From the listing below, find the file you would like to download.
The document may be available in one or more file formats, as represented
by the icons on the righthand side of the listing. Click on the
icon that represents the format you wish to receive.
|
File Description |
File Date |
File Types |
|
New Source Performance Standards for Petroleum Refineries – Inadvertent Error Memorandum |
06-09-08 |
|
|
Removal of Stage II Vapor Recovery from Refueling of Corporate Fleets: Guidance Document |
11-28-07 |
|
|
Developing a Tribal Air Monitoring Program - Technical Guidance: Guidance Document |
11-06-07 |
|
|
State Implementation Plan Elements Under Clean Air Act Sections 110 (a) (1) and (2): Implementing 1997 Ozone and Fine Particle National Ambient Air Quality Standards: Guidance Memo |
10-02-07 |
|
|
Woodstove Changeout Programs: Using State Supplemental Environmental Projects: Guidance |
06-12-07 |
|
|
Boundaries for Determining 24-hour Fine Particle Attainment and Nonattainment Areas: Guidance |
06-08-07 |
|
|
Regional Haze: Guidance for Setting Reasonable Progress Goals: Cover Memo |
06-01-07 |
|
|
Regional Haze: Setting Reasonable Progress Goals: Guidance Document |
06-01-07 |
|
|
Removal of Stage II Vapor Recovery in Situations Where Widespread Use of Onboard Refueling Vapor Recovery is Demonstrated |
12-18-06 |
|
|
RACT Qs & As - Reasonably Available Control Technology (RACT): Questions and Answers |
11-20-06 |
|
|
Guidance on SIP Development and New Source Review in Areas Impacted by Fugitive Dust, Memo from E.F. Tuerk, August 16, 1977: Guidance Memo |
07-24-06 |
|
|
Model Letter Regarding State Designation of Attainment Status, Memo from D.G. Hawkins, October 7, 1977: Guidance Memo |
07-24-06 |
|
|
Guidance for the 8-Hour Ozone Flex Program |
05-18-06 |
|
|
Analyses of Event-Flagged Criteria Pollutant Data: Memo |
03-01-06 |
|
|
Guidance for Quantifying and Using Emission Reductions from Voluntary Woodstove Changeout Programs in State Implementation Plans |
02-16-06 |
|
|
Guideline for Reporting of Daily Air Quality |
02-15-06 |
|
|
Interim Guidance on Control of Volatile Organic Compounds in Ozone State Implementation Plans |
08-26-05 |
|
|
State Implementation Plans: Incorporating Bundled Emissions Reduction Measures in a State Implementation Plan: Guidance |
08-16-05 |
|
|
Maintenance Plans for Certain 8-hour Ozone Areas: Clean Air Act Section 110(a)(1): Guidance Document |
05-20-05 |
|
|
One-hour Ozone Attainment Plans: Increment of Progress: Guidance |
04-18-05 |
|
|
Ozone and Carbon Monoxide (CO) Nonattainment Areas: Early Implementation of Contingency Measures: Guidance |
04-18-05 |
|
|
New Source Review: Implementation of New Source Review Requirements in PM-2.5 Nonattainment Areas: Interim Guidance |
04-05-05 |
|
|
Excess Emissions During Startup, Shutdown, Maintenance, and Malfunctions: Policy Memo (02/15/83): K.M. Bennett, Assist. Admin. for Air, Noise and Radiation |
03-28-05 |
|
|
Excess Emissions During Startup, Shutdown, Maintenance, and Malfunctions: Policy Memo (09/28/82): K.M. Bennett, Assist. Admin. for Air, Noise and Radiation |
03-28-05 |
|
|
8-Hour Ozone and PM2.5 Nonattainment Areas: Determining the “Attainment Years” for Transportation Conformity in New Areas: Guidance |
03-25-05 |
|
|
8-hour Ozone Implementation Requirements: Limiting Nitrogen Oxides (NOx) Emissions: Guidance |
10-21-04 |
|
|
Emerging and Voluntary Measures: Incorporating Emerging and Voluntary Measures in a State Implementation Plans: Guidance |
10-21-04 |
|
|
Emission Reductions from Electric-Sector Energy Efficiency and Renewable Energy Measures: State Implementation
Plan Credits: Guidance Document |
8-11-04 |
|
|
1-Hour Ozone: Maintenance Plans: Basic Inspection and Maintenance Programs |
5-12-04 |
|
|
Using Locomotive and Truck Idling Emission Reductions for New Source Review Offsets: Technical Guidance |
1-14-04 |
|
|
Reducing Idling Emissions: Quantifying and Using Long Duration Switch Yard Locomotive Idling Emission Reductions in State Implementaion Plans and
Transportation Conformity : Technical Guidance |
1-14-04 |
|
|
Reducing Idling Emissions: Quantifying and Using Long Duration Truck Idling Emission Reductions in State Implementaion Plans and
Transportation Conformity : Technical Guidance |
1-14-04 |
|
|
Regional Haze: Estimating Natural Visibility Conditions Under the Regional Haze Rule: Guidance Document |
11-7-03 |
|
|
Regional Haze: Tracking Progress Under the Regional Haze Rule: Guidance Document |
11-7-03 |
|
|
National Air Quality Standards for Fine Particles: Guidance for Designating Areas |
4-3-03 |
|
|
2002 Base Year Emission Inventory State Implementation Planning: 8-hr Ozone, PM2.5, and Regional Haze
Program, November 18, 2002: Guidance Memorandum |
3-26-03 |
|
|
Ground Level Ozone: Compilation of States' Recommendations and Initial Regional Office Responses
on Areas That Are Not Attaining the 8-Hour Ground-Level Ozone National Ambient Air Quality Standards:
Guidance Memorandum |
3-24-03 |
|
|
8-Hour Ozone National Ambient Air Quality Standards: Extension for States and Tribes to Submit Air Quality
Designation Recommendations :Memorandum |
3-5-03 |
|
|
Ozone: Emission Inventories: 1992 Memorandum on SIP Emission Inventories (1990 Base Year) |
1-29-03 |
|
|
Ozone: Marginal Ozone Nonattainment Areas: Procedures for Processing Bump Ups and Extension Requests |
1-27-03 |
|
|
8-Hour Ozone Designations: Schedule and Effect on Early Action Compacts: Guidance Document |
11-21-02 |
|
|
July 2000 Guidance on 8-Hour Ozone Designations for Indian Tribes |
11-6-02 |
|
|
March 2000 Boundary Guidance on Air Quality Designations for the 8-Hour Ozone National Ambient Air Quality Standards |
11-6-02 |
|
|
Memorandum to Chief, Air Quality Bureau, State of New Mexico |
9-20-02 |
|
|
Memorandum to Director, Utah Division of Air Quality |
9-20-02 |
|
|
State Implementation Plan Call: Reducing Nitrogen Oxides Stationary Reciprocating Internal
Combustion Engines: Memorandum |
9-19-02 |
|
|
One-Hour Ozone Nonattainment: Mid-Course Review Guidance for
the 1-hour Ozone Nonattainment Areas that Rely on Weight-of-evidence
for Attainment Demonstrations: Guidance Memo |
4-4-02 |
|
|
Section 126 Rule: Deadlines for Electric Generating Units
and Non-Electric Generating Units:Memorandum |
1-18-02 |
|
|
State Implementation Plans (SIPs): Policy Regarding Excess Emissions During Malfunctions, Startup and Shutdown: Clarification Memo. |
12-05-01 |
|
|
Limited Maintenance Plan for PM10: Guidance Memorandum |
8-21-01 |
|
|
Limited Maintenance Plan for PM10: Critical Design Value Estimation
and its Applications |
8-21-01 |
|
|
Ozone Flex Program: Memorandum and Guidelines |
6-22-01 |
|
|
Tier 2/Gasoline Sulfur Refinery Projects: Guidance Document/BACT
and LAER for Emissions Nitrogen Oxides and Volatile Organic
Compounds: Cover Memo |
1-19-00 |
|
|
Tier 2/Gasoline Sulfur Refinery Projects: Guidance Document/BACT
and LAER for Emissions Nitrogen Oxides and Volatile Organic
Compounds: Supplemental Report |
1-19-00 |
|
|
Stationary Sources: Voluntary Measures Policy |
1-19-00 |
|
|
Economic Incentive Programs: Improving Air Quality With Economic
Incentive Programs: Final Guidance |
1-19-00 |
|
|
Methodology for Measuring Oxides of Nitrogen |
9-28-00 |
|
|
Status of State Plans for Municipal Solid Waste Landfills |
8-23-00 |
|
|
Stationary Source Emission Reductions: Draft Voluntary Measures
Policy: Draft Policy |
6-12-00 |
|
|
Stationary Source Emission Reductions: Draft Voluntary Measures
Policy: Transmittal Letter |
6-12-00 |
|
|
Use of Collocated PM2.5 Data and Parameter Occurrence Codes |
2-7-00 |
|
|
Additional Guidance on PM2.5 Cassette Handling and Transportation |
2-7-00 |
|
|
1-hour Ozone Attainment Demonstrations and Tier 2/Sulfur Rulemaking:
November 1999 Guidance Memo |
1-10-00 |
|
|
Guidance on the Reasonably Available Control Measures (RACM)
Requirement and Attainment Demonstration Submissions for Ozone
Nonattainment Areas |
12-2-99 |
|
|
State Implementation Plans (SIPs): Policy Regarding Excess
Emissions During Malfunctions, Startup, and Shutdown |
11-2-99 |
|
|
Status of State Plans for Municipal Solid Waste landfills |
9-30-99 |
|
|
Economic Incentive Program Guidance: Draft Guidance |
9-9-99 |
|
|
Guideline for Reporting of Daily Air Quality |
7-23-99 |
|
|
Guideline for Developing an Ozone Forecasting Program |
7-23-99 |
|
|
Emissions Inventory Guidance for Implementation of Ozone and
Particulate Matter National Ambient Air Quality Standards (NAAQS)
and Regional Haze Regulations - Cover Memo |
7-8-99 |
|
|
Designations for the 8-hour ozone National Ambient Air Quality
Standard |
6-25-99 |
|
|
EPA letter to Governors on interim final stay on section 126
petitions for reducing interstate ozone transport |
6-14-99 |
|
|
MACT/Title V and Title I/Title V Interface Issues |
5-26-99 |
|
|
Guideline on Data Handling Conventions for the PM NAAQS -
Cover Memo |
5-11-99 |
|
|
Guideline on Data Handling Conventions for the PM NAAQS |
5-11-99 |
|
|
"Transport Policy" -- Notice of Proposed Interpretation and
Request for Comments to Allow Areas Affected by Transport of
Pollutants from Upwind Areas more time to meet the One-Hour
Ground-Level Ozone Air Quality Standard |
3-23-99 |
|
|
Guideline on Data Handling Conventions for the 8-Hour Ozone
NAAQS |
12-11-98 |
|
|
Guideline for Reporting of Daily Air Quality - Pollutant Standards
Index, draft document |
12-9-98 |
|
|
Proposed Implementation Guidance for the Revised Ozone and
Particulate Matter (PM) National Ambient Air Quality Standards
(NAAQS) and the Regional Haze Program |
11-17-98 |
|
|
Proposed Implementation Guidance for the Revised Ozone and
Particulate Matter (PM) National Ambient Air Quality Standards
(NAAQS) and the Regional Haze Program |
8-18-98 |
|
|
-- Notice of Availability |
|
|
|
Second Extension of January 25,1995 Potential to Emit Transition
Policy and Clarification of Interim Policy |
7-21-98 |
|
|
Policy -- Extending the Date to Meet Ozone Standards for Areas
Affected by Transport for Upwind Areas |
7-17-98 |
|
|
--- Cover Memo |
|
|
|
--- Fact Sheet |
|
|
|
Re-Issue of Early Planning Guidance for the Revised Ozone
and Particulate Matter (PM) National Ambient Air Quality Standards
(NAAQS) |
6-17-98 |
|
|
Memo announcing Interim Air Quality Policy on Wildland and
Prescribed Fires |
5-19-98 |
|
|
Interim Air Quality Policy on Wildland and Prescribed Fires |
5-19-98 |
|
|
Guidance on Mitigation of Impact to Small Business while Implementing
Air Quality Standards and Regulations |
4-30-98 |
|
|
EPA Guideline Series, CTG, Control of Volatile Organic Compound
Emissions from Coating Operations at Aerospace Manufacturing
and Rework Operations |
3-24-98 |
|
|
Guidance for Implementing the 1-Hour Ozone and Pre-Existing
PM10 NAAQS |
1-8-98 |
|
|
Project XL Study Regarding Preconstruction PSD Monitoring
Requirement |
1-13-98 |
|
|
Interim use of PM10 as a surrogate for PM2.5 in meeting NSR |
10-24-97 |
|
|
Guidance for Network Design and Optimum Site Exposure for
PM2.5 and PM10 Draft Document |
3-13-97 |
|
|
Graphics for Section 3 of PMSITING.PDF Caution - Large
file! |
3-24-97 |
|
|
Summary of Reqs, Sec 111(d) State Plans for Implementing MSW
Landfill Emiss. Guidelines |
12-5-96 |
|
|
Draft CTG - VOCs from Aerospace Coating Oper. |
10-16-96 |
|
|
Addendum to CTG for Wood Furniture Manufacturing Operations |
10-7-96 |
|
|
NESCAUM Draft NOx Budget Model Rule Please note: this is not
an EPA Rule! |
9-4-96 |
|
|
CTG Shipbuilding and Ship Repair |
8-29-96 |
|
|
MSW LANDFILL NSPS AND EG; ISSUES & ANSWERS |
8-15-96 |
|
|
Natural Events Policy Memo (5/30/96) |
6-6-96 |
|
|
Final Wood Furniture Manf. & Oper. CTG |
5-17-96 |
|
|
Draft guidance-perf. partnership agreements |
4-17-96 |
|
|
summary of NOx policy documents for 1990 CAA |
3-28-96 |
|
|
credit memo attachment |
3-11-96 |
|
|
update credit 15% ROP for Reduc from AIM Rule |
3-6-96 |
|
|
Latest activities relating to the Open Market Trading Rule
for ozone (2/26/96) |
2-28-96 |
|
|
Draft Summary of OMTR Public Comments |
2-16-96 |
|
|
Letter clarifying VOC definition policy (1/26/95) |
2-22-96 |
|
|
CO Attainment Determination Policy (10/30/95) |
10-30-95 |
|
|
Summary of State NOx RACT Rules |
10-17-95 |
|
|
Nox emission budget concept |
9-22-95 |
|
|
Clarify NOx Substitution |
8-30-95 |
|
|
Q's and A's NOx Emission Policy |
8-30-95 |
|
|
Draft CTG for Wood Furniture Operations |
8-28-95 |
|
|
Innovative Control Technology |
8-24-95 |
|
|
Revised process NOx exemptions |
8-24-95 |
|
|
Ohio NOx Q's and A's |
8-24-95 |
|
|
NOx RACT cost effective control technology |
8-24-95 |
|
|
RACT for repowering utility boilers |
8-24-95 |
|
|
Fuel switching to meet RACT for Nox |
8-24-95 |
|
|
Effect of EPA granting NOx exemption |
8-23-95 |
|
|
March 2,1995 Mary Nichols Policy |
7-31-95 |
|
|
CAAAC Subcomm on Econ Incentives Meeting Summaries on OMTR |
7-6-95 |
|
|
Regulatory Sched for Consumer & Commercial Products under
Sec 183(e) (6/22/95) |
7-19-95 |
|
|
Reg.Sched.for Cons. and Commer. Prod. 183(e) |
6-21-95 |
|
|
Guidance for Removing Areas from N.E. OTR |
5-30-95 |
|
|
Guidance on Nonattainment Areas Currently meeting the Ozone
NAAQS |
5-15-95 |
|
|
Ozone Nonattainment Planning Decentralization of Rule Effectiveness
Policy. |
5-9-95 |
|
|
15 percent and I/M memo of 5/5/95. |
5-9-95 |
|
|
De Minimus Value for NOx RACT |
5-23-95 |
|
|
15% rate of progress plan additional guid. |
5-9-95 |
|
|
Criteria for Attain. |
3-13-95 |
|
|
Ozone Attainment |
3-6-95 |
|
|
Contract/Temp Operat. and Title V(11/16/94) |
2-13-95 |
|
|
Letter on Reg. Air Pol. & TSP(6/14/93) |
2-24-95 |
|
|
105 Grant/Fee Transition Memo(7/21/94) |
2-23-95 |
|
|
De Minimis Values for NOx |
2-9-95 |
|
|
Section 182 NOx Exemptions |
2-8-95 |
|
|
Revised Capture Efficiency Guidance |
2-9-95 |
|
|
Bakery RACT Requirements |
2-8-95 |
|
|
Scope of Nitrogen Dioxide Exemptions |
1-19-95 |
|
|
Credit for the 15% plans for AIM |
11-21-94 |
|
|
Ozone Attain dates for Overwhelming |
9-1-94 |
|
|
Final Nov 94 SIP Submittal Policy for Ozone |
9-1-94 |
|
|
SIP Submittal Guidance (Act Deadlines) |
9-1-94 |
|
|
ACT for Offset Lithographic Printing Furniture |
7-12-94 |
|
|
Prelim Draft Model Rule for Wood |
7-6-94 |
|
|
NOx RACT Findings Letters |
6-27-94 |
|
|
ACT for Industrial Waste Water |
5-19-94 |
|
|
ACT for Ind. Cleaning Solvents-Figures |
5-18-94 |
|
|
ACT for Ind. Cleaning Solvents-Chapters |
5-18-94 |
|
|
ACT for Shipbuilding & Repairs - Figures |
5-17-94 |
|
|
ACT for Shipbuilding & Repairs - Chapters |
5-17-94 |
|
|
Auto Refinishing Alt. Control Techniques |
5-19-94 |
|
|
Policy Memo on Fugitive Emissions |
4-25-94 |
|
|
PM-10 Innovative Strategies Document |
2-17-94 |
|
|
Appendix to GROWTH.ZIP - 15% Plan |
2-22-94 |
|
|
Growth,Project.,Control Strat. - 15% Plan |
2-22-94 |
|
|
Relationship between others & 15% Plan |
2-22-94 |
|
|
Compliance and Enforcement - 15% Plan |
2-22-94 |
|
|
Adjusted Base Year Inventory - 15% Plan |
2-22-94 |
|
|
Corrected Ver. of Post-1996 SIP Guid. |
2-22-94 |
|
|
File #5 DRAFT CTG - Batch Processing |
2-7-94 |
|
|
File #4 DRAFT CTG - Batch Processing |
2-7-94 |
|
|
File #3 DRAFT CTG - Batch Processing |
2-7-94 |
|
|
File #2 DRAFT CTG - Batch Processing |
2-7-94 |
|
|
File #1 DRAFT CTG - Batch Processing |
2-7-94 |
|
|
Integrated Rule Effectiveness Guidance |
1-24-94 |
|
|
NOx Substitution Guidance |
1-5-94 |
|
|
Final NOx Exemption Guidance/Trans Memo |
12-27-93 |
|
|
Applicability of NOx Requirements Sect. 182f |
12-15-93 |
|
|
Industrial Wastewater CTG |
12-1-93 |
|
|
NOx Substitution Guidance |
12-15-93 |
|
|
Request for Redesignation |
10-7-93 |
|
|
Part 4 - VOC Policy Memo System(5/13/93) |
5-10-93 |
|
|
Part 3 - VOC Policy Memo System(5/13/93) |
5-10-93 |
|
|
Part 2 - VOC Policy Memo System(5/13/93) |
5-10-93 |
|
|
Part 1 - VOC Policy Memo System(5/13/93) |
4-29-93 |
|
|
MERC - Scrappage Credit Guidance |
3-1-93 |
|
|
MERC - Bus Credit Guidance |
3-1-93 |
|
|
MERC - Fleet Credit Guidance |
3-1-93 |
|
|
Mobile Source Emission Reduction Credits |
2-8-93 |
|
|
Final Trip Reduction Guidance. |
1-5-93 |
|
|
Final SIP Processing Memo |
7-21-92 |
|
|
Emiss. Invent. Req. for Ozone SIPs-WP6 |
5-14-91 |
|
|
Emiss. Invent. Req. for CO SIPs-WP6 |
7-17-91 |
|
|
PM SIP Development Guideline |
06-00-87 |
|