 09/04/08
08/27/08
08/20/08 RAI Letter No. 58 SRP Section 13.03 09/04/08
09/12/08 RAI Letter No. 59 SRP Section 02.02.03  
09/08/08 RAI Letter No. 60 SRP Section 13.03  
09/09/08 RAI Letter No. 61 SRP Section 17.5  
Environmental 05/19/08 RAI Letter Related To The Environmental Report  

To top of page

Public Meetings

Date Description
07/23/08 Discussion of STPNOC's plans to submit revisions to COLA
02/05/08 Public Scoping Meeting
06/23/07 Public Outreach

To top of page

Contacts

Contacts for the South Texas Project COL Application
Safety Project Manager George Wunder
Environmental Project Manager Paul Kallan
John Fringer