Ambrough Slough Habitat Project, Pool 10, Wisconsin
|
»
|
Aquatic Ecosystem Restoration: Section 206, Paint Creek Restoration, Waukon, Iowa
|
»
|
Asian Carp Barrier System Upper Mississippi River
|
»
|
Blackhawk Park Backwater Restoration Project , Victory, Wisconsin
|
»
|
Bussey Lake Habitat Project, Guttenberg, Iowa
|
»
|
Capoli Slough Habitat Project, Pool 9, Wisconsin
|
»
|
Christine and Hickson Dams
|
»
|
Cold Springs Habitat Project, Crawford County, Wis.
|
»
|
Conway Lake Habitat Project, Lansing, Iowa
|
»
|
Drayton Dam Habitat Restoration, Drayton, North Dakota
|
»
|
Dresbach Island Revegetation Project
|
»
|
East Channel Habitat Project, La Crescent, Minn./Wis.
|
»
|
Endangered Species - Conservation of Native Mussels
|
»
|
Environmental Infrastructure Assistance - City of Garrison and Kathio Township, Minnesota
|
»
|
Environmental Infrastructure Assistance Program: Section 219 - Devils Lake and All of North Dakota
|
»
|
Environmental Infrastructure Assistance Program: Section 219 at Central Lakes, Goodview, Grand Rapids, Willmar, Minnesota
|
»
|
Environmental Infrastructure Assistance Program: St. Croix Falls, Wisconsin
|
»
|
Fargo-Moorhead and Upstream Feasibility Study
|
»
|
Feasibility Study: Blue Earth River Basin in Minnesota and Iowa
|
»
|
Finger Lakes Habitat Project , Wabasha, Minnesota
|
»
|
General Investigations: Hydropower, Crown Hydro, Minneapolis, Minnesota
|
»
|
General Investigations: Hydropower, Ford Plant, Minneapolis, Minnesota
|
»
|
Grand Marais River Aquatic Ecosystem Restoration
|
»
|
Guttenberg Waterfowl Ponds Habitat Project, Iowa
|
»
|
Habitat Restoration: Mississippi River, Pool 8 Islands Phase III, Wisconsin/Minnesota
|
»
|
Habitat Restoration: Mississippi River, Clear (Finger) Lake, Pool 5, Minnesota
|
»
|
Harpers Slough Habitat Project, Pool 9, Iowa
|
»
|
Hay Creek Aquatic Ecosystem Restoration - Roseau County, Minnesota
|
»
|
Indian Slough Habitat Project, Buffalo County, Wis.
|
»
|
Integrated Watershed Study: Minnesota River Basin in Minnesota, South Dakota, North Dakota and Iowa
|
»
|
Island 116 Channel Closure & Shoreline Stabilization
|
»
|
Island 42 Habitat Project, Wabasha County, Minn.
|
»
|
Kinnickinnic River Aquatic Ecosystem Restoration
|
»
|
Lake Onalaska Habitat Project, La Crosse, Wisconsin
|
»
|
Lake Winneshiek Habitat Project, Ferryville, Wis.
|
»
|
Lansing Big Lake Habitat Project, Lansing, Iowa
|
»
|
Long Lake Habitat Project , Trempealeau, Wisconsin
|
»
|
Long Meadow Lake Habitat Project, Bloomington, Minn.
|
»
|
Lower St. Anthony Falls Rapids Restoration, Mississippi River, Minneapolis, Minn.
|
»
|
Marsh Lake Ecosystem Restoration Feasibility Study, Lac Qui Parle Wildlife Area, MN
|
»
|
McGregor Lake Habitat Project, Prairie du Chien, Wisconsin
|
»
|
Minnehaha Creek Watershed Study
|
»
|
Mississippi River Bank Stabilization Habitat Project, Minn/Wis/Iowa
|
»
|
Mississippi River Locks and Dams Nos. 2-10 Embankment Rehabilitation
|
»
|
Mississippi River Recreation and Environmental Stewardship, Eau Galle Dam
|
»
|
Mississippi River: Lock & Dam 3 Navigation Safety and Embankments, Minnesota and Wisconsin
|
»
|
Mud Lake Water Management
|
»
|
North Ottawa Impoundment Project, Grant County, Minn.
|
»
|
Orr, Minnesota Water Line Replacement - Section 569 Environmental Infrastructure Program
|
»
|
Painter Creek Habitat Restoration, Minnehaha Creek, Minnesota
|
»
|
Peterson Lake Habitat Project, Wabasha, Minnesota
|
»
|
Pigs Eye Habitat Restoration Lake, St. Paul, Minnesota
|
»
|
Polander Lake Habitat Project, Winona, Minnesota
|
»
|
Pool 8 Islands Phase I Habitat Project, Wisconsin
|
»
|
Pool 8 Islands Phase II Habitat Project, Stoddard, Wis.
|
»
|
Pool 9 Island Habitat Project, Wisconsin
|
»
|
Pool Slough Habitat Project, New Albin, Iowa
|
»
|
Reconnaissance Report: Baraboo/Wisconsin River
|
»
|
Reconnaissance Study: Minnesota River Basin in MN, SD, IA and ND
|
»
|
Recreational Boating Study of the Mississippi River, Pools 4 to 9, Summer 2003
|
»
|
Red Lake River/Zah Gheeng Marsh Projects, Clearwater County, Minn.
|
»
|
Red River of the North Basin: Basin-Wide Watershed Management Planning
|
»
|
Red River of the North Basin: Minnesota, North Dakota, South Dakota and Manitoba, Reconnaissance Study
|
»
|
Rice Lake Habitat Project, Savage, Minnesota
|
»
|
River Resource Values and Expectation
|
»
|
Ruffy Brook Aquatic Ecosystem Restoration, Clearwater County, Minnesota
|
»
|
Sand Hill River Aquatic Ecosystem Restoration, Minn.
|
»
|
Small Scale Drawdown Habitat Project, Buffalo City, Wis.
|
»
|
South Washington Watershed District
|
»
|
Spring Lake Islands Habitat Project, Buffalo City, Wis.
|
»
|
Spring Lake Peninsula Habitat Project, Buffalo City, Wis.
|
»
|
St. Croix Headwaters Watershed Study, Wisconsin
|
»
|
St. Croix River: Endangered Mussel Conservation - Zebra Mussel Control
|
»
|
St. Croix Watershed Reconnaissance Study
|
»
|
Streambank Protection: Section 14 Minnehaha Creek WPA Walls, Minnesota
|
»
|
Streambank Protection: Section 14, Barnes County, Kathryn, North Dakota
|
»
|
Streambank Protection: Section 14, Pug Hole Lake, Minnesota
|
»
|
Streambank Protection: Section 14, Sartell, Minnesota
|
»
|
Sturgeon Lake, Pine County, Minnesota, Wastewater Collection and Treatement Facility
|
»
|
Sunrise River Watershed Study, Minnesota
|
»
|
Trempealeau National Wildlife Refuge, Trempealeau, Wis
|
»
|
Upper Mississippi River - Illinois Waterway System Navigation Study
|
»
|
Upper St. Croix Lake Sanitary District Wastewater Collection Systems Improvement Project
|
»
|
WKTY-AM Study Area
|
»
|
Western Flood Control Sites - Minnesota: Lake Traverse, Orwell Lake, Hwy 75 - Bigstone, Lac qui Parle
|
»
|
Western Flood Control Sites – North Dakota: Lake Ashtabula, Homme Lake Souris River
|
»
|
Wild Rice River (MN) Feasibility Study
|
»
|
Wild Rice River Aquatic Ecosystem Restoration, Minn.
|
»
|
Zebra Mussels and Management Implications for Endangered Freshwater Mussels on the Upper Mississippi River System
|
|
|
|
St. Croix River: Endangered Mussel Conservation - Zebra Mussel Control
Location/Description
|
Zebra mussels (Dreissena polymorpha) in the Upper Mississippi River are a significant threat to the continued survival of the endangered Higgins' eye pearly mussel (Lampsilis higginsii) and winged mapleleaf (Quadrula fragosa). Management of zebra mussels may include measures to manage dispersal of zebra mussels, reduce/manage zebra mussels already present and prevent future spread of zebra mussels and/or other exotics. Alternatives to be studied will include large- and small-scale alterations of the habitat conditions, closing portions of the system to recreational and/or commercial traffic, cleaning/coating technologies and barriers to prevent transport of zebra mussels.
The St. Paul District and the Engineer Research and Development Center in Vicksburg, Miss., are conducting the feasibility study in cooperation with the U.S. Fish and Wildlife Service; U.S. Geological Survey; National Park Service; Minnesota, Wisconsin and Iowa departments of natural resources; and Great Lakes Indian Fish and Wildlife Commission. Public and stakeholder meetings will be held with commercial shipping interests; recreational boating interests; and regional, county and local interests. Recommended management alternatives that fall outside the Corps' existing authorities would need to be implemented by others.
|
Status
|
A feasibility study for the management of zebra mussels in the St. Croix River and connecting Mississippi River pools began in 2006. A preliminary risk-based model will evaluate the most likely pathway for further zebra mussel invasion, estimate long-term population characteristics and identify sensitive areas and potential ecological consequences. The model is being refined in 2008 to develop and evaluate potential management actions, such as controlling dispersal in the St. Croix River basin and managing existing zebra mussel populations.
A decision support model is being developed to determine triggers and criteria for relocation and/or artificial propagation of winged mapleleaf mussels if zebra mussel control is only partially effective and/or determined to be not feasible. A workshop to implement a risk-based decision framework on this issue is scheduled for Oct. 22-23, 2008, in St. Paul, Minn.
|
Authority
|
The study is being conducted under the authority of Section 216 of the Flood Control Act of 1970, which authorizes investigations for modification of completed projects or their operation when found advisable as a result of significantly changed physical or economic conditions and for improving the quality of the environment in the overall public interest. The approved Section 905(b) reconnaissance report recommended a $2.2 million feasibility study at full federal expense to investigate zebra mussel control measures in the Upper Mississippi and Illinois waterways, including the St. Croix River. As stated in the final biological opinion for the operation and maintenance of the Upper Mississippi River 9-foot navigation channel, the study must comply with Section 7(a)(2) of the 1973 Endangered Species Act.
|
Fiscal Years 2006-11
|
Through fiscal year 2007 $470,000
Fiscal year 2008 $246,000
Balance to complete $1,544,000
Total estimated cost (100 percent federal)
$2.26 million
|
|
|