Document Number |
File |
Description |
Date |
SECY-97-304 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Response to Staff Requirements Memorandum: SECY-97-144, "Potential
Policy Issues Raised by Non-Owner Operators" |
02/04/1998 |
SECY-97-303 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
"The Role of Industry (DSI-13)" and Use of Industry Initiatives
|
04/16/1998 |
SECY-97-300 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Proposed Strategy for Development of Regulations Governing Disposal
of High-Level Radioactive Wastes in a Proposed Repository at Yucca
Mountain, Nevada |
03/06/1998 |
SECY-97-299 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Laboratory Testing of Nuclear-Grade Activated Charcoal |
02/04/1998 |
SECY-97-295 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Two-Year Review of the Enforcement Policy, Proposed Revision to
the Enforcement Policy, Nureg-1600, Rev. 1 |
04/10/1998 |
SECY-97-293 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Walnut Creek Field Office (WCFO) Closure Plan |
01/27/1997 |
SECY-97-288 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Report to Congress on Abnormal Occurrences for Fiscal Year 1997 |
02/06/1998 |
SECY-97-287 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Final Regulatory Guidance on Risk-Informed Regulation:policy Issues
|
03/19/1998 |
SECY-97-279 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Generic and Cumulative Environmental Impacts of Transportation of
High-Level Waste (HLW) in the Vicinity of an HLW Repository (SRM M970612) |
01/13/1998 |
SECY-97-274 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Response to Request for Reconsideration or Delay of Implementation
of the Portion of the Final Policy Statement on Restructuring and
Economic Deregulation of the Electric Utility Industry Addressing
Joint and Several Liability of Owners |
01/20/1998 |
SECY-97-273 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Staff Requirements -- SECY-96-221 -- "Improving NRC'S Control Over,
and Licensees' Accountability For, Generally and Specifically Licensed
Devices" |
04/13/1998 |
SECY-97-263 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Request by New Mexico to Relinquish Authority for Sealed Source
and Device Evaluation and Approval |
12/02/97 |
SECY-97-262 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Rulemaking Plan - Minor Revisions of 10 CFR Part 72.106 to Conform
Dose Limits to 10 CFR Part 20 Methodology |
12/09/1997 |
SECY 97-260 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Resolution of Public Comments in the Federal Register Notice "Safety
Conscious Work Environment" |
01/22/1998 |
SECY-97-254 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Pilot Program with the State of Arizona |
12/24/1997 |
SECY-97-253 |
![PDF Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/tag-pdf.gif) |
Policy Options For Nuclear Power Reactor Financial Qualifications
in Response to Restructuring of the Electric Utility Industry |
01/15/1998 |
SECY-97-251 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Proposed Rule on Nuclear Power Reactor Decommissioning Costs |
02/05/1998 |
SECY-97-245 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Staff Options for Resolving a Petition for Rulemaking (PRM-50-63
AND 50-63A) Relating to a Re-Evaluation of the Policy Regarding the
Use of Potassium Iodide (KI) by the General Public after a Severe
Accident at a Nuclear Power Plant and COMSECY-97-028 - Federal Register
Notice on Potassium Iodide |
06/26/1998 |
SECY-97-244 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Waste Classification of the Trojan Reactor Vessel |
01/22/1998 |
SECY 97-241 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Redelegation of Authority |
12/02/1997 |
SECY-97-237 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Memorandum of Understanding with the Department of Energy |
11/13/1997 |
SECY-97-236 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Proposed Retransfer of High Enriched Uranium (HEU) Scrap From Canada
to The UK And Back to Canada For Medical Isotope Production at The
NRU Reactor |
10/21/1997 |
SECY-97-232 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Final Rule on Exempt Distribution and Use of a Radioactive Drug
Containing One Microcurie of Carbon 14 Urea (Parts 30 and 32) |
11/05/1997 |
SECY-97-229 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Graded Quality Assurance/Probabilistic Risk Assessment Implementation
Plan for the South Texas Project Electric Generating Station |
10/30/1997 |
SECY-97-228 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Final Amendments to 10 CFR Part 73, "Changes to Nuclear Power
Plant Security Requirements" |
11/05/1997 |
SECY 97-227 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Status of Staff Actions on Standard Review Plans for Antitrust Reviews
and Financial Qualifications and Decommissioning-Funding-Assurance
Reviews |
11/18/1997 |
SECY-97-225 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Enhancing NRC Effectiveness and Efficiency |
01/14/1998 |
SECY-97-224 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Creation of a Research Effectiveness Review Board |
11/04/1997 |
SECY-97-220 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Implementation of DSI 22 Research |
12/05/1997 |
SECY-97-214 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Changes to 10 CFR Part 72, Expand Applicability to Include Certificate
Holders And Applicants And Their Contractors And Subcontractors |
11/04/1997 |
SECY-97-208 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Elevation of The Core Damage Frequency Objective to a Fundamental
Commission Safety Goal |
10/16/1997 |
SECY-97-205 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Integration and Evaluation of Results from Recent Lessons-Learned
Reviews |
03/24/1998 |
SECY-97-201 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Changes to Paragraph (H) of 10 CFR Part 50.55a, "Codes and
Standards" |
10/08/1997 |
SECY-97-195 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Rulemaking Plan: 10 CFR Part 76, "Certification Amendment Process" |
10/09/1997 |
SECY-97-194 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Memorandum of Understanding Between The Nuclear Regulatory Commission
And The Department of Energy on Cooperation Regarding The Gaseous
Diffusion Plants |
10/10/1997 |
SECY 97-193 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Assistance to The U.S. Department of Energy's Fissile Materials
Disposition Program |
11/05/1997 |
SECY-97-190 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Draft Regulatory Guide And Standard Review Plan on Risk-informed
Inservice Inspection of Piping |
10/01/1997 |
SECY-97-188 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Formerly Licensed Sites Identified For Further Investigation in
Agreement States |
11/07/1997 |
SECY-97-187 |
![PDF Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/tag-pdf.gif) |
NMSS Policy And Procedures Letter "Procedure For Preparing The Annual
Report to Congress on The Gaseous Diffusion Plants" |
09/18/1997 |
SECY-97-186 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Changes to the Financial Protection Requirements For Permanently
Shutdown Nuclear Power Reactors, 10 CFR 50.54(w) and 10 CFR 140.11 |
10/06/1997 |
SECY-97-184 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Proposed Reactor Export Licenses to Combustion Engineering, Inc.
to Supply Major Components And Equipment For Four Nuclear Reactor
Units in The Republic of Korea -- Applications XR162 and XR163 |
08/26/1997 |
SECY 97-183 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Criteria for Funding Agreement State Training, Travel,
and Technical Assistance |
11/17/1997 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
SECY-97-177 |
![PDF Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/tag-pdf.gif) |
Final Rulemaking Plan: Revision of Dose Limit For Members of The
Public Exposed to Hospitalized Patients (10 CFR Part 20 And 35) |
09/09/1997 |
SECY-97-174 |
![PDF Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/tag-pdf.gif) |
NRC Employee Ownership of Energy or Utility Sector Mutual Funds |
08/26/1997 |
SECY-97-173 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Potential Revision to 10 CFR 50.65(a)(3) of the Maintenance Rule
to Require Licensees to Perform Safety Assessments |
12/17/1997 |
SECY-97-169 |
![PDF Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/tag-pdf.gif) |
Proposed Change to the Independent Radiation Monitoring Program
Under Which The NRC Contracts With States to Monitor The Environment
Around NRC-Licensed Facilities |
09/08/1997 |
SECY-97-168 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Issuance for Public Comment of Proposed Rulemaking Package for Shutdown
and Fuel Storage Pool Operation |
12/11/1997 |
SECY-97-167 |
![PDF Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/tag-pdf.gif) |
DSI 22 Implementation (Role of the Office of Research) |
09/16/1997 |
SECY-97-166 |
![PDF Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/tag-pdf.gif) |
Recovery of Millstone Nuclear Power Station |
08/21/1997 |
SECY-97-165 |
![PDF Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/tag-pdf.gif) |
Ralph L. Tetrick, Atomic Safety and Licensing Board Initial Decision,
Memorandum and Order Denying Reconsideration and Stay, and Order on
Remand: LBP-97-2, LBP-97-6, LBP-97-11 |
08/07/1997 |
SECY-97-164 |
![PDF Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/tag-pdf.gif) |
Shipment of Decommissioned Reactor Vessel, Containing Irradiated
Internals, From the Trojan Nuclear Plant to Hanford Nuclear Reservation,
Richland, Washington |
08/26/1997 |
SECY-97-156 |
![PDF Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/tag-pdf.gif) |
Application of Federal Government-Wide Conflict of Interest Requirements
And NRC Enforcement Policy on Licensee Integrity Issues to Agreement
State Programs |
09/03/1997 |
SECY-97-155 |
![PDF Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/tag-pdf.gif) |
Staff's Action Regarding Exemptions From 10 CFR 70.24 For Commercial
Nuclear Power Plants |
08/18/1997 |
SECY-97-154 |
![PDF Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/tag-pdf.gif) |
Resolution of Licensing Support System (LSS) Issues And Draft Proposed
Rule, 10 Cfr Part 2, Subpart j |
08/23/1997 |
SECY-97-149 |
![PDF Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/tag-pdf.gif) |
Nuclear Safety Research Review Committee (NSRRC) |
09/09/1997 |
SECY-97-148 |
![PDF Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/tag-pdf.gif) |
Recommendation on Need for Rule on Advanced Light Water Reactor
Severe Accident Performance |
08/06/1997 |
SECY-97-147 |
![PDF Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/tag-pdf.gif) |
Re-Evaluation of SECY-96-199 Issues; Plan to Better Focus Resources
on High Priority Discrimination Cases |
09/10/1997 |
SECY-97-146 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
NRC'S Mandated and Non-Mandated Activities And Revisions to Agency
Policy on Performing Reimbursable Work For Others |
11/05/1997 |
SECY 97-144 |
![PDF Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/tag-pdf.gif) |
Potential Policy Issues Raised by Non-Owner Operators |
08/29/1997 |
SECY-97-141 |
![PDF Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/tag-pdf.gif) |
Atlas Corporation; Docket No. 40-3453-MLA; LBP-97-9, Memorandum
and Order (Denying Hearing Request) |
08/04/1997 |
SECY-97-138 |
![PDF Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/tag-pdf.gif) |
Termination of Fort St. Vrain Nuclear Generating Station Operating
License |
07/24/1997 |
SECY-97-136 |
![PDF Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/tag-pdf.gif) |
Removal of the Anne Arundel County/Curtis Bay Depot Site From The
Site Decommissioning Management Plan |
07/29/1997 |
SECY-97-128 |
![PDF Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/tag-pdf.gif) |
Removal of the Army Research Laboratory Portion of the Watertown
Arsenal/Mall Site from the Site Decommissioning Management Plan |
07/16/1997 |
SECY-97-127 |
![PDF Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/tag-pdf.gif) |
Development of a Risk-Informed, Performance-Based Regulation for
Fire Protection at Nuclear Power Plants |
09/11/1997 |
SECY-97-115 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Program for Revision of 10 CFR Part 35, "Medical Uses of Byproduct
Material" and Associated Federal Register Notice |
06/30/1997 |
SECY-97-112 |
![PDF Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/tag-pdf.gif) |
Strategic Assessment Issue Paper: Staffing And Core Capabilities
(COMSECY-96-027)(DSI-18) |
10/02/1997 |
SECY-97-075 |
![HTML Icon](https://webarchive.library.unt.edu/eot2008/20080923082246im_/http://www.nrc.gov/images/navigation/html-icon.gif) |
Methodology and Criteria for Evaluating Core Research Capabilities
|
06/06/1997 |