Federal Register Notices
2008
2007
2006
2005
2004
2003
2002
2001
2000
1999
1998
1997
1996
1995 |
2005 Federal Register notices |
Note: All files are in PDF.
Notice |
Date Published |
Citation |
Parker-Davis Project Post- 2008 Resource Pool Allocation Procedures (66 kb pdf) |
December 16, 2005 |
70 FR 74805 |
Placing firm power and firm peaking power rates from the Pick-Sloan Missouri Basin Program—Eastern Division into effect on an interim basis. Rate Order No. WAPA–126 (90 kb pdf) |
November 28, 2005 |
70 FR 71280 |
Notice of withdrawal of multisystem transmission rate proposal for long-term firm transmission service on the Parker-Davis Project, Pacific Northwest-Pacific Southwest Intertie Project, and the Central Arizona Project—Rate Order No. WAPA–114 (56 kb pdf) |
November 28, 2005 |
70 FR 71279 |
Placing firm electric service rates from the Loveland Area Projects into effect on an interim basis. Rate Order No. WAPA-125 (83 kb pdf) |
November 28, 2005 |
70 FR 71273 |
Solicitation of Interest for New Transmission Capacity between Wyoming and Colorado to examine possibilities for relieving the TOT 3 constraint (45 kb pdf) |
November 15, 2005 |
70 FR 69338 |
Notice of proposed network integration transmission service for the Parker-Davis Project, and the Pacific NW-SW Intertie Project and for ancillary services from the PDP, Boulder Canyon Project, and part of the CRSP. Rate Order No. WAPA-127 (56 kb pdf) |
October 12, 2005 |
70 FR 59335 |
Placing the Integrated System Transmission and Ancillary Services rate into effect on an interim basis for the Pick-Sloan Missouri Basin Program— Eastern Division. Rate Order No. WAPA-122 (110 kb pdf) |
September 23, 2005 |
70 FR 55821 |
Placing a non-firm power formula rate from the Stampede Powerplant of the Washoe Project into effect on an interim basis. Rate Order No. WAPA–119 (75 kb pdf) |
August 29, 2005 |
70 FR 51035 |
Placing the electric service ratesetting formula and FY 2006 base charge and rates from the Boulder Canyon Project into effect on an interim basis. Rate Order No. WAPA–120 (77 kb pdf) |
August 26, 2005 |
70 FR 50316 |
Placing firm power rates for the Salt Lake City Area Integrated Projects into effect on an interim basis Rate Order No. WAPA–117 (106 kb pdf) |
August 15, 2005 |
70 FR 47823 |
Extension of scoping period: Construction and Operation of the Proposed Big Stone II Power Plant and Transmission Project, South Dakota and Minnesota (48 kb pdf) |
July 26, 2005 |
70 FR 43143 |
Proposing revised rates for the Central Arizona Project firm point-to-point transmission service, nonfirm point-to-point transmission service, and Network Integration Transmission Service on the CAP 115-kV and 230-kV transmission lines. Rate Order No. WAPA–124 (51 kb pdf) |
July 1, 2005 |
70 FR 38130 |
Notice of proposed rate for the Loveland Area Projects—Western Area Colorado Missouri Balancing Authority-Rate Order No. WAPA 118 (57 kb pdf) |
June 20, 2005 |
70 FR 35424 |
Notice of proposed power rates for the Pick-Sloan Missouri Basin Program—Eastern Division-Rate Order No. WAPA–126 (62 kb pdf) |
June 16, 2005 |
70 FR 35080 |
Notice of proposed power rates for the Loveland Area Projects-Rate Order No. WAPA–125 (52 kb pdf) |
June 16, 2005 |
70 FR 35079 |
Notice of Intent: Construction and Operation of the Proposed Big Stone II Power Plant and Transmission Project, South Dakota and Minnesota (58 kb pdf) |
May 27, 2005 |
70 FR 30716 |
Revising the Parker-Davis wholesale firm power service rates schedule to include language pertinent to the Lower Colorado River Basin Development Fund surcharge—Rate Order No. WAPA—123 (56 kb pdf) |
May 24, 2005 |
70 FR 29741 |
Proposing a minor adjustment for non-firm energy from the Stampede Powerplant of the Washoe Project—Rate Order No. WAPA–119 (52 kb pdf) |
May 6, 2005 |
70 FR 24019 |
Pick-Sloan Missouri Basin Program— Eastern Division—Notice of Proposed Transmission and Ancillary ServicesRates—Rate Order No. WAPA–122 (59 kb pdf) |
April 18, 2005 |
70 FR 20119 |
Extending network integration transmission and acillary services rates for the Parker-Davis and Pacific Northwest-Pacific Southwest Intertie Projects (50 kb pdf) |
March 28, 2005 |
701 FR 15622 |
Notice of extension: Parker-Davis, Pacific Northwest-Pacific Southwest Intertie and the Central Arizona Projects— Rate Order No. WAPA-114 (60 kb pdf) |
March 3, 2005 |
70 FR 10398 |
Notice of proposed rate adjustment and extension of rate setting formula for the Boulder Canyon Project— Rate Order No. WAPA-120 (53 kb pdf) |
February 18, 2005 |
70 FR 8361 |
Nativas to construct and operate the proposed White Wind Farm Project in Brookings County, SD (56 kb pdf) |
February 18, 2005 |
70 FR 8359 |
Proposing adjustments to the Salt Lake City Area Integrated Projects firm power rates — Rate Order No. WAPA-117 ( 60 kb pdf) |
January 18, 2005 |
70 FR 2858 |
|