Notice Date Published Citation

Extending Transmission Service Rates and Notice of Extension of Public Process for Rate Adjustment. Pacific Northwest-Pacific Southwest Intertie Project—Rate Order No. WAPA–133 (51 kb pdf)

December 28, 2006

71 FR 78189

Parker-Davis Project Post-2008 Resource Pool Final Allocation of Power developed under the requirements of the Energy Planning and Management Program (201 kb pdf)

December 4, 2006

71 FR 70380

Extending Firm Electric Service and Transmission Service Rate Methodologies for the Parker-Davis Project-Rate Order No. WAPA-131 (53 kb pdf)

October 2, 2006

71 FR 57941

FY 2007 base charge and rates approved for Boulder Canyon Project. The rates will provide sufficient revenue to pay all annual costs, including interest expense, and repay investments, within the allowable period  (56 kb pdf)

August 25, 2006

71 FR 50408

Announcing a public process to obtain comments on the proposed Amended Navjo Power Marketing Plan to provide for the future marketing of the United States' entitlement to generation from the Navajo Generating Station in excess of Central Arizona Project needs (59 kb pdf)

August 14, 2006

71 FR 46467

Rate order approved that revise the Transmission Revenue Requirement associated with Reactive Power and Voltage Control from the Central Valley Project and other non-Federal Generation Sources Service (VAR Support) and place new formula rates into effect on an interim basis. Rate Order No. WAPA-128 (100 kb pdf)

August 10, 2006

71 FR 45821

Consideration of Certain Public Utility Regulatory Policies Act Standards Set Forth in the Energy Policy Act of 2005 that Western intends to include net metering, fuel source diversity, fossil fuel generation efficiency, smart metering, and consumer interconnections (53 kb pdf)

August 4, 2006

71 FR 44276

Notice of intent to prepare an environmental impact statement; floodplain and wetlands involvement; and public scoping meetings for Eastern Plains transmission Project, Colorado and Kansas (83 kb pdf)

August 2, 2006

71 FR 43733

Announcing the Parker-Davis Project Post 2008 Resource Pool Proposed Allocation of Power developed under the requirements of the Energy Planning and Management Program (125 kb pdf)

July 17, 2006

71 FR 40503

Proposing adjustments to the Pacific Northwest-Pacific Southwest Intertie Project rates for firm transmission service—Rate Order No. WAPA–130 (52 kb pdf)

July 12, 2006

71 FR 39310

Extending the public comment period for the Big Stone II Power Plant and Transmission Project Draft Environmental Impact Statement (50 kb pdf)

July 7, 2006

71 FR 38640

Placing rates for Network Integration Transmission Service for the Parker-Davis Project and the Pacific Northwest-Pacific Southwest Intertie Project into effect on an interim basis. (99 kb pdf)

June 26, 2006

71 FR 36332

Western intends to prepare an environmental impact statement to construct and operate proposed power transmission facilities of the Trinity Public Utility District Direct Interconnection Project (55 kb pdf)

June 19, 2006

71 FR 35266

Notice of availability and public hearings of the Draft Big Stone II Power Plant and Transmission Project Environmental Impact Statement (59 kb pdf)

May 23, 2006

71 FR 29617

Placing the rate for regulation and frequency response service for the Loveland Area Projects—Western Area Colorado Missouri Balancing Authority into effect on an interim basis. Rate Order No. WAPA–118 (91 kb pdf)

May 17, 2006

71 FR 28684

Notice of intent to prepare a Supplemental Environmental Impact Statement to construct and operate a transmission line for the Sacramento Area Voltage Support Project and conduct scoping meetings; Notice of Floodplain and Wetlands Involvement. (59 kb pdf)

May 9, 2006

71 FR 26961

Extending the existing rate schedules for the Desert Southwest Customer Service Region network integration transmission services for Parker-Davis Project and Pacific Northwest-Pacific Southwest Intertie Project and ancillary services for the Western Area Lower Colorado control area. Rate Order No. WAPA–129 (109 kb pdf)

April 3, 2006

71 FR 16572

Proposing to revise the transmission revenue requirement for existing formula rates associated with Reactive Power and Voltage Control from the Central Valley Project and other non- Federal Generation Sources Service (VAR Support). Rate Order No. WAPA–128 (66 kb pdf)

March 2, 2006

71 FR 10666

Notice of proposed base charge and rates adjustment to the Boulder Canyon Project electric service base charge and rates (63 kb pdf)

March 2, 2006

71 FR 10664

San Luis Rio Colorado Project: Notice of intent to conduct public scoping meetings and to prepare an EIS on a proposal to construct new international transmission facilities and to connect those facilities with Western’s transmission system at its Gila Substation (71 kb pdf)

February 10, 2006

71 FR 7033

Placing transmission rates from the Central Arizona Project into effect on an interim basis. Rate Order No. WAPA–124 (79 kb pdf)

January 10, 2006