Federal Register Notices
2008
2007
2006
2005
2004
2003
2002
2001
2000
1999
1998
1997
1996
1995 |
1999 Federal Register notices |
Note: All files are in PDF.
Notice |
Date Published |
Citation |
Notice of Base Charge and Rates: Boulder Canyon Project, firm power into effect for the fifth rate year under the current rate methodology (24 kb pdf) |
December 15, 1999 |
64 FR 70011 |
Floodplain Statement of Findings: Western proposes to redirect the flow of the Little Laramie River to prevent a transmission line structure on the Miracle Mile-Cheyenne No. 1 transmission line from being washed out (15 kb pdf) |
December 10, 1999 |
64 FR 69265 |
Notice of Extension: Central Valley Project, Applications for the 2005 Resource Pool Power Allocations (13 kb pdf) |
December 9, 1999 |
64 FR 69018 |
Energy Planning and Management Program; Integrated Resource Planning Approval Criteria (106 kb pdf) |
November 17, 1999 |
64 FR 62604 |
Notice of Floodplain Involvement: Western proposes to redirect the flow of the Little Laramie River to prevent a transmission line structure on the Miracle Mile-Cheyenne No. 1 transmission line from being washed out (12 kb pdf) |
October 28, 1999 |
64 FR 58057 |
Notice of Floodplain Involvement: Mead Substation Access Road and Water Supply Improvements, Western proposes to reconstruct about 1.25 miles of Buchanan Boulevard south of Boulder City, Nevada, to improve the access to Mead Substation (13 kb pdf) |
October 28, 1999 |
64 FR 58057 |
Notice of the Call for 2005 Resource Pool Applications: The 2005 Resource Pool is available for new power allocations to qualified entities (26 kb pdf) |
October 19, 1999 |
64 FR 56343 |
Notice of Allocation Procedures and Call for Applications: Seeking applicants for long-term firm capacity and energy resources (power resources) available from the Salt Lake City Area Integrated Projects (27 kb pdf) |
September 8, 1999 |
64 FR 48825 |
Notice of Inquiry: Responses to comments on the impact of electric utility industry restructuring on Western’s power allocation policies (244 kb pdf) |
June 25, 1999 |
64 FR 34433 |
Notice of the Final 2004 Power Marketing Plan: Responds to the comments received on the Proposed 2004 Power Marketing Plan (Proposed Plan) and sets forth the final Marketing Plan (125 kb pdf) |
June 25, 1999 |
64 FR 34417 |
Notice of Decision: Application of the Energy Planning and Management Program Power Marketing Initiative to the Salt Lake City Area Integrated Project (35 kb pdf) |
June 25, 1999 |
64 FR 34414 |
ROD: Interconnection of the Sutter Power Project with the Keswick-Elverta/Olinda-Elverta 230-kV Double-Circuit Transmission Line (24 kb pdf) |
June 16, 1999 |
64 FR 32041 |
ROD: Interconnection of the Griffith Power Plant with Parker-Davis and Pacific Northwest-Pacific Southwest Intertie Transmission Systems (DOE/EIS-0297) (23 kb pdf) |
May 28, 1999 |
64 FR 29023 |
Correction notice on Desert Southwest Network Integration Transmission and Ancillary Services (15 kb pdf) |
May 26, 1999 |
64 FR 28469 |
Desert Southwest Network Integration Transmission and Ancillary Services— Rate Order No. WAPA-84 (94 kb pdf) |
May 11, 1999 |
64 FR 25323 |
Amistad and Falcon Projects, Rate Formula Extension— Rate Order No. WAPA-85 (45 kb pdf) |
May 11, 1999 |
64 FR 25320 |
ROD and Floodplain Statement: Southpoint Power Plant Interconnection (22 kb pdf) |
April 1, 1999 |
64 FR 15744 |
Boulder Canyon Project, proposed FY 2000 Parker-Davis Project, AZ service base charge (18 kb pdf) |
March 24, 1999 |
64 FR 14227 |
Pacific Northwest-Pacific Southwest Intertie Project, firm transmission service— Rate Order No. WAPA-76 (54 kb pdf) |
February 9, 1999 |
64 FR 6344 |
Notice of Public Process: Informal public information meeting for Native American tribes, Central Valley Washoe and Salt Lake City Area Integrated Projects (16 kb pdf) |
January 29, 1999 |
64 FR 4646 |
|