Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Albeni Cove Bank Stabilization Project
Oldtown, Bonner County, Idaho
|
Operations |
Finding of No Significant Impact
|
08-Aug-2008 |
|
Nancy.T.Chin@usace.army.mil, Project Manager
Jeffrey.C.Laufle@usace.army.mil, Environmental Coordinator
|
|
Operations |
Final Environmental Assessment
|
28-Jul-2008 |
|
Nancy.T.Chin@usace.army.mil, Project Manager
Jeffrey.C.Laufle@usace.army.mil, Environmental Coordinator
|
|
Operations |
Clean Water Act 404(b)(1) Evaluation
|
01-Apr-2008 |
April 10, 2008 |
Nancy.T.Chin@usace.army.mil, Project Manager
Jeffrey.C.Laufle@usace.army.mil, Environmental Coordinator
|
|
Operations |
Clean Water Act Section 404 Public Notice
|
01-Apr-2008 |
APril 10, 2008 |
Nancy.T.Chin@usace.army.mil, Project Manager
Jeffrey.C.Laufle@usace.army.mil, Environmental Coordinator
|
Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Bonners Ferry Sewage Treatment Plant Levee Rehabilitation
Bonners Ferry, Boundary County, Idaho
|
Operations |
Finding of No Significant Impact
|
14-Sep-2007 |
N/A |
Lester.E.Soule@usace.army.mil, Project Manager
Charles.J.Ebel@usace.army.mil, Environmental Coordinator
|
|
Operations |
Final Environmental Assessment
|
14-Sep-2007 |
N/A |
Lester.E.Soule@usace.army.mil, Project Manager
Charles.J.Ebel@usace.army.mil, Environmental Coordinator
|
|
Operations |
Notice of Preparation
|
15-Aug-2007 |
7-Sep-2007 |
Lester.E.Soule@usace.army.mil, Project Manager
Charles.J.Ebel@usace.army.mil, Environmental Coordinator
Jeffrey.C.Laufle@usace.army.mil , Environmental Coordinator
|
|
Operations |
Notice of Preparation - Erratum
|
15-Aug-2007 |
7-Sep-2007 |
Lester.E.Soule@usace.army.mil, Project Manager
Charles.J.Ebel@usace.army.mil, Environmental Coordinator
Jeffrey.C.Laufle@usace.army.mil , Environmental Coordinator
|
Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Callahan Creek Levee Rehabilitation Project
Lincoln County, Montana
|
Operations - PL84-99 |
Final Environmental Assessment and Finding of No Significant Impact
|
15-Jul-2008 |
|
Charles.H.Ifft@usace.army.mil, Project Manager
Jeffrey.F.Dillon@usace.army.mil, Environmental Coordinator
|
|
Operations - PL84-99 |
Draft Environmental Assessment and FONSI
|
16-Apr-2008 |
9-May-2008 |
Charles.H.Ifft@usace.army.mil, Project Manager
Jeffrey.F.Dillon@usace.army.mil, Environmental Coordinator
|
Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Cedar River 205 Levee Rehabilitation
Renton, King County, Washington
|
Operations - PL84-99 |
Notice of Preparation
|
26-Jun-2007 |
11-July-2007 |
Stephen.R.Pierce@usace.army.mil, Project Manager
Evan.R.Lewis@usace.army.mil, Environmental Coordinator
|
Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Cedar River Side Channel Replacement
King County, Washington
|
Operations - PL 84-99 |
Notice of Preparation and Clean Water Act Public Notice
|
06-Jun-2008 |
23-Jun-2008 |
Stephen.R.Pierce@usace.army.mil, Project Manager
Evan.R.Lewis@usace.army.mil, Environmental Coordinator
Evan.R.Lewis@usace.army.mil , Environmental Coordinator
|
Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Chehalis-Centralia Airport Levee
Lewis County, Washington
|
Operations - PL84-99 |
Notice of Preparation
|
07-Aug-2008 |
22-Aug-2008 |
David.N.Spicer@usace.army.mil, Project Manager
Rhonda.S.Lucas@usace.army.mil, Environmental Coordinator
|
Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Chief Joseph Dam Dissolved Gas Abatement
Douglas and Okanogan Counties, Washington
|
Operations |
Final Prototype Spill Test FONSI
|
19-Apr-2007 |
N/A |
Julie.L.Allen@usace.army.mil, Project Manager
Jeffrey.C.Laufle, Environmental Coordinator
|
|
Operations |
Final Prototype Spill Test EA
|
19-Apr-2007 |
N/A |
Julie.L.Allen@usace.army.mil, Project Manager
Jeffrey.C.Laufle, Environmental Coordinator
|
|
Operations |
Draft Prototype Spill Test EA
|
27-Mar-2007 |
12-Apr-2007 |
Julie.L.Allen@usace.army.mil, Project Manager
Jeffrey.C.Laufle, Environmental Coordinator
|
Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Commencement Bay, Pier 23 Repair
Pierce County, Washington
|
Support for Others |
Notice of Preparation
|
02-Sep-2008 |
01-Oct-2008 |
Benjamin.K.Tsang@usace.army.mil, Project Manager
Jeffrey.C.Laufle@usace.army.mil, Environmental Coordinator
|
|
Support for Others |
Finding of No Significant Impact
|
07-Jan-2005 |
|
William.A.Goss@usace.army.mil, Project Manager
Jeffrey.C.Laufle@usace.army.mil, Environmental Coordinator
|
|
Support for Others |
Final Environmental Assessment
|
01-Dec-2004 |
|
William.A.Goss@usace.army.mil, Project Manager
Jeffrey.C.Laufle@usace.army.mil, Environmental Coordinator
|
Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Deming PL84-99 Levee Rehabilitiation
Nooksack River, Whatcom County, Washington
|
Operations - PL84-99 |
Notice of Preparation
|
22-Aug-2008 |
September 1, 2008 |
David.N.Spicer@usace.army.mil, Project Manager
Andrea.K.Cummins@usace.army.mil, Environmental Coordinator
Michael.R.Scuderi@usace.army.mil , Environmental Coordinator
|
|
Operations - PL84-99 |
Notice of Preparation - Plan Sheets
|
22-Aug-2008 |
September 1, 2008 |
David.N.Spicer@usace.army.mil, Project Manager
Andrea.K.Cummins@usace.army.mil, Environmental Coordinator
Michael.R.Scuderi@usace.army.mil , Environmental Coordinator
|
Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Duwamish Waterway Maintenance Dredging
King County, Washington
|
Operations |
Finding of No Significant Impact
|
07-Mar-2007 |
|
Thomas.J.Szelest@nws02.usace.army.mil, Project Manager
Evan.R.Lewis@usace.army.mil, Environmental Coordinator
|
|
Operations |
Biological Assessment
|
07-Mar-2007 |
|
Thomas.J.Szelest@nws02.usace.army.mil, Project Manager
Evan.R.Lewis@usace.army.mil, Environmental Coordinator
|
|
Operations |
Final Environmental Assessment
|
07-Mar-2007 |
|
Thomas.J.Szelest@nws02.usace.army.mil, Project Manager
Evan.R.Lewis@usace.army.mil, Environmental Coordinator
|
|
Operations |
Draft Environmental Assessment and FONSI
|
08-Aug-2006 |
07-Sep-2006 |
Thomas.J.Szelest@nws02.usace.army.mil, Project Manager
Evan.R.Lewis@usace.army.mil, Environmental Coordinator
|
Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Gog-le-hi-te II Real Estate and Civil Works Actions
Tacoma, Pierce County, Washington
|
Real Estate |
Finding of No Significant Impact and Final Environmental Assessment
|
18-Jan-2008 |
|
Brenda.M.Bachman@usace.army.mil, Project Manager
Evan.R.Lewis@usace.army.mil, Environmental Coordinator
|
|
Real Estate |
Draft Environmental Assessment and FONSI
|
29-Jun-2007 |
30-Jul-2007 |
Brenda.M.Bachman@usace.army.mil, Project Manager
Evan.R.Lewis, Environmental Coordinator
|
Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Granite Creek Levee Rehabilitation Project
Lincoln County, Montana
|
Operations - PL84-99 |
Final Environmental Assessment and Finding of No Significant Impact
|
15-Jul-2008 |
|
Charles.H.Ifft@usace.army.mil, Project Manager
Jeffrey.F.Dillon@usace.army.mil, Environmental Coordinator
|
|
Operations - PL84-99 |
Draft Environmental Assessment and FONSI
|
16-Apr-2008 |
9-May-2008 |
Charles.H.Ifft@usace.army.mil, Project Manager
Jeffrey.F.Dillon@usace.army.mil, Environmental Coordinator
|
Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Grays Harbor and Chehalis River Navigation Channel Maintenance Dredging and Disposal
Grays Harbor County, Washington
|
Operations |
Finding of No Significant Impact
|
17-Oct-2006 |
Final |
Hiram.T.Arden, Project Manager
Stephen.G.Martin@usace.army.mil, Environmental Coordinator
|
|
Operations |
Appendices
|
17-Oct-2006 |
Final |
Hiram.T.Arden, Project Manager
Stephen.G.Martin@usace.army.mil, Environmental Coordinator
|
|
Operations |
Final Environmental Assessment
|
17-Oct-2006 |
Final |
Hiram.T.Arden, Project Manager
Stephen.G.Martin@usace.army.mil, Environmental Coordinator
|
|
Operations |
Draft Environmental Assessment and FONSI
|
28-Jul-2006 |
26-Aug-2006 |
Hiram.T.Arden, Project Manager
Stephen.G.Martin@usace.army.mil, Environmental Coordinator
|
|
Operations |
Public Notice
|
28-Jul-2006 |
26-Aug-2006 |
Hiram.T.Arden, Project Manager
Stephen.G.Martin@usace.army.mil, Environmental Coordinator
|
Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Grays Harbor Test Dredge
Grays Harbor County, Washington
|
Operations |
Final Environmental Assessment
|
04-Apr-2007 |
N/A |
Hiram.T.Arden, Project Manager
Nancy.C.Gleason@usace.army.mil, Environmental Coordinator
Stephen.G.Martin@usace.army.mil , Environmental Coordinator
|
|
Operations |
Finding of No Significant Impact
|
04-Apr-2007 |
N/A |
Hiram.T.Arden, Project Manager
Nancy.C.Gleason@usace.army.mil, Environmental Coordinator
Stephen.G.Martin@usace.army.mil , Environmental Coordinator
|
|
Operations |
Public Notice
|
19-Jan-2007 |
19-Feb-2007 |
Hiram.T.Arden, Project Manager
Nancy.C.Gleason@usace.army.mil, Environmental Coordinator
Stephen.G.Martin@usace.army.mil , Environmental Coordinator
|
|
Operations |
Draft Environmental Assessment
|
22-Dec-2006 |
27-Jan-2007 |
Hiram.T.Arden, Project Manager
Nancy.C.Gleason@usace.army.mil, Environmental Coordinator
Stephen.G.Martin@usace.army.mil , Environmental Coordinator
|
|
Operations |
Draft Finding of No Significant Impact (FONSI)
|
22-Dec-2006 |
27-Jan-2007 |
Hiram.T.Arden, Project Manager
Nancy.C.Gleason@usace.army.mil, Environmental Coordinator
Stephen.G.Martin@usace.army.mil , Environmental Coordinator
|
Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Green River Levee Rehabilitation Projects 2008
King County, Washington
|
Operations - PL84-99 |
Final Environmental Assessment
|
20-Jun-2008 |
|
William.P.Graney@usace.army.mil, Project Manager
Scott.V.Pozarycki@usace.army.mil, Environmental Coordinator
Andrea.K.Cummins@usace.army.mil , Environmental Coordinator
|
|
Operations - PL84-99 |
Finding of No Significant Impact
|
20-Jun-2008 |
|
William.P.Graney@usace.army.mil, Project Manager
Scott.V.Pozarycki@usace.army.mil, Environmental Coordinator
Andrea.K.Cummins@usace.army.mil , Environmental Coordinator
|
|
Operations - PL84-99 |
Notice of Preparation - Plan Sheets
|
21-May-2008 |
11-June-08 |
William.P.Graney@usace.army.mil, Project Manager
Andrea.K.Cummins@usace.army.mil, Environmental Coordinator
Scott.V.Pozarycki@usace.army.mil , Environmental Coordinator
|
|
Operations - PL84-99 |
Notice of Preparation
|
21-May-2008 |
June-11-2008 |
William.P.Graney@usace.army.mil, Project Manager
Andrea.K.Cummins@usace.army.mil, Environmental Coordinator
Scott.V.Pozarycki@usace.army.mil , Environmental Coordinator
|
Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Hoodoo Creek Bank Stabilization
Bonner County, Idaho
|
Operations |
Notice of Preparation
|
11-Apr-2008 |
12-May-2008 |
Lawr.V.Salo@usace.army.mil, Project Manager
Jeffrey.C.Laufle@usace.army.mil, Environmental Coordinator
Rhonda.S.Lucas@usace.army.mil , Environmental Coordinator
|
Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Keystone Harbor Maintenance Dredging
Island County, Washington
|
Operations |
Draft Environmental Assessment and FONSI
|
05-May-2006 |
05-Jun-2006 |
Patricia.R.Miller, Project Manager
Rustin.A.Director, Environmental Coordinator
|
Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Lake Washington Ship Canal
Seattle, King County, Washington
|
Operations |
Biological Opinion - National Marine Fisheries Service
|
31-Mar-2008 |
|
Rebecca.L.Jahns@usace.army.mil, Project Manager
Charles.J.Ebel@usace.army.mil, Environmental Coordinator
|
|
Operations |
Biological Opinion - U.S. Fish & Wildlife Service
|
01-Apr-2007 |
|
Rebecca.L.Jahns@usace.army.mil, Project Manager
Charles.J.Ebel@usace.army.mil, Environmental Coordinator
|
Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Lake Washington Ship Canal Diffuser Well Project
Seattle, King County, Washington
|
Operations |
Finding of No Significant Impact
|
26-May-2008 |
N/A |
Rebecca.L.Jahns@usace.army.mil, Project Manager
Charles.J.Ebel@usace.army.mil, Environmental Coordinator
|
|
Operations |
Final Environmental Assessment
|
26-Mar-2008 |
N/A |
Rebecca.L.Jahns@usace.army.mil, Project Manager
Charles.J.Ebel@usace.army.mil, Environmental Coordinator
|
|
Operations |
Notice of Preparation
|
01-Feb-2008 |
16-Feb-2008 |
Rebecca.L.Jahns@usace.army.mil, Project Manager
Charles.J.Ebel@usace.army.mil, Environmental Coordinator
|
Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Lightning Creek Levee Rehabilitation
Clark Fork, Bonner County, Idaho
|
Operations - PL84-99 |
Finding of No Significant Impact
|
07-Aug-2008 |
|
Charles.H.Ifft@usace.army.mil, Project Manager
Charles.J.Ebel@usace.army.mil, Environmental Coordinator
|
|
Operations - PL84-99 |
Final Environmental Assessment
|
31-Jul-2008 |
|
Charles.H.Ifft@usace.army.mil, Project Manager
Charles.J.Ebel@usace.army.mil, Environmental Coordinator
|
|
Operations - PL84-99 |
Notice of Preparation
|
10-Jun-2008 |
25-Jun-2008 |
Charles.H.Ifft@usace.army.mil, Project Manager
Charles.J.Ebel@usace.army.mil, Environmental Coordinator
|
Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Long Road Levee Repair
Lewis County, Washington
|
Operations - PL84-99 |
Notice of Preparation
|
07-Aug-2008 |
22-Aug-2008 |
David.N.Spicer@usace.army.mil, Project Manager
Rhonda.S.Lucas@usace.army.mil, Environmental Coordinator
|
Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Malmstrom Community Activities Center
Malmstrom Air Force Base, Montana
|
Military |
Draft Finding of No Significant Impact (FONSI)
|
15-Aug-2008 |
|
Steven.A.Saepoff@usace.army.mil, Project Manager
Jeffrey.F.Dillon@usace.army.mil, Environmental Coordinator
|
|
Military |
Draft Environmental Assessment
|
15-Aug-2008 |
|
Steven.A.Saepoff@usace.army.mil, Project Manager
Jeffrey.F.Dillon@usace.army.mil, Environmental Coordinator
|
Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Manchester Naval Fuel Depot Small Boat Dock Replacement
Kitsap County, WA
|
Support for Others |
Draft Environmental Assessment and Biological Evaluation
|
07-Jun-2006 |
07-Jul-2006 |
Matthew.S.Allen, Project Manager
George.A.Hart, Environmental Coordinator
|
Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Milfoil Eradication Pilot Project
Pend Oreille County, Washington
|
Aquatic Vegetation Control |
Biological Evaluation
|
28-Nov-2007 |
|
Patrick.T.Cagney2@usace.army.mil, Project Manager
Stephen.G.Martin@usace.army.mil, Environmental Coordinator
|
|
Aquatic Vegetation Control |
Finding of No Significant Impact
|
22-Jun-2007 |
|
Patrick.T.Cagney, Project Manager
|
|
Aquatic Vegetation Control |
Final Environmental Assessment
|
22-Jun-2007 |
|
Patrick.T.Cagney, Project Manager
|
|
Aquatic Vegetation Control |
Draft Environmental Assessment
|
11-May-2007 |
04-June-2007 |
Patrick.T.Cagney, Project Manager
|
Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Mud Mountain Dam
Pierce County, Washington
|
Operations |
Biological Opinion - National Marine Fisheries Service
|
30-Nov-2007 |
|
Mamie.S.Brouwer@usace.army.mil, Project Manager
Jeffrey.F.Dillon@usace.army.mil, Environmental Coordinator
|
|
Operations |
Biological Opinion - U.S. Fish & Wildlife Service
|
07-Aug-2007 |
|
Mamie.S.Brouwer@usace.army.mil, Project Manager
Jeffrey.F.Dillon@usace.army.mil, Environmental Coordinator
|
Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Olympia Harbor Maintenance Dredging and Minor Widening
Olympia, Thurston County, Washington
|
Operations |
Final EA, Appendix G - Comments & Responses
|
22-Aug-2007 |
|
Hiram.T.Arden@nws02.usace.army.mil, Project Manager
Evan.R.Lewis@nws02.usace.army.mil, Environmental Coordinator
|
|
Operations |
Finding of No Significant Impact and Final Environmental Assessment
|
22-Aug-2007 |
|
Hiram.T.Arden@nws02.usace.army.mil, Project Manager
Evan.R.Lewis@nws02.usace.army.mil, Environmental Coordinator
|
|
Operations |
Draft Environmental Assessment and FONSI
|
21-May-2007 |
20-Jun-2007 |
Hiram.T.Arden, Project Manager
Evan.R.Lewis, Environmental Coordinator
|
Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Quillayute Navigation Project Maintenance
Clallam County, Washington
|
Operations |
Finding of No Significant Impact
|
23-Nov-2005 |
|
Thomas.J.Szelest@nws02.usace.army.mil, Project Manager
Nancy.C.Gleason@usace.army.mil, Environmental Coordinator
|
|
Operations |
Final Environmental Assessment
|
01-Sep-2005 |
|
Thomas.J.Szelest@nws02.usace.army.mil, Project Manager
Nancy.C.Gleason@usace.army.mil, Environmental Coordinator
|
|
Operations |
Clean Water Act 404(b)(1) Evaluation
|
01-Jun-2005 |
|
Thomas.J.Szelest@nws02.usace.army.mil, Project Manager
Nancy.C.Gleason@usace.army.mil, Environmental Coordinator
|
Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Sandpoint Water Treatment Plant Shoreline Stabilization
Sandpoint, Bonner County, Idaho
|
Operations |
Public Notice
|
01-Nov-2007 |
01-Dec-2007 |
Richard.J.Wright@usace.army.mil, Project Manager
Nancy.C.Gleason@usace.army.mil, Environmental Coordinator
|
|
Operations |
Draft Environmental Assessment and FONSI
|
19-Oct-2007 |
19-Nov-2007 |
Richard.J.Wright@usace.army.mil, Project Manager
Nancy.C.Gleason@usace.army.mil, Environmental Coordinator
|
|
Operations |
Draft EA, Appendix B - Project Drawings
|
19-Oct-2007 |
19-Nov-2007 |
Richard.J.Wright@usace.army.mil, Project Manager
Nancy.C.Gleason@usace.army.mil, Environmental Coordinator
|
Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Shoalwater Bay Erosion Project
Pacific County, Washington
|
Civil Works |
Notice of Preparation
|
31-Oct-2007 |
30-Nov-2007 |
Steven.D.Babcock@usace.army.mil, Project Manager
Evan.R.Lewis@usace.army.mil, Environmental Coordinator
Rhonda.S.Lucas@usace.army.mil , Environmental Coordinator
|
|
Civil Works |
Draft Decision Document
|
07-Mar-2007 |
06-Apr-2007 |
Steven.D.Babcock@usace.army.mil, Project Manager
Evan.R.Lewis@usace.army.mil, Environmental Coordinator
Rhonda.S.Lucas@usace.army.mil , Environmental Coordinator
|
|
Civil Works |
Draft Decision Document - Engineering Appendix
|
07-Mar-2007 |
06-Apr-2007 |
Steven.D.Babcock@usace.army.mil, Project Manager
Evan.R.Lewis@usace.army.mil, Environmental Coordinator
Rhonda.S.Lucas@usace.army.mil , Environmental Coordinator
|
|
Civil Works |
Draft Environmental Assessment and FONSI
|
24-Jan-2007 |
28 Feb. 2007 |
Steven.D.Babcock@usace.army.mil, Project Manager
Evan.R.Lewis@usace.army.mil, Environmental Coordinator
Rhonda.S.Lucas@usace.army.mil , Environmental Coordinator
|
Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Skagit County Dike District 12 Levee Rehabilitation
Skagit County, Washington
|
Operations - PL84-99 |
Notice of Preparation
|
20-Aug-2007 |
20-Sep-2007 |
Stephen.R.Pierce@usace.army.mil, Project Manager
Evan.R.Lewis@nws02.usace.army.mil, Environmental Coordinator
|
Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Skagit County Dike District 17 Levee Rehabilitation
Skagit County, Washington
|
Operations - PL84-99 |
Notice of Preparation
|
20-Aug-2007 |
20-Sep-2007 |
Stephen.R.Pierce@usace.army.mil, Project Manager
Evan.R.Lewis@nws02.usace.army.mil, Environmental Coordinator
|
Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Skagit County Diking District 1 Levee Rehabilitation
Skagit County, Washington
|
Operations - PL84-99 |
Notice of Preparation
|
10-Aug-2007 |
10-Sep-2007 |
Stephen.R.Pierce@usace.army.mil, Project Manager
Nancy.C.Gleason@nws02.usace.army.mil, Environmental Coordinator
|
Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Skagit County Diking District 22 Levee Rehabilitation
Skagit County, Washington
|
Operations - PL84-99 |
Notice of Preparation
|
10-Aug-2007 |
10-Sept-2007 |
Stephen.R.Pierce@usace.army.mil, Project Manager
Nancy.C.Gleason@nws02.usace.army.mil, Environmental Coordinator
|
Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Skagit County Diking District 3 Levee Rehabilitation
Skagit County, Washington
|
Operations - PL84-99 |
Notice of Preparation
|
10-Aug-2007 |
10-Sept-2007 |
Stephen.R.Pierce@usace.army.mil, Project Manager
Nancy.C.Gleason@nws02.usace.army.mil, Environmental Coordinator
|
Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Snohomish River Navigation Channel, Lower and Upstream Settling Basins Maintenance Dredging, 2005-2009
Snohomish County, Washington
|
Operations |
Final Supplemental Environmental Assessment
|
28-Nov-2007 |
|
Rustin.A.Director@usace.army.mil, Project Manager
Stephen.G.Martin@usace.army.mil, Environmental Coordinator
|
|
Operations |
Notice of Preparation
|
16-Aug-2007 |
31-Aug-2007 |
Rustin.A.Director@nws02.usace.army.mil, Project Manager
Stephen.G.Martin@nws02.usace.army.mil, Environmental Coordinator
|
Project |
Type of Project |
Documents Available |
Date Issued |
Comment Period Ends |
Points of Contact |
Snoqualmie River Levee Rehabilitation
King County, Washington
|
Operations - PL84-99 |
Final Environmental Assessment
|
23-Jun-2008 |
|
Karl.Jansen.MAJ@usace.army.mil, Project Manager
Jeffrey.C.Laufle@usace.army.mil, Environmental Coordinator
Chemine.R.Jackels@usace.army.mil , Environmental Coordinator
|
|
Operations - PL84-99 |
Finding of No Significant Impact
|
23-Jun-2008 |
|
Karl.Jansen.MAJ@usace.army.mil, Project Manager
Jeffrey.C.Laufle@usace.army.mil, Environmental Coordinator
Chemine.R.Jackels@usace.army.mil , Environmental Coordinator
|
|
Operations - PL84-99 |
Notice of Preparation
|
06-May-2008 |
05-Jun-2008 |
Karl.Jansen.MAJ@usace.army.mil, Project Manager
Jeffrey.C.Laufle@usace.army.mil, Environmental Coordinator
Chemine.R.Jackels@usace.army.mil , Environmental Coordinator
|