December 20, 2010 - December 22, 2010
- Three stores provided !32 hours of luminosity
- Problems with two Linac quadrupole power supplies
- Cryo system technicians work on TEV sector D1 wet engine
- TEV quench during checkout
- JASMIN's run at MTest ends

December 17, 2010 - December 20, 2010
The Integrated Luminosity for the period from 12/13/10 to 12/20/10 was 66.31 inverse picobarns. NuMI reported receiving 7.62E18 protons on target during this same period.
- Five Stores provided ~62 hours of luminosity
- Operations had trouble with a Linac RF station (LRF3)
- Operators tuned the Linac backup source (I- Source)

December 15, 2010 - December 17, 2010
- Three stores provided ~36.1 hours of luminosity
- MI-52 Septa repaired
- NuMI recovered its target LCW system
- TRF6 repaired and brought online
- TeV sector A3 wet engine flywheel repaired
- TeV personnel conduct 150 GeV studies
- CDF access between stores to recover detector

December 13, 2010 - December 15, 2010
- Three stores provided ~36 hours of luminosity
- Store 8361 aborted due to a CIA (vacuum) crate failure
- MI-20 power supply door switch repaired
- Cryo system techs worked on wet engines at TeV sectors A3 and C1
- MI-52 Septa tripped off, which held off the T-944 beam

December 10, 2010 - December 13, 2010
The Integrated Luminosity for the period from 12/6/10 to 12/13/10 was 53.02 inverse picobarns. NuMI reported receiving 7.1E18 protons on target during this same period.
- Five stores provided ~57 hours of luminosity
- Booster configures RF to operate on one pre-pulse
- Store 8351 quenched due to separator spark
- I- Source vacuum pump fails - H- brought online
- TRF5 fiber module repaired
- ECool corrector magnet power supply settings reloaded

December 8, 2010 - December 10, 2010
- Four store provided ~30.75 hours of luminosity
- TeV quench during shot setup due to RF trip
- Meson FTBF T-944 (JASMIN) experiment begins taking beam
- MI accessed to fix vacuum leaks
- TeV conducts end-of-store and crystal collimator studies
- Shot setup aborted due to problem with MI bend power supply

December 6, 2010 - December 8, 2010
- Three stores provided ~54.25 hours of luminosity
- Operators tuned the Pbar transfer line
- Operators tuned the Proton Source
- Operators tuned MI
- A kicker pre-fire caused a loss of antiprotons during transfer

December 3, 2010 - December 6, 2010
The Integrated Luminosity for the period from 11/29/10 to 12/6/10 was 61.97 inverse picobarns. NuMI reported receiving 8.1E18 protons on target during this same period.
- Five stores provided ~33.5 hours of luminosity
- Linac personnel repaired LRF1 power amplifier vacuum problem
- Cryo system and vacuum technicians work on TeV
- Operators find low beta quadrupole ground fault, caused by LCW leaks
- Switchyard tuning required for T-1008 beam
- Store 8335 quenched due to a broken crankshaft for the C1 wet engine

December 1, 2010 - December 3, 2010
- Three stores provided ~42.25 hours of luminosity
- New Meson FTBF experiment T-1008 begins taking beam
- clogged D0 pond water inlet pipe forced experiment to turn off detector
- Booster 400 MeV Chopper repaired

November 29, 2010 - December 1, 2010
- Three stores provided ~42.25 hours of luminosity
- Pbar investigated Pbar Debuncher optical delay issues
- Store 8316 quenched due to instability in a transfer line
- CDF, D0, TeV A-E, and Pbar accessed for maintenance work
- Proton Source switched from the I- Source to the H- Source
- TeV suffered small luminosity loss due to antiproton emittances

November 24, 2010 - November 29, 2010
The Integrated Luminosity for the period from 11/22/10 to 11/29/10 was 57.5 inverse picobarns. NuMI reported receiving 8.4E18 protons on target during this same period.
- Eight Stores provided ~93.5 hours of luminosity
- Pbar accessed to repair PLC
- Low TeV luminosities improved by tune and angle adjustments
- TeV quench during shot setup
- TeV kicker tripped off due to low insulating gas

November 22, 2010 - November 24, 2010
- Three stores provided ~38.75 hours of luminosity
- Store 8291 aborted due to lightning strike
- NuMI trips due to exhaust fan breaker problems
- Store 8892 quenched due to HFU failure
- Cryo system techs conduct wet engine maintenance
- MTA takes special run of beam

November 17, 2010 - November 19, 2010
- Five stores provided ~32.75 hours of luminosity
- Store 8277 aborted due to a TRF2 spark
- T-979 came online as a secondary MTest experiment
- Store 8278 quenched due to a separator spark
- Store 8283 quenched due to a separator spark

November 15, 2010 - November 17, 2010
- Four stores provided ~33.75 hours of luminosity
- Operations aborted store 8268 when Feeder 46A tripped off
- Pelletron failure caused lower luminosity stores during repairs
- MiniBooNE accessed MI-12B

November 12, 2010 - November 15, 2010
The Integrated Luminosity for the period from 11/8/10 to 11/15/10 was 49.02 inverse picobarns. NuMI reported receiving 7.18E18 protons on target during this same period.
- Three stores provided ~26.25 hours of luminosity
- CDF accesses to repair broken detector wire
- Most of the complex also accesses to repair equipment
- NuMI stuck LCW valve repaired
- TeV quenched during turn-on

November 10, 2010 - November 12, 2010
- Three stores provided ~42.5 hours of luminosity
- Pbar Accumulator power supply LCW leak repaired
- Electron Cooling problems fixed
- CDF needs to repair their detector on Saturday; the repair might take from 10 hours to two days

November 8, 2010 - November 10, 2010
- Three stores provided ~35 hours of luminosity
- FESS continues to repair CUB boiler #2
- TeV access to repair sector D11 power lead
- Pbar magnet (PMag) ground faulted and replaced
- Pbar LCW leaks fixed
- TeV E1 wet engine repair today, 11/10/10

November 5, 2010 - November 8, 2010
The Integrated Luminosity for the period from 11/1/10 to 11/8/10 was 55.22 pb-1.
NuMI reported receiving 6.3E18 protons on target during this same period.

- Six stores provided ~62.75 hours of luminosity
- Linac RF causes small problem
- 400 MeV area corrector power supply replaced
- NuMI has problems with Lambertson trips

November 3, 2010 - November 5, 2010
- Two stores provided ~25.75 hours of luminosity
- TeV sector C1 wet engine need overhaul
- Pbar magnet LCW leak repaired
- TeV quench, no beam
- Pbar Debuncher injection Septa repaired
- MI power supply loop controller problems fixed
- Meson FTBF T-1004 experiment begins taking beam

November 1, 2010 - November 3, 2010
- Four stores provided ~31 hours of luminosity
- NuMI taking beam
- Pelletron repaired
- TeV abort kicker repaired
- TeV quench

October 29, 2010 - November 1, 2010
The Integrated Luminosity for the period from 10/25/10 to 11/1/10 was 59.99 inverse picobarns.
NuMI reported receiving no protons on target during this same period due to target work.
- Five stores provided ~44 hours of luminosity
- NuMI conducted target scans
- Pbar operated on a 2.4 second rep rate
- D0 need 10-hour access to fix detector
- Pelletron repairs in progress
- NuMI to start taking beam today, 11/1/10

October 27, 2010 - October 29, 2010
- Four stores provided ~35.75 hours of luminosity
- TeV conducts TEL and Crystal collimator studies
- Pelletron back online
- MI coalescing problems fixed
- Booster RF problems fixed
- NuMI plans to resume normal operations on Monday morning, 11/1/10

October 25, 2010 - October 27, 2010
- Four stores provided ~39.25 hours of luminosity
- TeV sector B4 wet engine flywheel repaired
- LRF1 surge resistor replaced
- Poor TeV proton load lifetime fixed
- Pbar off today, 10/27/10, for vacuum work

October 22, 2010 - October 25, 2010
The Integrated Luminosity for the period from 10/18/10 to 10/25/10 was 51.64 inverse picobarns. NuMI reported receiving no protons on target during this same period due to target work.
- Five stores provide ~59.25 hours of luminosity
- Electron Cooling problems
- Store 8199 aborted due to beam valves closing
- Booster vacuum burst
- Booster kicker problem repaired
- Wet engine repair today, 10/25/10

October 20, 2010 - October 22, 2010
- CALICE T-978 taking beam
- JASMIN equipment installed in Pbar
- Pbar target replaced
- Store 8188 aborted due to false quench indication
- Recycler stash lost
- MI low-level RF rebooted
- Store 8194 aborted due to inadvertent voltage change
- TeV quench during orbit check
- Meson power supply trip

October 18, 2010 - October 20, 2010
- Four stores provided ~29 hours luminosity
- Pelletron problems required access to repair
- TeV F4 pond water pump strainer clogged
- Vacuum valves closing caused TeV abort
- Recycler, MiniBooNE, Pbar, and Booster accesses

October 15, 2010 - October 18, 2010
The Integrated Luminosity for the period from 10/11/10 to 10/18/10 was 53.26 inverse picobarns. NuMI reported receiving no protons on target during this same period due to target work.
- Six stores provided ~65.25 hours of luminosity
- Antiproton TLG rep-rate studied
- CALICE experiment T-978 returned to the MTest line
- Pbar Accumulator PLC rebooted

October 13, 2010 - October 15, 2010
- Three stores provided ~33.5 house of luminosity
- Linac RF repaired
- Store 8171 aborted

October 11, 2010 - October 13, 2010
- Three stores provided ~30.75 hours of luminosity
- MI develops problems
- TeV quench during shot setup
- MI access to repair MIRF9 and 15

October 8, 2010 - October 11, 2010
The Integrated Luminosity for the period from 10/4/10 to 10/11/10 was 48.65 inverse picobarns. NuMI reported receiving no protons on target during this same period due to target work.
- Four Stores provided ~39.75 hours of luminosity
- TeV quench during shot setup
- TeV sector A4 dry engine failed after quench
- Cryo system techs overhauled dry engine

October 6, 2010 - October 8, 2010
- Four stores provided ~36.5 hours of luminosity
- MI-52 Lambertson vacuum leak repaired
- TRF3 power amplifier repaired
- Linac low-level RF system problems

October 4, 2010 - October 6, 2010
- Four stores provided ~26.5 hours of luminosity
- Meson Septa develops vacuum leak
- TeV sector C4 helium leak required access to fix
- Many machines conducted maintenance during TeV access
- TeV sector C2 dump failure
- MI prepared for access to fix Lambertson vacuum issue

October 1, 2010 - October 4, 2010
The Integrated Luminosity for the period from 9/27/10 to 10/4/10 was 62.73 inverse picobarns. NuMI reported receiving no protons on target during this same period due to target work.
- Five stores provided ~64.5 hours of luminosity
- Access for MI and Booster work
- Store 8137 aborted due to CAMAC crate problem
- MI VCB causes problems

September 29, 2010 - October 1, 2010
- Four stores provided ~ 39.25 hours of luminosity
- Controls rebooted the Time Line Generator
- TeV sector B3 Dump power Supply repaired
- Two cryo system front ends rebooted
- MI-50 service building breaker trip
- Booster and MI in access this morning

September 27, 2010 - September 29, 2010
- Three stores provided ~39 hours of luminosity
- Recycler kicker prefire
- TeV High Order Power Supply worked on
- Controls will reboot Time Line Generator

September 24, 2010 - September 27, 2010
The Integrated Luminosity for the period from 9/20/10 to 9/27/10 was 46.22 inverse picobarns. NuMI reported receiving no protons on target during this same period due to target work.
- Four stores provided ~43.5 hours of luminosity
- TeV D1 BPMs problems
- TeV quench during shot setup
- Time Line Generator problems
- Linac technicians worked on LRF3
- NuMI will be off for a month

September 22, 2010 - September 24, 2010
- Three store provided ~25 hours of luminosity
- Store 8106 aborted due to a yard breaker trip
- Quadrupole power supply problems delayed a shot
- TeV turned off for LCW system repairs

September 20, 2010 - September 22, 2010
- Four stores provided ~32.5 hours of luminosity
- MTest experiments T992 and T995 taking beam
- Separator spark caused 7E30 loss in luminosity
- TeV quench during shot setup
- MiniBooNE MI-12 air conditioning fixed
- NuMI personnel found target water leak

September 17, 2010 - September 20, 2010
The Integrated Luminosityfor the period from 9/13/10 to 9/20/10 was 60.37 pb-1.
NuMI reported receiving 5.2E18 protons on target during this same period.

- Five stores provided ~63.5 hours of luminosity
- Meson MTest experiments T992 and T995 taking beam
- NuMI down to repair target helium leak
- LRF5 PA change
- MI suffers from kicker problems
- GMPS control system cable repaired

September 15, 2010 - September 17, 2010
- Three stores provided 33.5 hours of luminosity
- TRF3 repaired
- Trouble with TeV VME crate
- Temporary fix on MI-10 power supply
- Meson MTest experiments T-992 and T-995 begin taking beam
- TeV SyncLite mirror adjusted
- NuMI turns off for eight days to check target helium leak

September 13, 2010 - September 15, 2010
- Three stores provided ~35 hours of luminosity
- MiniBooNE accessed to check their horn
- TeV end-of-store and machine studies
- MI-30 VCB problems
- TRF3 required power amplifier change

September 10, 2010 - September 13, 2010
The Integrated Luminosityfor the period from 9/6/10 to 9/13/10 was 48.41 inverse picobarns. NuMI reported receiving 5.62E18 protons on target during this same period.
- Five stores provided ~63.25 hours of luminosity
- Store 8079 aborted near to its termination due to a vacuum control card problem
- 400 MeV chopper repaired

September 8, 2010 - September 10, 2010
- Five stores provided ~27.5 hours of luminosity
- NuMI beam off due to helium leak and MI kicker problem
- Proton Source was turned off Friday morning for work on Linac, Booster, MI, and NuMI

September 6, 2010 - September 8, 2010
- Four stores provided ~ 25.25 hours of luminosity
- Store 8060 quenched
- NuMI and MiniBooNE accessed their collision halls

September 3, 2010 - September 6, 2010
The Integrated Luminosity for the period from 8/30/10 to 9/6/10 was 37.14 inverse picobarns. NuMI reported receiving 6.52E18 protons on target during this same period.
- Four stores provides ~47.25 hours of luminosity
- TeV vacuum leak repaired
- Linac personnel repaired LRF1
- RF personnel repaired MIRF6
- BRF6 yard breaker trip

September 1, 2010 - September 3, 2010
- Two stores provided ~24.25 hours of luminosity
- MI vacuum leak fixed
- Linac continues to investigate their breaker issues
- Store 8051 aborted due to F-sector vacuum problem

August 30, 2010 - September 1, 2010
- Three stores provided ~37.75 hours of luminosity
- TeV orbit checks continue
- An AP0 exhaust fan tripped off and inhibited stacking
- Recycler DCCT calibrated
- NuMI extraction kicker high voltage cable reterminated
- MI vacuum problems require access

August 27, 2010 - August 30, 2010
The Integrated Luminosityfor the period from 8/23/10 to 8/30/10 was 41.23 inverse picobarns. NuMI reported receiving 5.8E18 protons on target during this same period.
- Four stores provided ~40.5 hours of luminosity
- Transfer of antiprotons from the Recycler to the TeV lost
- The TeV quenched twice during shot setups
- MI-30 interlocks dropped due to a PLC failure

August 25, 2010 - August 27, 2010
- Three stores provided ~28 hours of luminosity
- Store 8010 aborted due to an RF trip
- TeV aborted during shot setup
- CUB LCW isolation valves closed
- Store 8017 quenched due to beam position
- MiniBooNE begins taking beam

August 23, 2010 - August 25, 2010
- Four stores provided ~30.5 hours of luminosity
- Linac suffered from RF problems
- MI LCW mixing valve fixed
- CDF and D0 accessed on Monday and Tuesday

August 20, 2010 - August 23, 2010
The Integrated Luminosity for the period from 8/20/10 to 8/23/10 was 4.58 inverse picobarns.
- Three stores provided ~20.75 hours of luminosity
- Many machine studies
- Faulty MI-62 LCW three-way valve fixed
- First store (7994) established 8/21/10 at 11 AM
- Pbar lithium lens replaced
- MI kicker problems
- NuMI kicker problems

August 18, 2010 - August 20, 2010
- Startup activities continue
- Tevatron shot on Saturday

July 23, 2010 - July 30, 2010
- Shutdown work on schedule
- Two unplanned power outages occurred

July 19, 2010 - July 23, 2010
- Fermilab Shutdown Report

July 16, 2010 - July 19, 2010
- Two stores provided ~36.75 hours of luminosity
- Stack lost
- LRF1 problems
- Power supplies turned off everywhere but the TeV on Saturday in preparation for shutdown
- Many machine studies
- Shutdown began at 8 AM, 7/19/10

July 14, 2010 - July 16, 2010
- Four stores provided ~34 hours of luminosity
- Booster GMPS, Linac LRF5, and the MI-8 line all caused problems
- Booster repaired a kicker
- All proton beam off at midnight tonight, 7/16/10
- TeV store will collide until Sunday midnight, 7/18/10
- Shutdown begins at 8 AM on Monday, 7/19/10

July 12, 2010 - July 14, 2010
- Four stores provided ~39.25 hours of luminosity
- Preaccelerator switched to H- Source
- Recycler kicker caused the loss of one antiproton transfer
- Pelletron repaired
- MTA reported finding their tuning problem
- P1 line vacuum burst

July 9, 2010 - July 12, 2010
The Integrated Luminosityfor the period from 7/5/10 to 7/12/10 was 51.16 pb-1. NuMI reported receiving 4.89E18 protons on target during this same period.
- Six stores provided ~55 hours of luminosity
- Pbar Debuncher bend bus power supply repaired
- MI Lambertson repaired
- Recycler corrector magnet power supply chassis replaced
- Store 7965 aborted - no quench
- Pelletron access need to make repairs
- MTA will take beam and then make 6-hour access

July 7, 2010 - July 9, 2010
- Four stores provided ~39 hours of luminosity
- MI personnel conducted slow spill studies
- TeV conducts 3x3 study store (7958)
- MI and MINERvA personnel conduct neutrino communications study
- Switchyard power supply repaired
- Pbar Debuncher bend bus current drop
- NuMI shutdown begins 7/12/10

July 2, 2010 - July 7, 2010
The Integrated Luminosityfor the period from 6/28/10 to 7/5/10 was 59.03 inverse picobarns. NuMI reported receiving 8.37E18 protons on target during this same period.
- Eight stores provided ~95.75 hours of luminosity
- CHL personnel overhaul Pbar dry engine
- I- Source problems
- FESS resolves many hight temperature problems
- Beam power reduction has begun
- Recycler vacuum cascade caused stash loss
- TeV personnel conducts studies

June 30, 2010 - July 2, 2010
- Four stores provided ~38.75 hours of luminosity
- I- Source brought online
- Cause of TeV luminosity jumps found and fixed

June 28, 2010 - June 30, 2010
- Three stores provided ~33.25 hours of luminosity
- NuMI power supply repaired
- TeV quench during shot setup

June 25, 2010 - June 28, 2010
The Integrated Luminosityfor the period from 6/21/10 to 6/28/10 was 57.74 inverse picobarns. NuMI reported receiving 8.27E18 protons on target during this same period.
- Six stores provided ~54.5 hours of luminosity
- Operators put the TeV through a wet and dry squeeze
- Store 7926 aborted due to a yard breaker trip, no quench
- Store 7929 aborted due to separator spark, no quench

June 23, 2010 - June 25, 2010
- Three stores provided ~18.5 hours of luminosity
- Cryo system techs worked on B3 valve and F1 wet engine
- Storm caused many trips on many systems
- Operators found and fixed an orbit distortion
- D2 vacuum repaired
- ECool personnel reconfigure Pelletron

June 21, 2010 - June 23, 2010
- Four stores provided ~43.5 hours of luminosity
- H- Source dome accessed to stabilize source
- Store 7911 had high antiproton emittances
- NuMI works on Horn power supply

June 18, 2010 - June 21, 2010
- Four stores provided ~46.25 hours of luminosity
- Booster and MI accesses
- A CUB Booster/Pbar LCW pump failed
- Storm caused store 7900 to abort
- TeV B48 separator repaired

June 16, 2010 - June 18, 2010
- Four stores provided ~41 hours of luminosity
- NuMI horn power supply's LCW leak fixed
- HP3DS repaired and brought back online
- Booster, MI and Recycler accessed

June 14, 2010 - June 16, 2010
- Four stores provided ~31.75 hours of luminosity
- FESS resolved MiniBooNE's air conditioning problems
- Operators aborted store 7894
- MI had main bus power supply problems

June 11, 2010 - June 14, 2010
The Integrated Luminosityfor the period from 6/7/10 to 6/14/10 was 63.46 inverse picobarns. NuMI reported receiving 7.37E18 protons on target during this same period.
- Five stores provided ~53.5 hours of luminosity
- Recycler personnel reset the Pelletron blower
- TeV sector E2 wet engine repaired
- TeV vacuum pumps repaired
- Feeder 97 reset
- Operators raise the H- Source pressure

June 9, 2010 - June 11, 2010
- Three stores provided ~30.75 hours of luminosity
- T-977 conducts detector work
- BRF10 power amplifier replaced
- Antiproton Source studies

June 7, 2010 - June 9, 2010
- Two stores provided ~40 hours of luminosity
- Cryo system technicians worked on TeV wet engines
- Recycler studies
- Booster suffered vacuum problem requiring access
- TeV studies

June 4, 2010 - June 7, 2010
The Integrated Luminosityfor the period from 5/31/10 to 6/7/10 was 68.54 inverse picobarns. NuMI reported receiving 8.57E18 protons on target during this same period.
- Five stores provided ~64 hours of luminosity
- Booster ion pump problems
- MINERvA (T-977) resumes taking beam

June 2, 2010 - June 4, 2010
- Three stores provided ~35 hours of luminosity
- Store 7867 aborted due to separator spark
- Beam halted and some accelerators turned off for load-shed test

May 31, 2010 - June 2, 2010
- Three store provided ~33.5 hours of luminosity
- Booster has problem with ion pump
- MI flying wire repaired
- Store 7864 quenched due to kicker pre-fire
- Thunder storms cause a number of systems to trip off

May 28, 2010 - May 31, 2010
The Integrated Luminosityfor the period from 5/24/10 to 5/31/10 was 36.88 inverse picobarns. NuMI reported receiving 8.37E18 protons on target during this same period.
- TeV sector C3 wet engine repaired
- 400 MeV chopper cable re-terminated
- AP0 line airflow work
- FESS repaired AP50 chilled water leak
- Store 7855 quenched at several houses in sector D
- TeV quench during shot setup

May 26, 2010 - May 28, 2010
- Three stores provided ~16 hours of luminosity
- TeV wet engine repaired
- Store 7839 quenched due to poor beam positions
- TeV quench during shot setup due to beam instability
- Pbar cryo system derimed

May 24, 2010 - May 26, 2010
- Three stores provided ~45.25 hours on luminosity
- Pbar repaired LCW leak
- T-1006 and T-995 experiments will begin taking beam 5/26/10

May 21, 2010 - May 24, 2010
- Four stores provided ~38.5 hours of luminosity
- Store 7828 quenched at A3
- Booster down due to kicker problem
- TeV quench during shot setup
- Kautzky valve replaced
- Pbar to make six-hour access on 5/25/10

May 19, 2010 - May 21, 2010
- Three stores provided ~28 hours of luminosity
- Cryo system personnel replaced flywheel for A4 wet engine
- Linac switched from the I- Source to the H- Source
- TeV quench during shot setup due to dipole power supply tripping off
- Linac adjusted the pulse beam width
- Operators searched Switchyard for LCW leaks - none found

May 17, 2010 - May 19, 2010
- Five stores provided ~38.75 hours of luminosity
- T-1005 experiment approved for beam
- BRF18 bypassed
- Linac Klystron LCW leak repaired
- Store 7819 aborted due to CIA crate problem

May 14, 2010 - May 17, 2010
The Integrated Luminosityfor the period from 5/10/10 to 5/17/10 was 61.08 inverse picobarns. NuMI reported receiving 7.33E18 protons on target during this same period.
- Four stores provided ~37.75 hours of luminosity
- Store 7812 aborted and quenched sectors B0, D0, D1, and F1
- Meson MTest 1005 experiment ready for beam on 5/17/10
- Kautzky valve repaired at D1
- Vacuum valve repaired at D1

May 12, 2010 - May 14, 2010
- Three stores provided ~41.75 hours of luminosity
- MINERvA experiment completes another run at MTest
- Store 7808 aborted due to lightening strike
- Lightening strikes caused other problems
- Booster RF sparking fixed

May 10, 2010 - May 12, 2010
- Four stores provided ~43.25 hours of luminosity
- NuMI Lambertson magnet power supply repaired
- NuMI accesses

May 7, 2010 - May 10, 2010
The Integrated Luminosity for the period from 5/3/10 to 5/10/10 was 58.78 inverse picobarns. NuMI reported receiving 6.73E18 protons on target during this same period.
- Four stores provided ~47.25 hours of luminosity
- MI RF low/mid level front ends required boot
- Store 7799 quenched at TeV sector D3
- Both the Recycler and Pbar lost a transfer

May 5, 2010 - May 7, 2010
- Three stores provided ~ 37 hours of luminosity
- NuMI investigated a target problem
- Pbar Debuncher kicker power supply repaired
- Pbar extraction Lambertson repaired
- MI Lambertson adjusted
- Store 7795 quenched due to a kicker pre-fire
- D0 makes 10 hour access to repair its silicon detector

May 3, 2010 - May 5, 2010
- Four stores provided ~29.75 hours of luminosity
- TeV quench with no store
- NuMI kicker power supply repaired
- Accumulator kicker power supply repaired
- NuMI develops helium leak

April 30, 2010 - May 3, 2010
The Integrated Luminosity for the period from 4/26/10 to 5/3/10 was 70.55 inverse picobarns. NuMI reported receiving 8.46E18 protons on target during this same period.
- Four stores provided ~52.5 hours of luminosity
- Pbar LCW leak found and fixed
- TeV quench during shot setup
- TEL2 vacuum leak fixed
- NuMI extraction kicker power supply problems

April 28, 2010 - April 30, 2010
- Three stores provided ~37.75 hours of luminosity
- NTF bend magnet power supply fixed
- MTA took beam to their first multiwire
- Shot delayed due to TeV RF problems

April 26, 2010 - April 28, 2010
- Four stores provided ~43.75 hours of luminosity
- NuMI kicker fluorinert temperature alarm; more flow fixed the problem
- T977, the MINERvA experiment resumes in the Meson MTest line
- Store 7771's luminosity of 386.5E30 comes in as third best

April 23, 2010 - April 26, 2010
The Integrated Luminosityfor the period from 4/19/10 to 4/26/10 was 51.99 inverse picobarns. NuMI reported receiving 8.69E18 protons on target during this same period.
- Five stores provided ~43.25 hours of luminosity
- Pbar personnel accessed water cage
- CUB column #3 brought online
- Store 7760 aborted due to ground fault indication
- Stack lost due to broken bolt on breaker

April 21, 2010 - April 23, 2010
- Three stores provided ~30 hours of luminosity
- CUB column 3 offline for regeneration
- MTA-MuCool commissioning begins
- Master Substation work completed
- Recycler damper problem fixed

April 19, 2010 - April 21, 2010
- Three stores provided ~26.5 hours of luminosity
- Store 7748 terminated unintentional
- Vacuum work completed at MI-11
- TRF6 water turbine repaired
- Master Substation work will occur on Wednesday afternoon

April 16, 2010 - April 19, 2010
The Integrated Luminosity for the period from 4/12/10 to 4/19/10 was 49.33 inverse picobarns. NuMI reported receiving 6.1E18 protons on target during this same period.
- three stores provided ~69 hours of luminosity
- 402.4E30 a new record store
- LCW leak in Pbar
- Main injector LCW leak
- Main injector vacuum problems
- Problems with ECool transfer line solenoid

April 14, 2010 - April 16, 2010
- Two stores provided ~23 hours of luminosity
- Tevatron cooldown problems
- Main Injector RF 3 way valve problem
- Bad MI-8 line shunt regulator
- New record luminosity store
- Linac buncher problems

April 12, 2010 - April 14, 2010
- Two stores provided ~18.25 hours of luminosity
- Scheduled repair period
- TeV cryogenic recovery problems
- Pbar stacking problems
- MI high Level RF cooling problems

April 9, 2010 - April 12, 2010
The Integrated Luminosity for the period from 4/5/10 to 4/12/10 was 69.51 inverse picobarns. NuMI reported receiving 8.03E18 protons on target during this same period.
- Five stores provided ~67.25 hours of luminosity
- I- vacuum valve closes
- Linac quadrupole power supply tripped off

April 7, 2010 - April 9, 2010
- Three stores provided ~45.25 hours of luminosity
- Controls problems cause loss of stack
- Large helium compressor trips off at CHL

April 5, 2010 - April 7, 2010
- Three stores provided ~42.5 hours of luminosity
- TeV proton studies
- ARF1 problems
- MI LCW leak fixed
- Recycler beam valve air leak fixed
- MiniBooNE off due to IRM crate trigger problems

April 2, 2010 - April 5, 2010
The Integrated Luminosity for the period from 3/29/10 to 4/5/10 was 71.71 inverse picobarns. NuMI reported receiving 8.68E18 protons on target during this same period.
- Five stores provided ~65.25 hours of luminosity
- MIRF problems resolved
- Meson MTest experiment T1004 begins taking beam
- P1 transfer line vacuum pumps trip off

March 31, 2010 - April 2, 2010
- Three stores provided ~40.75 hours of luminosity
- MI extraction power supply repaired
- I- Source trip; it reset

March 29, 2010 - March 31, 2010
- Four stores provided ~43.25 hours of luminosity
- Linac LCW pump at CUB failed - backup brought online
- Preaccelerator personnel will remove H- Source for cleaning

March 26, 2010 - March 29, 2010
The Integrated Luminosity for the period from 3/22/10 to 3/29/10 was 61.3 pb-1. NuMI reported receiving 7.82E18 protons on target during this same period.
- Four stores provided ~67.25 hours of luminosity
- Booster kicker cable reterminated
- P1 transfer line vacuum burst
- MIRF12 bypassed
- MiniBooNE reported Dewatering problems
- NuMI reported Humidifier problems

March 24, 2010 - March 26, 2010
- Four stores provided 31.75 hours of luminosity
- Store 7705 had a luminosity of 376.4E30 - Second highest
- I- Source output problems resolved
- Store 7706 terminated due to vacuum and cryo problems
- Booster kicker problems repaired

March 22, 2010 - March 24, 2010
- Four stores provided ~35.75 hours of luminosity
- DRF1 repaired
- NuMI Horn and MI-10 LCW pressure problems
- Store 7698 quenched due to quench indication
- Store 7704 set 2nd highest luminosity with 368.74E30
- Experiments T992 and T979 begin taking MTest beam

March 19, 2010 - March 22, 2010
The Integrated Luminosity for the period from 3/15/10 to 3/22/10 was 57.89 pb-1. NuMI reported receiving 6.74E18 protons on target during this same period.
- Five stores provided ~46.5 hours of luminosity
- Linac repairs LRF1
- Feeder 46A faulted
- MI RF problems
- TeV quench during shot setup
- Store 7690 quenched due to ComEd power glitch off-site
- Store 7695 Third highest with a luminosity of 350.7E30

March 17, 2010 - March 19, 2010
- Three stores provided ~36 hours and 45 minutes of luminosity
- Minos service building looses power
- A new average initial luminosity record for the Tevatron
- Problems with Linac RF Station #1

March 15, 2010 - March 17, 2010
- Three stores provided 43.25 hours of luminosity
- High voltage personnel repaired the cause of the Kautz Rd. Substation trip
- H- Source output dropped – I- Source brought online
- Booster accessed for RF and 400 MeV water skid maintenance
- NuMI accessed for fan work
- MI accessed to repair LCW leak
- MTest interlock problems

March 12, 2010 - March 15, 2010
The Integrated Luminosityfor the period from 3/8/10 to 3/15/10 was 60.41 pb-1. NuMI reported receiving 7.23E18 protons on target during this same period.
- Four stores provided 49.75 hours of luminosity
- TeV antiproton tune studies
- Booster CAMAC crate 10 problems
- Kautz Road Substation breaker trip - Store 7670 aborted
- TeV sequencer and CAMAC crate power supply problems

March 10, 2010 - March 12, 2010
- Three stores provide over 36 hours of integrated luminosity
- CUB chiller #2 back online
- Store 7667 in top 5 for highest initial luminosity at 351E30
- Rain tests sump pumps, temporary pump installed

March 8, 2010 - March 10, 2010
- Four stores provided ~37.75 hours of luminosity
- CDF fixes detector problem
- Store 7661 sets Record with a Luminosity of 354.4E30
- FESS configured MI LCW pumps for summer mode
- MIRF2 repaired
- Meson MTest T995 resumes taking beam
- Four-hour access on 3/11/10 to bring CUB chiller online

March 5, 2010 - March 8, 2010
The Integrated Luminosity for the period from 3/1/10 to 3/8/10 was 61.86 inverse picobarns. NuMI reported receiving 8.33E18 protons on target during this same period.
- Four stores provided ~51.25 hours of luminosity
- BRF4 high voltage cable repaired
- TeV sector A2 wet engine repaired
- Store 7655 had fourth highest luminosity with 347E30
- Network switch at C4 replaced

March 3, 2010 - March 5, 2010
- Three store provided ~39.5 hours of luminosity
- LRF3 Thyratron tube replaced
- Linac Klystron water skid LCW leak repaired
- Column number one at CUB tripped off
- Store #7650 fifth highest with a luminosity of 344.4E30

March 1, 2010 - March 3, 2010
- Three stores provided ~37 hours of luminosity
- H- Source extractor repaired
- MTest line LCW leak fixed
- Accumulator extraction kicker high voltage cable repaired
- TeV conducted Proton-only study - MTest T953 experiment will start up today

February 26, 2010 - March 1, 2010
The Integrated Luminosity for the period from 2/22/10 to 3/1/10 was 62.27 inverse picobarns. NuMI reported receiving 7.24E18 protons on target during this same period. - Five stores provided ~60.5 hours of luminosity
- Linac repaired LRF5
- Booster RF repaired
- H- Source needed tuning
- 750 KeV Line needed tuning

February 24, 2010 - February 26, 2010
- Three stores provides ~39.5 hours of luminosity
- Linac continues to work on LRF5
- MI had to back out of using new LLRF code
- Booster losses BRF1 and 14

February 22, 2010 - February 24, 2010
- Four stores provided ~42.25 hours of luminosity
- MTA conducted studies
- Booster problems due to BRF8
- Linac personnel worked on LRF5

February 19, 2010 - February 22, 2010
- Five stores provided ~60.5 hours of luminosity
- Linac and MI had some RF problems
- An off-site power glitch caused store 7625 to abort - no quench

February 17, 2010 - February 19, 2010
- Three stores provided ~36 hours and 30 minutes of luminosity
- LINAC Debuncher water skid problems
- TeV, D0, and CDF access were needed

February 15, 2010 - February 17, 2010
- Three stores provided ~44/75 hours of luminosity
- H- Source's water Resistor flushed and its extractor replaced
- LRF4 power amplifier replaced
- Feynman Computer Center suffered power outage

February 12, 2010 - February 15, 2010
The integrated luminosity for the period from 2/8/10 to 2/15/10 was 39.98 inverse picobarns. NuMI reported receiving 6.92E18 protons on target during this same time period.
- Four stores provided ~32.5 hours of luminosity
- Store 7603 quenched
- Linac personnel repaired several devices
- Store 7606 aborted
- Booster had TCLK problems
- MTA to take some beam today

February 10, 2010 - February 12, 2010
- Four stores provided ~22.5 hours of luminosity
- TeV safety system testing completed
- Store 7597 quenched
- Sore 7601 aborted

February 8, 2010 - February 10, 2010
- Three stores provided ~34 hours of luminosity
- TeV access to repair magnet lead
- MI vacuum problems required access to repair
- Feynman Computer Center suffered Power outage
- MI RF cavity replaced
- Store 7590 lost due to local earthquake

February 5, 2010 - February 8, 2010
The integrated luminosity for the period from 2/1/10 to 2/8/10 was 50.47 inverse picobarns. NuMI reported receiving 7.99E18 protons on target during this same period.
- Five stores provided ~63.75 hours of luminosity
- MTest off due LCW pump problem
- Pelletron recovered from full discharge
- TeV accessed to repair dipole lead

February 3, 2010 - February 5, 2010
- Three stores provided ~29.5 hours of luminosity
- Timing fixed for Accumulator RF station
- Power to NuMI sump pumps trip off
- Store 7577 aborted - no quench

February 1, 2010 - February 3, 2010
- Two stores provided ~14.75 hours of luminosity
- B11 separator sparking fixed
- One TeV quench during shot setup
- Accumulator kicker fixed
- Store 7573 aborted due to TeV RF trip - no quench

January 29, 2010 - February 1, 2010
The integrated luminosity for the period from 1/25/10 to 2/1/10 was 15.03 inverse picobarns. NuMI reported receiving 4.2E18 protons on target during this same period.
- Two stores provided 6.25 hours of luminosity
- Klystron RF station LCW leak repaired
- Three quenches occurred during shot setups
- Store 3559 quenched due to a separator spark

January 27, 2010 - January 29, 2010
- The accelerator complex was shutdown for maintenance - there was no beam
- Technicians found a MI vacuum leak
- The H- Source recovered
- Linac resumed sending beam at 10:30 AM, 1/28/10, and the rest of the complex was getting beam by midnight
- The TeV suffered a sector D0 quench
- A Linac Klystron LCW leak halted beam

January 25, 2010 - January 27, 2010
- Three stores provided ~44 hours of luminosity
- H- Source removed for cleaning
- Accelerator complex conducting maintenance

January 22, 2010 - January 25, 2010
- Three stores provided ~48.25 hours of luminosity
- TeV sector F4 quench due to abort kicker problem
- H- Source output dropping - 3 to 4 day shutdown planned to repair or replace

January 20, 2010 - January 22, 2010
- Three stores provided ~35.75 hours of luminosity
- H- Source water resister flushed
- Pbar LCW leak found on quadrupole magnet
- Store 7523 aborted, no quench

January 18, 2010 - January 20, 2010
- Three store provided ~34.75 hours of luminosity
- MI vacuum bursts
- Linac replaced quadrupole power supply

January 15, 2010 - January 18, 2010
The integrated luminosity for the period from 1/11/10 to 1/18/10 was 48.75 inverse picobarns. NuMI reported receiving 6.86E18 protons on target during this same period.
- Five stores provided ~62 hours of luminosity
- Linac RF station (LRF2) repaired
- MTest (T977 MINERvA) resumed taking beam
- MI injection kicker power supply repaired

January 13, 2010 - January 15, 2010
- Three stores provided ~29 hours and 45 minutes of luminosity
- LRF2 problem repaired
- Pbar LCW leak
- TeV vacuum problems

January 11, 2010 - January 13, 2010
- Three stores provided ~34 hours of luminosity
- Backup I- Source work continues
- LRF2 problems persist
- Booster Chopper cable repaired
- TeV tilt meters record Haiti earthquake

January 8, 2010 - January 11, 2010
- Four stores provided ~41.25 hours of luminosity
- Accumulator kicker problem fixed
- TRF4 repaired
- H- Source output dropped
- CDF access today (1/11/10) around 3 PM
- NuMI reported two new single day records for protons on target

January 6, 2010 - January 8, 2010
- Three stores provided ~41.75 hours of luminosity
- TRF6 problems resolved
- NuMI record: 13.42E17 protons on target for one day

January 4, 2010 - January 6, 2010
- Five stores provided ~32 hours of luminosity
- Pbar cooling problem fixed
- TeV quench during shot setup due to front end

December 21, 2009 - January 4, 2010
The integrated luminosity for the period from 12/21/09 to 1/4/10 was 122.1 inverse picobarns. NuMI reported receiving 17.37E18 protons on target during this same period.
- 18 stores provided ~256.25 hours of luminosity
- Pelletron autotune problem fixed
- Pbar cooling system PLC repaired
- Pbar lithium lens trips
- Store 7463 quenched
- Store 7468 established with AIL of 306.7E30
- Store 7470 quenched

 


Acclerator Update Archive:
2012 | 2011 | 2010 | 2009 | 2008 | 2007 | 2006 | 2005 | 2004 | 2003

More Information
For Tevatron luminosity charts and the current status of Fermilab's accelerators and detectors (live!), please go to Fermilab Now

Comments and Suggestions
What do you think about the Accelerator Updates? Please send comments and suggestions to: accelupdates@fnal.gov.


Return to Current Accelerator Update

 
last modified 12/28/2011    email Fermilab
Security, Privacy, LegalFermi National Accelerator Laboratory