Projects & Studies
|
»
|
Critical Infrastructure Security Program (CISP)
|
»
|
Dam Bridge and Gate Painting: Upper St. Anthony Falls through Lock and Dam 10
|
»
|
East Two Rivers at Tower, Minnesota
|
»
|
Effects of Recreational Boating on the Upper Mississippi River System
|
»
|
General Investigations: Federal Energy Regulatory Commission(FERC) Licensing
|
»
|
General Investigations: Hydropower, Crown Hydro, Minneapolis, Minnesota
|
»
|
General Investigations: Hydropower, Ford Plant, Minneapolis, Minnesota
|
»
|
Hydropower, LSAF Hydro, Minneapolis, Minnesota
|
»
|
Hydropower, Lock and Dam 2, Hastings, Minnesota
|
»
|
Hydropower, Upper St. Anthony Falls, Minneapolis, Minnesota
|
»
|
Integrated Watershed Study: Minnesota River Basin in Minnesota, South Dakota, North Dakota and Iowa
|
»
|
Lock & Dam 10 Stage 2
|
»
|
Lock Tow Haulage Units
|
»
|
Lock and Dam 4 Embankment Environmental Assessment
|
»
|
Locks and Dams 2 - 10, Embankment Maintenance Study
|
»
|
Lower Pool 4 Channel and Dredged Material Management Study
|
»
|
McMillan Island, Mississippi River Channel Maintenance
|
»
|
Minnesota River Navigation Project
|
»
|
Mississippi Headwaters Reservoirs Dam Safety Issues
|
»
|
Mississippi Headwaters Reservoirs Project Sites
|
»
|
Mississippi River Locks and Dams Nos. 2-10 Embankment Rehabilitation
|
»
|
Mississippi River Major Maintenance / Rehabilitation
|
»
|
Mississippi River: Lock & Dam 3 Navigation Safety and Embankments, Minnesota and Wisconsin
|
»
|
Navigation and Environmental Sustainability Program (NESP)
|
»
|
Navigation, Mississippi River, Lock Bulkheads and Slot Installation, Minn/Wisc/Iowa
|
»
|
Operation and Maintenance, Lock and Dam 10 Stage 2
|
»
|
Reconnaissance Study: Minnesota River Basin in MN, SD, IA and ND
|
»
|
Recreational Boating Study of the Mississippi River, Pools 4 to 9, Summer 2003
|
»
|
River Resource Values and Expectation
|
»
|
Small-Boat Harbor Dredging, St. Paul, Minnesota (Harbor Dredging)
|
»
|
St. Croix River: Endangered Mussel Conservation - Zebra Mussel Control
|
»
|
Upper Mississippi River - Illinois Waterway System Navigation Study
|
»
|
Upper Mississippi River 9-Foot Project - Locks & Dams
|
»
|
Upper Mississippi River 9-Foot Project Channel Maintenance; MN, WI, IA
|
»
|
Warroad Harbor and River Harbor Dredging
|
|
|
|
Effects of Recreational Boating on the Upper Mississippi River System
Overview
|
The effects of recreational boating were assessed in order to better assess the effects of increased commercial navigation traffic in context of other stresses on the Upper Mississippi River ecosystem.
The presentation below was given at the North American Lake Management Society 2001 Symposium in Madison, Wis., on Nov. 9, 2001. If you have any questions about the presentation and the navigation study impact assessment work, please contact Daniel Wilcox at 651-290-5276 or email: daniel.b.wilcox@usace.army.mil.
|
Presentation and Abstract in pdf format
|
- Abstract
- Presentation
To view the remarks that accompany each slide, click on the "?" icon in the upperleft of the slide.
|
|
|
[Printable Copy]
|