Florida Department of Environmental Protection Florida Department of Environmental Protection
More Protection, Less Process
* DEP Home * About DEP * Programs * Contact * Site Map * Search
MyFlorida.com  
Programs
» Water Home
» Beaches
» Drinking Water
» Everglades
» Grants & Loans
» Ground Water
» Mining & Minerals
» Monitoring
» Special Projects
» Springs
» Stormwater
» TMDLs
» Underground Injection
» Wastewater
» Water Policy
» Watersheds
» Wetlands
Information
» Contacts
» Data
» Events
» Forms & Applications
» Publications
» Rules
Navigation
» Sitemap

 

Documents are Adobe Acrobat  files, unless indicated, and require the free Reader Software.

Get Adobe Acrobat Reader software.
Corner of tabUnderground Injection Control Corner of tabHighlights

Underground Injection Control Program

 

The Department of Environmental Protection's Underground Injection Control (UIC) program consists of a team of geologists and engineers dedicated to protecting the State of Florida's underground sources of drinking water (USDW) while maintaining the lawful option of disposal of appropriately treated fluids via underground injection wells. A USDW is defined as an aquifer that contains a total dissolved solids concentration of less than 10,000 milligrams per liter. The UIC program also is dedicated to preventing degradation of the quality of other aquifers adjacent to the injection zone. Subsurface injection, the practice of emplacing fluids in a permeable underground aquifer by gravity flow or under pressure through an injection well, is one of a variety of wastewater disposal or reuse methods used in Florida. The five classes of injection wells:

  • Class I
    Wells used to inject hazardous waste (new hazardous waste wells were banned in 1983), nonhazardous waste, or municipal waste below the lowermost USDW.
  • Class II
    Wells used to inject fluids associated with the production of oil and natural gas or fluids used to enhance hydrocarbon recovery.
  • Class III
    Wells which inject fluids for extraction of minerals (none in Florida).
  • Class IV
    Wells or septic systems which are used to dispose of hazardous or radioactive wastes into or above a USDW. (Banned in Florida.)
  • Class V
    Wells not included in the other well classes which generally inject nonhazardous fluid into or above a USDW.

There are more than 125 active Class I wells in Florida. The majority of the Class I injection facilities in Florida dispose of non hazardous, secondary-treated effluent from domestic wastewater treatment plants. At locations where hydrogeologic conditions are suitable and where other disposal methods are not possible or may cause contamination, subsurface injection below all USDWs is considered a viable and lawful disposal method. There are favorable hydrogeologic conditions in Florida where the underground formations have the natural ability to accept and confine the waste. See an illustration of a Class I municipal well.

The injection wells are required to be constructed, maintained, and operated so that the injected fluid remains in the injection zone, and the unapproved interchange of water between aquifers is prohibited. Class I injection wells are monitored so that if migration of injection fluids were to occur it would be detected before reaching the USDW. Testing is conducted on all Class I injection wells at a minimum of every five years to determine that the well structure has integrity.

For the location and permitting status of Class I wells in Florida as of November 2003, please see the Class I map and Class I table. (We are trying to improve on the resolution of the map; we appreciate your patience.) As of November 2003, the average daily flow for these wells was a little more than 361 million gallons per day; this flow is graphically represented by county.

  • Class II injection wells are regulated by the Department of Environmental Protection, Florida Geological Survey, Oil and Gas Section.
  • Class III wells are injection wells associated with the extraction of minerals. There are no Class III wells in Florida.
  • Class IV injection wells have been banned in Florida since 1982.
  • Class V injection wells are wells not included Classes I thru IV. Class V wells are used for the storage or disposal of fluids into or above a USDW. The fluid injected must meet appropriate criteria as determined by the classification of the receiving aquifer. Common types of Class V wells include air conditioning return flow wells, swimming pool drainage wells, stormwater drainage wells, lake level control wells, domestic waste wells, and aquifer storage and recovery (ASR) wells (see below). There are more than 8000 Class V wells in Florida.

Financial Responsibility

The UIC program requires applicants for Class I wells to assure, through a performance bond or other appropriate means, that resources necessary to cover post-closure monitoring and any corrective action resulting from this monitoring are available. [See s. 62-528.435(9) in the UIC rule.] Guidance on fulfilling the financial responsibility requirements is set forth in the document, "Financial Responsibility Options for Owners and Operators of Injection Wells". (This document has been scanned from an old source that has not yet been converted electronically. The information is current. If you have difficulty reading the guidance, please call the UIC program at 850.245.8644 and we will be happy to provide a hard copy.) One financial responsibility option for local governments only is set forth in the Local Government Guarantee document.

Aquifer storage and recovery (ASR)

Aquifer storage and recovery (ASR) is a mechanism for storing water underground through an injection well to be withdrawn in the future, through the same well, for beneficial purposes. Typically, water is stored during times of excess supply for use when supplies are limited. ASR wells are capable of storing treated drinking water as well as treated or raw surface or groundwater. However, whether treated or not, water injected into ASR wells must meet Florida's drinking water quality standards. The level of treatment required after storage depends on the use of the water, whether for public consumption, surface water augmentation, wetlands enhancement, irrigation, saltwater intrusion barrier, etc. Because ASR provides for the storage of water that would otherwise be lost to tide or evaporation, it represents a crucial water supply management strategy for Florida’s future. See a simplified depiction of an ASR well.

For the location and permitting status of ASR wells in Florida as of November 2003, please see the ASR map and ASR table. (We are trying to improve on the resolution of the map; we appreciate your patience.)

Get the Underground Injection Control rule.

ASR Map

ASR Table

ASR Well

UIC Forms

Groundwater Program

Last updated: October 21, 2008

  2600 Blair Stone Road M.S. 3500   Tallahassee, Florida 32399   850-245-8336 (phone) / 850-245-8356 (fax) 
DEP Home | About DEP  | Contact Us | Search |  Site Map