About DOE Button Organization Button News Button Contact Us Button
Link: Energy home page
Science and Technology Button Energy Sources Button Energy Efficiency Button The Environment Button Prices and Trends Button National Security Button Safety and Health Button
OFFICE OF HEALTH, SAFETY AND SECURITY DEPARTMENTAL REPRESENTATIVE TO THE DNFSB
Text size: Smaller - Normal - Larger - Largest You are Here:  DOE > HSS > Departmental Representative
Departmental Representative
to the DNFSB

Home

Welcome

Archive

Chronological Listing
2009
2008
2007
2006
2005
2004
2003
2002
2001
2000
1990-1999

Board Recommendations

Board Recommendations
Rec.2008-1
Rec.2007-1
Rec.2005-1
Rec.2004-2
Rec.2004-1
Rec.2002-3
Rec.2002-1
Rec.2001-1
Rec.2000-1
Rec.1992-4

Public Meetings on Oversight

Public Meetings on Safety in Design

SIMS

SIMS Logon
Letter Commitments
Recommendation Commitments

Board Review of Directives

About Our Office

Mission and Functions
DOE Policy on Board Interaction
Recommendation Contact
DOE Site Contacts
Our Office Contact
Site Assignments
Office Assignments
Office Personnel
DOE/DNFSB Interface Workshop
Web Sites Related to Our Office

Interface Manual

About the Board

General Description
Board Members
Board Mission and Functions
Board Enabling Legislation
Board Safety Oversight Principles
Board Policy Statements
Board Strategic Plan
Board Performance Plan
Board Performance Report
Performance & Accountability Rpt.
Board Web Site
Road Map to the Board

Board Web Site

Contact Us

DepRep News

Quick Reference

Facility Representative

Federal Technical Capability Panel

DOE Integrated Safety Management

DOE Directives, Regulations, and Standards

DOE Phone Book

HSS Logo
 

Current National Threat Level is elevated

The threat level in the airline sector is HIGH or Orange
Read more


Information Archive Homepage
CORRESPONDENCE BY SITE 
Hanford Los Alamos Mound OakRidge RockyFlats Savannah River WIPP
Lawrence Livermore Nevada Test Site Pantex Sandia West Valley Misc.

Idaho

  •  JUMP TO:
2009 2008 2007 2006 2005 2004 2003 2002 
 2001 2000 1999 1998 1997 1996 1995 1994 1993 
          This page last updated Tuesday, May 06, 2008


headertrip.jpg (4453 bytes)

2009
No document links for 2009

2008
  • May 1,  2008, Board Letter regarding the seismic / structural design of the Integrated Waste Treatment Unit. [HTML] [PDF] [DOC]

2007
  • December 21,  2007, Department letter regarding the summary of actions taken and responses to the three remaining questions regarding the geotechnical and seismic investigations for the Integrated Waste Treatment Unit (IWTU) facility design. The scope and schedule to address these three questions was provided in reference 1. [HTML] [PDF] [DOC]
  • June 6,  2007, Board letter congratulating Mr. Robert Seal of Idaho Operations Office for being honored as the 2006 DOE Facility Representative of the Year. [HTML] [PDF] [DOC]
  • February 7,  2007, Department letter regarding implementation of DOE Order 425.1C, Startup and Restart of Nuclear Facilities[HTML] [PDF] [DOC]
  • January 24,  2007, Board letter regarding the Integrated Waste Treatment Unit (IWTU) at the Idaho National Laboratory. [HTML] [PDF] [DOC]

2006
  • September 27,  2006, Department letter transmitting two Environmental Management Pilot Facility evaluations for Deliverable 8.6.3 in the 2004-2 implementation plan, Active Confinement Systems[HTML] [PDF] [DOC]
  • June 13,  2006, Board letter congratulating Robert "Dary" Newbry of the Idaho Operations Office as the DOE Facility Representative of the Year for 2005. [HTML] [PDF] [DOC]
  • May 26,  2006, Department letter reporting completion of all Commitments in the Implementation Plan for Defense Nuclear Facilities Safety Board Recommendation 2000-2, Configuration Management - Vital Safety Systems and requesting closure of recommendation 2000-2. [HTML] [PDF] [DOC]
  • March 28,  2006, Board letter regarding the plutonium production at the Idaho National Laboratory Advanced Test Reactor (ATR). [HTML] [PDF] [DOC]

2005
  • June 21,  2005, Board letter commending Messrs. Jeffrey Craven and Robert Knighten of the Y-12 Site Office and Idaho Operations Office, respectively, as the 2004 DOE Facility Representatives of the Year. [HTML] [PDF] [DOC]

2004
  • May 26,  2004, BNFL Inc. letter to Board Member Dr. Bruce Matthews regarding ventilation systems at the Advanced Mixed Waste Treatment Project at Idaho. [PDF]

2003
  • October 10,  2003, Department letter regarding Idaho Operations Center's response to Board letter regarding High Efficiency Particulate Air (HEPA) filter ventilation systems. [HTML] [PDF] [DOC]
  • March 7,  2003, Board letter establishing a 30-day reporting requirement regarding Advanced Mixed Waste Treatment Project at the Idaho National Engineering and Environmental Laboratory. [HTML] [PDF] [DOC]

2002
No document links for 2002

2001
2000
1999

No document links for 1999
1998
  • January 11, 2000, Board letter forwarding a staff issue report documenting observations concerning the Department's upgrade of the work planning process at INEEL per the Integrated System Management System. [HTML] [WP] [PDF]
  • December 22, 1998, Board letter forwarding a staff issue report on the Advanced Mixed Waste Treatment Project at INEEL. [HTML] [WP] [PDF]

1997

  • March 26, 1997, Review of Actions Taken to Verify Readiness to Operate the High Level Liquid Waste Evaporator and the New Waste Calcimining Facility at the Idaho National Engineering and Environmental Laboratory. [HTML]
  • June 28, 1996, Advanced Test Reactor Design Review. [HTML]

1996

  • August 28, 1996, Handling of spent Nuclear Fuel, for August 19-23, 1996. [HTML]
  • June 13, 1996, Department letter responding to Board letter dated May 10, 1996 regarding the Board's review on the Department's Operational Readiness Review of the High-level Liquid Waste Evaporator at the Idaho Chemical Processing Plant. [HTML] [PDF] [WP]
  • May 22, 1996, Review of Phase II of the DOE's Operational Readiness Review of High-Level Liquid Waste Evaporator at the ICPP. [HTML]
  • April 19, 1996, Review of the Department of Energy's Operational Readiness Review of High-Level Liquid Waste Evaporator at the Idaho Chemical Processing Plant, Idaho National Engineering Laboratory. [HTML]
  • October 16, 1995, Report on INEL Emergency Response Exercise "Varmit". [HTML]
  • September 28, 1995, Review of Spent Nuclear Fuel Activities. [HTML]

1995

  • August 29, 1995, Board staff trip report:  INEL - Idaho chemical processing plant - August 8-10, 1995. [HTML]
  • September 19, 1995, Board staff trip report:  Chemical processing and safety basis at the new waste calcimining facility, INEL August 29-31, 1995. [HTML]
  • July 25, 1995, Board staff trip report on tank farm radiological protection at INEL (trip conducted on June 27-29, 1995).  [PDF]
  • May 2, 1995, Board staff trip report on fuel transfers and the NWCF at ICPP (trip conducted on March 28-30, 1995).  [PDF]
  • March 10, 1995, Board staff trip report:  Waste Management and Environmental Restoration, INEL. [HTML]
  • January 17, 1995, Board staff trip report:  Radiological Controls and Conduct of Operations, INEL, High Level Waste Tank Farm Replacement Project. [HTML]
  • January 30, 1995, Board staff trip report on Backup Power Supply Systems, INEL, Idaho Chemical Processing Plant. [HTML]

1994

  • October 12, 1994, Board staff trip report on electrical and fire protection systems at INEL. [PDF]
  • September 26, 1995, Review of Spent Nuclear Fuel Activities. [HTML]
  • September 16, 1994, Board staff trip report on Tritium Testing and Safety Analyses, INEL, Advanced Test Reactor.  [HTML]
  • September 15, 1995, Review of Site wide Training and Qualification Review at the Idaho National Engineering Laboratory. [HTML]
  • September 15, 1995, Review of Report on Review of Idaho National Engineering Laboratory Facility Representatives Program. [HTML]
  • August 22, 1994, Board staff trip report on structural and seismic review of CPP-666 spent fuel storage basins at INEL. [PDF]
  • August 22, 1994, Board staff trip report on structural and seismic review of CPP-603 spent fuel storage basins at INEL. [PDF]
  • April 28, 1994, Board staff trip report review of Idaho Chemical Processing Plant High Level Waste Tank Farm Activities. [HTML]
  • August 2, 1994, Board staff trip report on Fire Protection Program and Features, INEL, Radioactive Waste Management Complex report. [HTML]
  • July 29, 1994, Board staff trip report on the radiation protection program at INEEL. [PDF]
  • April 7, 1994, Board staff trip report on Recovery of SNAP Fuel from Corroding Fuel Cans in the CPP-603 South Basin. [HTML]
  • February 1, 1994, Board letter forwarding staff trip report on Idaho chemical processing plant. [PDF]

1993

  • November 23, 1993, Board staff trip report on INEL Radioactive Waste Management Complex, Facility Overview and Conduct of Operations Review. [HTML]
  • November 23, 1993, Board staff trip report on Spent Fuel Storage Basins at HAN, INL, and SRS. [PDF]
  • September 10, 1993, Board Staff's review of conduct of operations issues at ICPP. [PDF]
  • May 19, 1993, Board staff trip report on Idaho Chemical Processing Plant. [PDF]
  • March 18, 1993, Board staff trip report on operator recertification and requalification at SRS. [PDF]
  • March 4, 1993, Board letter forwarding staff trip report on fuel storage and NWCF at INEL (trip conducted January 11-15, 1993). [PDF]



  Security & Privacy Notice   •   HSS Information Inventory   •   HSS Organization                                      
The White House FirstGov.gov FirstGov.gov Spanish Version E-gov IQ FOIA
U.S. Department of Energy | 1000 Independence Ave., SW | Washington, DC 20585
1-800-dial-DOE | f/202-586-4403 |