H.01 General Requirements (Identification of Additional Measures)
Verify that a process is in place to identify additional measures to prevent a pipeline failure and to mitigate the consequences of a pipeline failure in a high consequence area. [§192.935(a)]
H.02 Third Party Damage
Verify that the following preventive and mitigative requirements regarding threats due to third party damage have been addressed: [§192.935(b)(1) and §192.935(e)]
H.03 Pipelines Operating Below 30% SMYS
Verify that the following preventive and mitigative requirements for pipelines operating below 30% SMYS have been addressed: [§192.935(d)]
H.04 Plastic Transmission Pipeline
For plastic transmission pipelines, verify that applicable third party damage requirements have been applied to covered segments of the pipeline. [§192.935(e)]
H.05 Outside Force Damage
Verify that the operator adequately addresses threats due to outside force (e.g., earth movement, floods, unstable suspension bridge). [§192.935(b)(2)]
H.06 Corrosion
Verify that the operator takes required actions to address corrosion threats. [§192.917(e)(5)]
H.07 Automatic Shut-Off Valves or Remote Control Valves
Verify that the operator has a process to decide if automatic shut-off valves or remote control valves represent an efficient means of adding protection to potentially affected high consequence areas. [§192.935(c)]
H.08 General Requirements (Implementation of Additional Measures)
Verify that the operator has identified and implemented (or scheduled) additional measures beyond those already required by Part 192 to prevent a pipeline failure and to mitigate the consequences of a pipeline failure in a high consequence area: [§192.935(a)]
Inspections |
Home Page |
Reference |
FAQ |
Key Documents |
Protocols |
Topical Index |
Glossary |
Rule Outline |
In Context |
Print-Friendly |
My Pages |
Questions and Comments |
Log In... |