The Colorado River Citizens' Forum was established in 2003 to facilitate the exchange of information between the USIBWC and members of the public about Commission activities in Yuma County, Arizona and Imperial County, California. Below are Minutes and Presentations of current meetings of the CRCF. See past minutes and presentations here.Contact Public Affairs Office
Meeting Announcements |
Presentations |
8/20/2009 |
Drop 2 Storage Reservoir Construction Project by Michael E. Vandervelde, P.E. from May 11, 2009 All-American Canal Lining Project by Vikki Dee Bradshaw from May 11, 2009 Improving the Quality of Mexicali Effluent: Design and Implementation Plan for a Treatment Wetland by Francisco Zamora-Arroyo from May 11, 2009 Yuma East Wetlands Restoration Project from June 9th meeting Lower Colorado Dam's Quagga Mussel Assessment and Potential Control/Preventive Program by Reclamation at June 9th meeting. The Colorado River: Operation and Current Conditions by Reclamation at June 9th meeting Colorado River Joint Cooperative Process U.S. - Mexico by Sally Spener from November 18, 2008 All American Canal Construction Photos from November 18th Public Meeting The Colorado River: Operations and Current Conditions by Bureau of Reclamation from 06/09/08 meeting Lower Colorado Dam's Quagga Mussel Assessment and Potential Control/Preventive Program by Bureau of Reclamation from 06/09/08 meeting Drop 2 Storage Reservoir Project Status Update by Bureau of Reclamation from 03/03/08 meeting Colorado River Delta Fourth Work Group from 03/03/08 meeting Water Quality Sampling on the New River by C. Peña, Division Engineer, USIBWC from 03/03/08 meeting New River Pollution from Mexico Update by J. Angel, Assistant Executive Officer, P.E. from 03/03/08 meeting |
Minutes 03/03/08 - Calexico, CA |
|