Ely Creek Construction Site from Powell I – Section 206 Project located in Wise and Lee Counties in southwestern Virginia (USACE photo)

Ely Creek Construction Site from Powell I – Section 206 Project located in Wise and Lee Counties in southwestern Virginia (USACE photo) (Photo by Courtesy Asset)

Download HiRes
Lick Branch Construction Site from Powell I – Section 206 Project located in Wise and Lee Counties in southwestern Virginia (USACE photo)

Lick Branch Construction Site from Powell I – Section 206 Project located in Wise and Lee Counties in southwestern Virginia (USACE photo) (Photo by Courtesy Asset)

Download HiRes

Powell River

FACT SHEET (As of September 2012)

Bookmark and Share Email Print

 Powell River

 

US ARMY CORPS OF ENGINEERS                                                     BUILDING STRONG®

                                                                           FACT SHEET

                                                                    (As of September 2012)

AUTHORIZATION: Section 105 of the Water Resources Development Act of 1986 (Public Law 99-668, as amended).  Continuing Authorities Program (CAP).

TYPE OF PROJECT:  206 Ecosystem Restoration Project

LOCATION: Wise and Lee counties in southwestern Virginia.

 

CONGRESSIONAL INTEREST: Griffith (VA-09), Webb (VA), Warner (VA)

 

NON-FEDERAL SPONSOR: LENOWISCO Planning District.

                                                                                                                                                  

BACKGROUND:

·   The Virginia Department of Mines, Minerals, and Energy (VDMME) have indicated an interest in partnering with the Corps of Engineers for sites within the Straight, Reeds, Jones, and Cox Creeks (SRJC).

 

·   Potential ecosystem restoration solutions to be evaluated during the reconnaissance study include a variety of measures to improve aquatic ecosystem functions and values.

 

IMPORTANCE: This project will mitigate acid mine drainage (AMD) problems resulting from abandoned coal mines and construct and restore the ecosystem with construction of restoration treatment systems.

 

STATUS:

·    Corps and sponsor still maintain interest in implementation of Powell II – SRJC. This project requires a new start approval.

 

BUDGET ($): Estimated project costs are shown below.

 

 

Feasibility Phase

Total Estimated Cost

$1,700,000

     Federal Cost Estimate

1,350,000

     Non-Federal Cost Estimate

1,350,000

 

 

Federal Funds Data

 

     Allocation thru FY 2011

$815,000

     Allocation for FY 2012

(-12,500)

     Balance to Complete

0

     President’s Budget for FY 2013

0

SCHEDULE:

 

FY 2011 Completed Work: Complete Report

FY 2012 Scheduled Work: None

FY 2013 Scheduled Work: None.

 

Completion:  Needs a new start provision (CAP 206)

 

For more information regarding Powell River – Ecosystem Restoration, contact Tom Herbert, CELRN-PM-P, phone: (615) 736-7194, email:  thomas.herbert@usace.army.mil.


Corps Corps of Engineers Lee Nashville District Powell River U.S. Army Corps of Enigneers Nashville District USACE Virginia Wise