Building 100 |
Crissy Field |
Cultural Institutions on the Main Post |
Letterman Project |
Lodge at the Main Post |
Main Parade Ground |
Main Post Update |
Mountain Lake Enhancement Project |
Playing Fields |
Presidio Golf Course IPM Program |
Presidio Trust Management Plan |
Public Health Service Hospital Project |
Tennessee Hollow Watershed Project |
Thornburgh-West Letterman Project |
Trails and Bikeways Master Plan |
Vegetation Management Plan |
Walt Disney Family Museum |
Water Recycling Project |
|
Building 100 |
Environmental Assessment
- Back to the Top - |
|
Crissy Field |
Crissy Field Marsh Expansion Study – Final Report (March 16, 2004) Chapter 1 to 3 Chapter 4 Chapter 5 Chapter 6 to 10 Appendix A
- Back to the Top - |
|
Cultural Institutions on the Main Post |
Public Museum at the Presidio - Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping (August 2007)
Request for Proposals – Cultural Institutions at the Presidio Main Post Amendment #1 to the RFP for Cultural Institutions (October 16, 2007)
- Back to the Top - |
|
Letterman Project |
Letterman Final Environmental Impact Statement
Letterman Complex Programmatic Agreement
Letterman Complex Final Planning and Design Guidelines
- Back to the Top - |
|
Lodge at the Main Post |
Public Scoping Notice – November 2006
- Back to the Top - |
|
Main Parade Ground |
Main Parade Ground Environmental Assessment (November 2007)
- Back to the Top - |
|
Main Post Update |
National Environmental Policy Act Documents
Summary Brochure – Bringing Back the Heart of the Presidio
Draft Main Post Update of the Presidio Trust Management Plan (June 2008) Part 1 Part 2
Presidio Trust Management Plan Main Post Update – Draft Supplemental Environmental Impact Statement (June 2008) Part 1 (Chapter 1) Part 2 (Chapter 2) Part 3 (Chapter 3 Sections 3.1 through 3.5) Part 4 (Chapter 3 Sections 3.6 through 3.8) Part 5 (Chapter 3 Sections 3.9 to conclusion) Appendix A
National Historic Preservation Act/Section 106 Documents
Draft Finding of Effect for the Main Post Update (February 2009)
California State Historic Preservation Officer Comment Letter – July 3, 2008
California State Historic Preservation Officer Comment Letter – July 18, 2008
References
Request for Proposals for Cultural Institutions on the Presidio Main Post (August 2007)
Draft Levantar Archaeological Management Strategy Part 1 Part 2
Draft Archaeological Collections Management Policy
Draft Cut and Fill Map 1871-2000
Draft Cultural Landscape Assessment of the Main Post Part 1 Part 2
Draft Identified Historic Properties Report
Draft Geoarchaeological Investigations for the Proposed Presidio Contemporary Art Museum
Draft Presidio Lodge Archaeological Test Trenching Results
Draft Archaeological Research Design Report for El Presidio and the Main Post
Draft Archaeology Education Program Prospectus
Draft Archival Research Report
Report on Archaeological Shovel Probe Survey at the Presidio of San Francisco
Draft Presidio Heritage Program: A Museum Without Walls
DRAFT 2008 National Historic Landmark (NHL) Update (85% as of July 2008) Introduction Section 7: Description Section 8: Statement of Significance Section 9: References Photographs Maps and Figures Updated Building Classifications Map (June 2008) Appendix A: Previous Archaeological Studies Appendix B: DPR 523 C Records Appendix C: Archeological Property Templates
- Back to the Top - |
|
Mountain Lake Enhancement Project |
A Summary of the Mountain Lake Enhancement Plan
Mountain Lake Enhancement Plan and Environmental Assessment Chapter 1: Introduction Chapter 2: Affected Environment Chapter 3: Enhancement Alternatives Chapter 4: Environmental Consequences Chapter 5: Consultation and Coordination Appendices FONSI - Finding of No Significant Impact
- Back to the Top - |
|
Playing Fields |
Summary of November 15, 2006 Playing Fields Public Workshop
|
Summary of September 21, 2006 Playing Fields Public Meeting
|
Frequently Asked Questions about Recreation in the Presidio (September 2006)
|
- Back to the Top -
|
|
Presidio Golf Course IPM Program
Presidio Golf Course IPM Program Environmental Assessment
FONSI (Finding Of No Significant Impact) Attachment One: Public Comment Attachment Two: Errata
|
- Back to the Top - |
|
Presidio Trust Management Plan |
Executive Summary
Presidio Trust Management Plan
Environmental Impact Statement
Record of Decision (ROD) Resolution Table of Contents Record of Decision Chapters 1-10 Attachment 1 - Mitigation Monitoring and Enforcement Program Attachment 2 - Report Accompanying the ROD Attachment 3 - Errata
|
- Back to the Top - |
|
Public Health Service Hospital Project |
Public Health Service Hospital Record of Decision (April 2007)
November 2006 Workshops – Background Binder
Wyman Residences Record of Decision (August 2006)
Public Health Service Hospital Final Supplemental Environmental Impact Statement (May 2006) Part 1 (p. 1-32) Part 2 (p. 33-79) Part 3 (p. 81-183) Part 4 (p. 184-256) Part 5 (p. 257-312) Appendix A Appendix B Appendix C Response to Comments - Part 1 (p. 1-76) Response to Comments - Part 2 (p. 77 - 122)
Notice of Availability of Final Supplemental Environmental Impact Statement (April 2006)
Project Update – Public Health Service Hospital (August 2004)
Public Health Service Hospital Draft Supplemental Environmental Impact Statement (August 2004) Table of Contents Summary Chapter 1: Purpose and Need Chapter 2: Alternatives p. 37 to 53 Chapter 2: Alternatives p. 54 to 71 Chapter 3: Affected Environment and Environmental Consequences p. 73 to 113 Chapter 3: Affected Environment and Environmental Consequences p. 114 to 153 Chapter 3: Affected Environment and Environmental Consequences p. 154 to 173 Chapter 3: Affected Environment and Environmental Consequences p. 174 to 193 Chapter 3: Affected Environment and Environmental Consequences p. 194 to 213 Chapter 3: Affected Environment and Environmental Consequences p. 214 to 244 Chapter 4: Consultation List of Acronyms, Glossary, Index Appendix A: Response to Comments Appendix B: Transportation Technical Memoranda
Notice of Intent to Prepare a Supplemental Environmental Impact Statement and Conduct Public Scoping
Project Update – Public Health Service Hospital (February 2004)
Environmental Assessment for the Public Health Service Hospital (February 2004) Table of Contents and Introduction Purpose and Need Alternatives Affect Environment and Environmental Consequences Consultation and References Acronyms and Glossary Appendix A Appendix B
Public Health Service Hospital Project Scoping Materials
Public Health Service Hospital Request for Proposals (RFP) Addendum 1 Addendum 2 Addendum 3 Addendum 4 Addendum 5
Public Health Service Hospital Request for Qualification (RFQ) Public Health Service Hospital RFQ - Appendix A Cover and Table of Contents Environmental Review Summary Draft Planning and Design Guidelines Summary of Environmental Remediation Project Responsibility Chart List of Existing Tenants Overview of Exisiting Presidio of San Francisco Residential Programs and Revenue
|
- Back to the Top - |
|
Tennessee Hollow Watershed Project |
Environmental Assessment
Response to Public Comment and Final Finding of No Significant Impact
Tennessee Hollow Watershed Project Update (August 2007)
Tennessee Hollow Environmental Assessment (August 2007)
Tennessee Hollow Watershed Project Scoping Materials
Tennesse Hollow Watershed Project Summary November 2002 (as revised January 2003)
Glossary of Possible Habitat Types |
- Back to the Top -
|
|
Thornburgh-West Letterman Project |
Notice of Intent – Public Scoping for Thornburgh-West Letterman Environmental Assessment (April 2007)
- Back to the Top -
|
|
Trails and Bikeways Master Plan |
Trails and Bikeways Master Plan
- Back to the Top -
|
|
Vegetation Management Plan |
2004 Open Space Update
2003 Open Space Update
Vegetation Management Plan and Environmental Assessment Summary Chapter 1 Introduction Chapter 2 Purpose and Need Chapter 3 Vegetation Management Plan Chapter 4 Description of Project Alternatives Chapter 5 Affected Environment and Environmental Consenquences Chapter 6 Consultation and Coordination Chapter 7 References Appendices
- Back to the Top -
|
|
Walt Disney Family Museum |
Environmental Assessment (September 2006)
- Back to the Top -
|
|
Water Recycling Project |
Water Recycling Project Environmental Assessment Chapter 1 Introduction Chapter 2 Description of Alternatives Chapter 3 Environmental Analysis 3.1 Introduction 3.2 Land Use and Policy Consistency 3.3 Water Resources 3.4 Biological Resources 3.5 Cultural and Historic Resources 3.6 Hazardous Materials 3.7 Traffic 3.8 Air Quality and Odors 3.9 Noise 3.10 Geology, Soils, and Seismicity 3.11 Cumulative Effects Chapter 4 Report Preparation Appendix - Potential Occurrence of Special Status Species in Project Study Area Glossary and Acronyms
- Back to the Top -
|