Proposed Improvements
Reconstruction and widening of the existing two-lane facility to a four-lane divided rural roadway, a railroad overpass, and improvements to the intersection at FM 2234.
Partners
TxDOT is conducting the study in cooperation with the Federal Highway Administration.
Contact Us
Lance Olenius
TxDOT Houston District
PO Box 1386
Houston, TX 77251-1386
Phone: (713) 802-5072
Email