The Asset Management site includes information related to BPA's capital investment program, in particular, status reports for major capital projects, a list of projects anticipated to be submitted for approval, project synopses, and policies that govern BPA’s asset management practices.
Major Capital Project Status Report
The Major Capital Project Status report is provided on a quarterly basis, with the opportunity for external discussion and review at the Quarterly Business Review. The report focuses on the status of major capital projects with respect to cost, schedule and scope/capability targets that are established when projects are approved.
Public Materials for FY 2012
Public Materials for FY 2011
Capital Projects Anticipated to be Submitted for Approval
The Capital Projects Anticipated to be Submitted for Approval report is updated on a semi-annual basis. The report lists the major capital projects that are expected to be submitted for agency approval over the next six months. The report includes a brief description of the project along with a cost estimate where available.
Major Project Synopses
The Project Synopses are made available on this site when the projects are approved. The synopses provide a brief description of each major project, including the background of the issue being addressed, the objectives of the project and other key project information.
Desktop Modernization Project
JC Microwave Upgrade
McNary Governor Replacement
Pacific DC Intertie Upgrade
Tri Cities Maintenance Headquarters
Chief Joseph Governor Replacement
Eastside Alternate Operating Facility
Grand Coulee 500kV Switchyard Relay Replacement
Grand Coulee Keys Pump Generating Station Reliability Investments
Horse Butte Wind Interconnection
MT to WA Transmission System Upgrade NEPA
Puget Sound Area Northern Intertie (PSANI)
Jordan Butte Wind Generation Interconnection
P25 Two Way Mobile Radio Replacment
Rights of Way Access Roads and Land Acquisition FY12 to FY15
Summit Ridge Wind Generation Interconnection
Sustain Steel Program Defective Damper Replacements
Switchgear Replacement for Fault Duty FY12
WOMR Group 2 Big Eddy to Knight
Big Cliff Spillway Gate Rehabilitation
Central Ferry Generation Interconnection
John Day Governor Upgrade
The Dalles Powerhouse Governor Upgrade
Ross - Schultz Fiber Replacement
Bonneville Powerhouse 2 Station Service Replacement
Celilo Mercury Containment and Abatement
Central Oregon Transformer Addition
Control Replacement - COI Capacitors
DC Microwave Analog Spur Replacement and SONET Ring
Dexter Spillway Gate Rehabilitation
Little Goose Area Reinforcement Project
Steel Lines Sustain Program FY11-13
System Protection and Control Sustain Program FY11-13
Synchrophasor Project
Palisades Turbine Rehab and Runner Replacement
Grand Coulee Pre-Third Power Plant Overhaul Projects
Chief Joseph Turbine Runner Replacements Units 1-4, 15-16
Grand Coulee SCADA
Chief Joseph Turbine Replacements
Spacer Damper Replacement Program
3G 1710-1755 MHz Relocation
Access Roads
Grand Coulee Exitation System Replacement
500kV Spare transformer Project
RODS Replacement Project
#KC SONET Phase II Spur Healing
Network Open Season (NOS) ADF
McNary Main Unit 1-4 Stator Winding Replacement
Hills Creek Powerhouse Turbine and Unit Rehabilitation
Condon Wind Voltage Control
DC RAS Upgrade
Ice Harbor Turbine Redesign and Runner Replacement
#NC Microwave Analog Replacement
Black Canyon Third Generating Unit
FY10 Fleet Equipment Replacement
Grand Coulee Left Power House Transformer Replacement
Alvey Shunt Reactor
Lower Snake Exciter Replacement
Wood Lines Sustain Program FY10 - 13