File Name |
Date |
Description |
gl80113 |
12/22/1980 |
Control Of Heavy Loads |
gl80112 |
|
IEB 80-25 Operating Problems With Target
Rock Safety Relief Valves |
gl80111 |
12/18/1980 |
IEB 80-17 Supplement 4, Failure Of Control
Rods To Insert During A Scram At A BWR |
gl80110 |
12/15/1980 |
Periodic Updating Of FSARS |
gl80109 |
12/15/1980 |
Guidelines For SEP Soil Structure Interaction
Reviews |
gl80108 |
12/09/1980 |
Emergency Planning |
gl80107 |
12/09/1980 |
BWR Scram Discharge System |
gl80106 |
11/28/1980 |
Report On ECCS Cladding Models, NUREG-0630
|
gl80104 |
11/26/1980 |
Orders On Environmental Qualification
Of Safety Related Electrical Equipment |
gl80105 |
11/25/1980 |
Implementation Of Guidance For USI A-12,
Potential For Low Fracture Toughness And
Lamellar Tearing On Component Supports |
gl80103 |
11/25/1980 |
Fire Protection - Revised Federal Register
Notice |
gl80102 |
11/25/1980 |
Commission Memorandum And Order Of May
23, 1980 (Referencing IEB 79-01b Supplement
2 - q.2 & 3 - Sept 30, 1980) |
gl80101 |
11/25/1980 |
Inservice Inspection Programs |
gl80100 |
11/24/1980 |
Appendix R to 10 CFR 50 Regarding Fire
Protection-Federal Register Notice |
gl80099 |
11/20/1980 |
Technical Specification Revisions For
Snubber Surveillance |
gl80098 |
11/21/1980 |
IEB 80-24 Prevention Of Damage Due To
Water Leakage Inside Containment |
gl80097 |
11/14/1980 |
IEB 80-23 Failures Of Solenoid Valves
Manufactured By Valcor Engineering Corporation
|
gl80096 |
11/14/1980 |
Fire Protection |
gl80095 |
11/13/1980 |
Generic Activity A-10 |
gl80094 |
11/13/1980 |
Emergency Plan |
gl80093 |
11/06/1980 |
Emergency Preparedness |
gl80092 |
11/06/1980 |
IEB 80-21 Valve Yokes Supplied By Malcolm
Foundry Company, Inc. |
gl80091 |
11/04/1980 |
Odyn Code Calculation |
gl80090 |
10/31/1980 |
Post TMI Requirements, NUREG-0737 |
gl80089 |
10/24/1980 |
IEB 79-01b Supplement 3 Environmental
Qualification Of Class 1E Equipment |
gl80088 |
10/21/1980 |
Seismic Qualification Of Auxiliary Feedwater
Systems |
gl80087 |
10/17/1980 |
Notice Of Meeting To Discuss Status Of
EPRI-Proposed Resolution Of The USI A-12
Fracture Toughness Issue |
gl80086 |
10/17/1980 |
Notice Of Meeting To Discuss Final Resolution
Of USI A-12 |
gl80085 |
10/06/1980 |
Implementation Of Guidance From USI A-12
"Potential For LOW Fracture Toughness And
Lamellar Tearing On Component Support |
gl80084 |
10/01/1980 |
BWR Scram System |
gl80083 |
10/01/1980 |
Environmental Qualification Of Safety-Related
Equipment |
gl80082 |
09/30/1980 |
IEB 79-01b Supplement 2 Environmental
Qualification Of Class 1E Equipment |
gl80081 |
09/19/1980 |
Preliminary Clarification Of TMI Action
Plan Requirements - Addendum To 9/5/80 Letter
|
gl80080 |
09/05/1980 |
Preliminary Clarification Of TMI Action
Plan Requirements |
gl80079 |
|
IEB 80-17 Supplement 3 Failures Revealed
By Testing Subsequent To Failure Of Control
Rods To Insert During A Scram At A |
gl80078 |
08/20/1980 |
Mark I Containment Long-Term Program |
gl80077 |
08/15/1980 |
Refueling Water Level |
gl80076 |
08/14/1980 |
Notice Of Forthcoming Meeting With GE
To Discussed Proposed BWR Feedwater Nozzle
Leakage Detection System |
gl80075 |
08/01/1980 |
Lessons Learned Tech Specs |
gl80074 |
08/01/1980 |
Notice Of Forthcoming Meeting With Representatives
Of EPRI To Discuss Program For Resolution
Of USI A-12, Fracture Tough |
gl80073 |
08/01/1980 |
"Functional Criteria For Emergency Response
Facilities", NUREG-0696 |
gl80072 |
07/31/1980 |
Interim Criteria For Shift Staffing |
gl80071 |
|
IEB 80-20 Failures Of Westinghouse Type
W-2 Spring Return To Neutral Control Switches
|
gl80070 |
|
IEB 80-19 Failures Of Mercury-Wetted Matrix
Relays In RPS Of Operating Nuclear Power
Plants Designed By GE |
gl80069 |
|
IEB 80-18 Maintenance Of Adequate Minimum
Flow Through Centrifugal Charging Pumps
Following Secondary Side Helb |
gl80068 |
|
IEB 80-17 Supplement 2 Failures Revealed
By Testing Subsequent To Failure Of Control
Rods To Insert During A Scram At A |
gl80067 |
07/22/1980 |
Scram Discharge Volume |
gl80066 |
07/18/1980 |
IEB 80-17 Supplement 1 Failure Of Control
Rods To Insert During A Scram At A BWR |
gl80065 |
07/11/1980 |
Request For Estimated Construction Completion
And Fuel Load Schedules |
gl80064 |
07/07/1980 |
Scram Discharge Volume Designs |
gl80063 |
|
IEB 80-17 Failure Of Control Rods To Insert
During A Scram At A BWR |
gl80062 |
07/02/1980 |
TMI-2 Lessons Learned |
gl80061 |
07/02/1980 |
TMI-2 Lessons Learned |
gl80060 |
07/02/1980 |
Request For Information Regarding Evacuation
Times |
gl80059 |
06/30/1980 |
Transmittal Of Federal Register Notice
RE Regional Meetings To Discuss Environmental
Qualification Of Elec. Equipment |
gl80058 |
|
IEB 80-16 Potential Misapplication Of
Rosemount Inc. Models 1151/1152 Pressure
Transmitters With "A" Or "D" Output Codes
|
gl80057 |
06/26/1980 |
Further Commission Guidance For Power
Reactor Operating Licenses NUREG-0660 And
NUREG-0694 |
gl80056 |
06/25/1980 |
Commission Memorandum And Order On Equipment
Qualification |
gl80055 |
|
IEB 80-15 Possible Loss Of Hotline With
Loss Of Off-Site Power |
gl80054 |
|
IEB 80-14 Degradation Of Scram Discharge
Volume Capability |
gl80053 |
06/11/1980 |
Decay Heat Removal Capability |
gl80052 |
|
Five Additional TMI-2 Related Requirements
- Erata Sheets To 5/7/80 Letter |
gl80051 |
06/09/1990 |
On-Site Storage Of Low-Level Waste |
gl80050 |
06/05/1980 |
Generic Activity A-10 BWR Cracks |
gl80049 |
06/03/1980 |
Nuclear Safeguards Problems |
gl80048 |
05/22/1980 |
Revision To 5/19/80 Letter On Fire Protection
|
gl80047 |
05/20/1980 |
Additional Guidance On "Potential For
Low Fracture Toughness And Laminar Tearing
On PWR SG Reactor Coolant Pump Suprts |
gl80046 |
05/19/1980 |
Generic Technical Activity A-12 Fracture
Toughness |
gl80045 |
05/19/1980 |
Fire Protection Rule |
gl80044 |
05/14/1980 |
Reorganization Of Functions And Assignments
Within ONRR/SSPB |
gl80043 |
05/12/1980 |
IEB 80-13 Cracking In Core Spray Spargers
|
gl80042 |
05/09/1980 |
IEB 80-12 Decay Heat Removal System Operability
|
gl80041 |
05/09/1980 |
Summary Of Meetings Held On April 22 &23,
1980 With Representatives Of The Mark I
Owners Group |
gl80040 |
05/08/1980 |
Transmittal Of NUREG-0654 "Report Of The
B&O Task Force"And Appropriate NUREG-0626
"Generic Eval Of FW Transient And Sbl |
gl80039 |
|
IEB 80-11 Masonry Wall Design |
gl80038 |
05/07/1980 |
Summary Of Certain Non-Power Reactor Physical
Protection Requirements |
gl80037 |
05/07/1980 |
Five Additional TMI-2 Related Requirements
To Operating Reactors |
gl80036 |
|
IEB 80-10 Contamination Of Non-Radioactive
System And Resulting Potential For Unmonitored,
Uncontrolled Release To Envir |
gl80035 |
04/25/1980 |
Effect Of A DC Power Supply Failure On
ECCS Performances |
gl80034 |
04/25/1980 |
Clarification Of NRC Requirements For
Emergency Response Facilities At Each Site
|
gl80033 |
04/24/1980 |
Actions Req. From OL Applicants Of B&W
Designed NSSS Resulting From NRC B&O
Task Force Review Of TMI2 Accident |
gl80032 |
04/21/1980 |
Information Request On Category I Masonry
Walls Employed By Plants Under CP and OL
Review |
gl80031 |
|
IEB 80-09 Hydramotor Actuator Deficiencies
|
gl80030 |
04/10/1980 |
Clarification Of The Term "Operable" As
It Applies To Single Failure Criterion For
Safety Systems Required By TS |
gl80029 |
04/07/1980 |
Modifications To Boiling Water Reactor
Control Rod Drive Systems |
gl80028 |
04/07/1980 |
IEB 80-08 Examination Of Containment Liner
Penetration Welds |
gl80027 |
04/04/1980 |
IEB 80-07 BWR Jet Pump Assembly Failure
|
gl80026 |
03/28/1980 |
Qualifications Of Reactor Operators |
gl80025 |
03/13/1980 |
IEB 80-06 Engineering Safety Feature (ESF)
Reset Controls |
gl80024 |
03/12/1980 |
Transmittal Of Information On NRC "Nuclear
Data Link Specifications" |
gl80023 |
03/11/1980 |
Change Of Submittal Date For Evaluation
Time Estimates |
gl80022 |
03/10/1980 |
Transmittal Of NUREG-0654 "Criteria For
Preparation And Evaluation Of Radiological
Emergency Response Plans And Prepared |
gl80021 |
03/10/1980 |
IEB 80-05 Vacuum Condition Resulting In
Damage To Chemical Volume Control System
Holdup Tanks |
gl80020 |
03/10/1980 |
Actions Req.. From OL Applicants Of NSSS
Designs By W and CE Resulting From NRC B&O
Task Force Review Of TMI2 Accident |
gl80019 |
03/10/1980 |
Resolution Of Enhanced Fission Gas Release
Concern |
gl80018 |
03/06/1980 |
Crystal River 3 Reactor Trip From Approximately
100% Full Power |
gl80017 |
03/04/1980 |
Modifications To Boiling Water Reactor
Control Rod Drive Systems |
gl80016 |
02/29/1980 |
IEB 79-01b Environmental Qualification
Of Class 1E Equipment |
gl80015 |
02/28/1980 |
Request For Additional Management And
Technical Resources Information |
gl80014 |
02/23/1980 |
LWR Primary Coolant System Pressure Isolation
Valves |
gl80013 |
02/21/1980 |
Qualification Of Safety Related Electrical
Equipment |
gl80012 |
02/08/1980 |
IEB 80-04 Analysis Of A PWR Main Steam
Sine Break With Continued Feedwater Addition
|
gl80011 |
01/31/1980 |
IEB 80-03 Loss Of Charcoal From Standard
Type II, 2 Inch, Tray Absorber Cells |
gl80010 |
02/05/1980 |
Issuance Of NUREG-0588, "Interim Staff
Position On Equipment Qualifications Of
Safety-Related Electrical Equipment |
gl80009 |
01/29/1980 |
Low Level Radioactive Waste Disposal |
gl80008 |
01/21/1980 |
IEB 80-02 Inadequate Quality Assurance
For Nuclear Supplied Equipment |
gl80007 |
|
Information Regarding The Program For
Environmental Qualification Of Safety-Related
Electrical Equipment |
gl80006 |
01/18/1980 |
Issuance Of NUREG-0313, Rev 1, "Technical
Report On Material Selection And Processing
Guidelines For BWR Coolant Pressur |
gl80005 |
01/14/1980 |
IEB 79-01b Environmental Qualification
Of Class 1E Equipment |
gl80004 |
01/11/1980 |
IEB 80-01 Operability Of ADS Valve Pneumatic
Supply |
gl80003 |
01/10/1980 |
BWR Control Rod Failures |
gl80002 |
01/07/1980 |
Quality Assurance Requirements Regarding
Diesel Generator Fuel Oil |
gl80001 |
01/03/1980 |
NUREG-0630 " Cladding, Swelling And Rupture
- Models For LOCA Analysis" |