skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
Staff Requirements Memorandum (SRM)
2008
2007
2006
2005
2004
2003
2002
2001
2000
1999
1998
1997
1996

Staff Requirements Memoranda (SRM) for 2007

Document number File Type Description Date
SECY-07-0225 HTML Icon PDF Icon Staff Requirements – Revision of NUREG-0654, Supplement 3, "Criteria for Protective Action Recommendations for Severe Accidents" 04/18/2008
SECY-07-0224 HTML Icon PDF Icon Staff Requirements - Final Rule: Regulatory Improvements to the Nuclear Materials Management and Safeguards System (RIN 3150-AH85) 02/07/2008
SECY-07-0208 HTML Icon PDF Icon Staff Requirements – Proposal for Updating Office of Nuclear Material Safety and Safeguards-Cognizant Regulatory Guides 01/09/2008
SECY-07-0207 HTML Icon PDF Icon Staff Requirements - SECY-07-0207 - Multinational Design Evaluation Program - Stage 2 Pilot Project 01/03/2008
SECY-07-0203 HTML Icon PDF Icon Staff Requirements - Rulemaking Plan: 10 CFR Part 110, "Export and Import of Nuclear Equipment and Material; Updates and Clarifications" 12/17/2007
SECY-07-0197 HTML Icon PDF Icon Staff Requirements – Reactor Decommissioning Trust Fund Oversight by Other Agencies and Recommendations Regarding Further Commission Action 01/09/2008
SECY-07-0185 HTML Icon PDF Icon Staff Requirements - Moderator Exclusion in Transportation Packages 12/18/2007
SECY-07-0184 HTML Icon PDF Icon Staff Requirements - Industry Trends Program for Operating Power Reactors - Baseline Risk Index for Initiating Events 12/21/2007
SECY-07-0182 HTML Icon PDF Icon Staff Requirements - Semi-Annual Update on the Status of Emergency Preparedness Activities 12/21/2007
SECY-07-0177 HTML Icon PDF Icon Staff Requirements - Proposed Rule: Decommissioning Planning (10 CFR Parts 20, 30, 40, 50, 70, and 72; RIN: 3150-AH45) 12/10/2007
SECY-07-0168 HTML Icon PDF Icon Staff Requirements - Denial of Rulemaking Petition Requesting an Amendment to 10 CFR 2.314(b) Regarding Representation of Affected Units of Local Government Participating in the High-Level Waste Proceeding 11/20/2007
SECY-07-0167 HTML Icon PDF Icon Staff Requirements - Revision of Policy Statement on Regulation of Advanced Reactors 03/26/2008
SECY-07-0163 HTML Icon PDF Icon Staff Requirements - Policy for Use of Peer-to-Peer Software and the Peer-to-Peer Threat to Sensitive Unclassified Non-Safeguards Information 10/18/2007
SECY-07-0162 HTML Icon PDF Icon Staff Requirements - Final Rule to Amend 10 CFR parts 19, 20, and 50: Occupational Dose Records, Labeling Containers, and the Total Effective Dose Equivalent (RIN 3150-AH40) 11/02/2007
SECY-07-0159 HTML Icon PDF Icon Staff Requirements – Denial of Petition for Rulemaking (PRM-51-9) – The State of Nevada 12/20/2007
SECY-07-0158 HTML Icon PDF Icon Staff Requirements - Final Rule - Clarification Of NRC Civil Penalty Authority Over Contractors and Subcontractors Who Discriminate Against Employees for Engaging in Protected Activities (RIN 3150-AH59) 10/24/2007
SECY-07-0155 HTML Icon PDF Icon Staff Requirements - Denial of a Petition for Rulemaking to Reconcile NRC Generic Environmental Impact Statement for Nuclear Power Plant Operating License Renewal Applications with the National Academy of Sciences Health Risks from Exposure to Low Levels of Ionizing Radiation: Biological Effects of Ionizing Radiation VII, Seventh Ed., 2005 Report (PRM-51-11) 11/15/2007
SECY-07-0148 HTML Icon PDF Icon Staff Requirements - Independent Spent Fuel Storage Installation Security Requirements for Radiological Sabotage 12/18/2007
SECY-07-0147 HTML Icon PDF Icon Staff Requirements - Response to GAO Recommendations and Other Recommendations to Address Security Issues in the NRC Materials Program 09/18/2007
SECY-07-0146 HTML Icon PDF Icon Staff Requirements – Regulatory Options for Licensing New Uranium Conversion and Depleted Uranium Deconversion Facilities 10/10/2007
SECY-07-0135 HTML Icon PDF Icon Staff Requirements - Status of Staff Information Technology/Information Management and Business Process Activities in Preparation for the HLW Repository Proceedings 08/29/2007
SECY-07-0134 HTML Icon PDF Icon Staff Requirements - Evaluation of the Overall Effectiveness of the Rulemaking Process Improvement Implementation Plan 10/25/2007
SECY-07-0131 HTML Icon PDF Icon Final Rule - 10 CFR Part 73 "Safeguards Information Protection Requirements" (RIN 3150 - AH57) 03/17/2008
SECY-07-0129 HTML Icon PDF Icon Staff Requirements - Revisions to Policy Governing Public Availability of Information Associated with Category I Fuel Facilities 08/31/2007
SECY-07-0126 HTML Icon PDF Icon Staff Requirements - Proposed Rule: Geologic Repository Operations Area Security and Material Control and Accounting Requirements (RIN 3150-A106) 11/27/2007
SECY-07-0124 HTML Icon PDF Icon Staff Requirements - Agencywide Documents Access and Management System Program Status Report 08/14/2007
SECY-07-0118 HTML Icon PDF Icon Staff Requirements - Status Report on the Progress of the G-8 Countries in Implementing the IAEA Code of Conduct (SRM-M050602A) 08/22/2007
SECY-07-0114 HTML Icon PDF Icon Staff Recommendations for Revisions to the Adversary Characteristics Screening Process 12/04/2007
SECY-07-0113 HTML Icon PDF Icon Staff Requirements - Final Rule: 10 CFR Parts 30, 31, 32, and 150 - Exemptions from Licensing, General Licenses, and Distribution of Byproduct Material: Licensing and Reporting Requirements (RIN 3150-AH41) 08/30/2007
SECY-07-0112 HTML Icon PDF Icon Staff Requirements - Staff Evaluation and Proposed Revision to the Public Radiation Safety Significance Determination Process to Address Radioactive Liquid Spills and Leaks 09/12/2007
SECY-07-0109 HTML Icon PDF Icon Staff Requirements - Final E-Filing Rule 08/21/2007
SECY-07-0108 HTML Icon PDF Icon Staff Requirements - Rulemaking Plan to Revise 10 CFR 51.22, "Criterion for Categorical Exclusion; Identification of Licensing and Regulatory Actions Eligible for Categorical Exclusion or Otherwise Not Requiring Environmental Review" (RM# 644) 08/08/2007
SECY-07-0104 HTML Icon PDF Icon Staff Requirements - Proposed Rulemaking - Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events (RIN 3150-A101) 09/11/2007
SECY-07-0101 HTML Icon PDF Icon Staff Requirements - Staff Recommendations Regarding a Risk-Informed and Performance-Based Revision to 10 CFR Part 50 (RIN 3150-AH81) 09/10/2007
SECY-07-0096 HTML Icon PDF Icon Staff Requirements - Possible Reactivation of Construction and Licensing Activities for the Watts Bar Nuclear Plant Unit 2 07/25/2007
SECY-07-0091 HTML Icon PDF Icon Staff Requirements - Integrated Regulatory Review Service Self-Assessment Results and Recommendation to Invite an Integrated Regulatory Review Service Mission to the United States 06/29/2007
SECY-07-0083 HTML Icon PDF Icon Staff Requirements - Proposed Agreement Between the Commonwealth of Pennsylvania and the Commission Pursuant to Section 274 of the Atomic Energy Act of 1954, as Amended 06/08/2007
SECY-07-0082 HTML Icon PDF Icon Staff Requirements - Rulemaking to Make Risk-Informed Changes to Loss-of-Coolant Accident Technical Requirements; 10 CFR 50.46a, "Alternative Acceptance Criteria for Emergency Core Cooling Systems for Light-water Nuclear Power Reactors" 08/10/2007
SECY-07-0081 HTML Icon PDF Icon Staff Requirements - Regulatory Options for Licensing Facilities Associated with the Global Nuclear Energy Partnership (GNEP) 06/27/2007
SECY-07-0078 HTML Icon PDF Icon Staff Requirements - Options and Recommendations for the Responsibility of Future Replenishment of Potassium Iodide 01/24/2008
SECY-07-0066 HTML Icon PDF Icon Staff Requirements - Annual Report to the Commission on Licensee Performance in the Materials and Waste Programs - Fiscal Year 2006 06/20/2007
SECY-07-0062 HTML Icon PDF Icon Staff Requirements - Final Rule: Requirements for Expanded Definition of Byproduct Material (RIN: 3150-AH84) 05/14/2007
SECY-07-0060 HTML Icon PDF Icon Staff Requirements - Basis and Justification for Approval Process for 10 CFR 20.2002 Authorizations and Options for Change 04/24/2007
SECY-07-0052 HTML Icon PDF Icon Staff Requirements - NRC Drug-Free Workplace Plan - Recommended Testing Rate 04/05/2007
SECY-07-0047 HTML Icon PDF Icon Staff Requirements - Staff Approach to Verifying the Closure of Inspections, Tests, Analyses, and Acceptance Criteria Through a Sample-based Inspection Program 05/16/2007
SECY-07-0037 HTML Icon PDF Icon Staff Requirements - Report to Congress on Abnormal Occurrences: Fiscal Year 2006 04/05/2007
SECY-07-0032 HTML Icon PDF Icon Staff Requirements - Recommended Staff Actions Regarding Correspondence with Allegers Involving Security-Related Concerns 03/28/2007
SECY-07-0030 HTML Icon PDF Icon Staff Requirements - Final Rulemaking on Limited Work Authorizations 04/17/2007
SECY-07-0011 HTML Icon PDF Icon Staff Requirements - Interim Implementation of Fingerprinting Requirements in Section 652 of the Energy Policy Act of 2005 03/12/2007
SECY-07-0001 HTML Icon PDF Icon Staff Requirements - Proposed Rule: Regulatory Improvements to the Nuclear Materials Management and Safeguards System (RIN 3150-AH85) 01/17/2007


Privacy Policy | Site Disclaimer
Thursday, April 24, 2008