PHMSA Gas Integrity Management
Time: 11/08/2008 04:40 PM
Topical Index
General
Rule Basics
Rule Applicability
Time Periods
Integrity Management Programs
HCA Identification
Class Location
Potential Impact Radius (PIR)
Identified Sites
Threat/Risk Analysis
Identification of Threats
Data Integration
Risk Analysis and Prioritization
Specific Threats
Third Party Damage
Cyclic Fatigue
Manufacturing and Construction Defects
ERW Pipe
Corrosion
Internal Corrosion
External Corrosion
Stress Corrosion Cracking (SCC)
Assessment
Baseline Assessment Plan (BAP)
Schedule
Assessment Methods
Internal Inspection (ILI) Tools
Direct Assessment (DA) Methods
Internal Corrosion Direct Assessment (ICDA)
External Corrosion Direct Assessment (ECDA)
Stress Corrosion Cracking Direct Assessment (SCCDA)
Pressure Testing
Other Technology
Continual Assessment and Evaluation
Reassessment Intervals
Low-Stress Reassessment
Confirmatory DA
Minimizing Environmental and Safety Risks
Integrity Issues
Remediation
Preventive and Mitigative Measures
Quality Assurance and Administrative
Performance Measures
Record Keeping
Management of Change (MOC)
Quality Assurance (QA) Process
Personnel Knowledge and Training
Regulatory and External Interaction
Communication Plan
Submittal of Program Documents
Notification
Waivers
Inspection
Enforcement
State Agencies and Intrastate Pipelines
Web Site for Gas IMP
Exceptional Performance Deviations
DOT Website
|
PHMSA Website
|
Pipeline Safety Website
|
Feedback
|
Privacy Policy
|
FOIA
Inspections
Home Page
Reference
FAQ
Key Documents
Protocols
Topical Index
Glossary
Rule Outline
In Context
Print-Friendly
My Pages
Questions and Comments
Log In...
11/08/2008 04:40 PM
Processing: 0.03 sec.
ANONYMOUS USER [2,81]
Browser: Mozilla 5.00