The Rio Grande Citizens’ Forum (RGCF) was established in 1999 to facilitate the exchange of information between the USIBWC and members of the public about Commission activities between Percha Dam, New Mexico and Ft. Quitman, Texas. Below are Minutes and Presentations of previous meetings of the RGCF. Contact Public Affairs Office
Meeting Announcements |
Presentations |
Rio Grande Flood Control Improvements and Water Quality on Agenda for September 8th Public Meeting |
06/04/2008 - Rio Grande Canalization Project Collaborative and Rio Grande Flood Control Project PEIS 06/04/2008 - Rio Grande Project - 2008 Operating Plan by Bureau of Reclamation 06/04/2008 - Update on Status of Canalization Flood Control Project, Levee Rehabilitation 02/04/2008 - 2006-2008 Maintenance of the Rio Grande Channel in the area of El Paso, TX - Cd. Juarez, Chih. 02/04/2008 - Levee Improvements by Gabriel Duran, Engineer, U.S. IBWC 02/04/2008 - Storm 2006 Capital Project Update by Alan Shubert, City Engineer, City of El Paso 11/07/2007 - Levee Improvements Rio Grande Rectification Project, El Paso Area by Al Riera, USIBWC, PE Operations 11/07/2007 - Rio Grande Flood Control Levees by Steve Smullen, USIBWC, PE Engineering 5/2/07: Rio Grande Flood Control Levees, Update on FEMA and IBWC Activities, by Steve Smullen 5/02/07: Reclamation, Managing Water in the West, Rio Grande Project, U.S. Bureau of Reclamation "Save the Valley" Civic Associations - Presented @ El Paso 8/9/06 Citizens Forum Rio Grande Citizens’ Forum 11/08/06: Reclamation, Managing Water in the West, Rio Grande Project, U.S. Bureau of Reclamation |
Minutes |
|
05/02/2007 - Las Cruces, NM |