File Name |
Date |
Description |
gl81037 |
12/29/1981 |
ODYN Code Reanalysis Requirements |
gl81040 |
12/16/1981 |
Qualifications of Reactor Operators |
gl81039 |
11/30/1981 |
NRC Volume Reduction Policy |
gl81038 |
11/10/1981 |
Storage of Low Level Radioactive Wastes
at Power Reactor Sites |
gl81036 |
09/29/1981 |
Revised Schedule for Completion of TMI
Action Plan Item II.D.1, Relief and Safety
Valve Testing |
gl81034 |
08/31/1981 |
Safety Concerns Associated With Pipe Breaks
in the BWR Scram System |
gl81035 |
08/31/1981 |
Safety Concerns Associated With Pipe Breaks
in the BWR Scram System |
gl81033 |
|
Technical Specification for Station Batteries
Multiplant Action |
gl81032 |
08/07/1981 |
NUREG-0737, Item II.K.3.44-Evaluation
of Anticipated Transients Combined With
Single Failure |
gl81029 |
08/07/1981 |
Simulator Examinations |
gl81031 |
|
Small Break LOCA Confirmatory Integral
Systems Experiments for B&W Designed
Plants |
gl81030 |
07/31/1981 |
Safety Concerns Associated With Pipe Breaks
in the BWR Scram System |
gl81028 |
07/31/1981 |
Steam Generator Overfill |
gl81026 |
07/14/1981 |
Licensing Requirements for Pending Construction
Permit and Manufacturing License Applications
|
gl81027 |
07/09/1981 |
Privacy and Proprietary Material in Emergency
Plans |
gl81023a |
07/06/1981 |
INPO Evaluation Reports |
gl81025 |
06/15/1981 |
Change in Implementing Schedule For Submission
and Evaluation of Upgraded Emergency Plans
|
gl81024 |
06/15/1981 |
Multi-Plant Issue B-56 Control Rods Fail
To Fully Insert |
gl81023 |
06/04/1981 |
INPO Plant Specific Evaluation Reports
|
gl81016 |
06/01/1981 |
NUREG-0737 Item I.C.1 SER on Abnormal
Transient Operating Guidelines (ATOG) |
gl81013 |
05/28/1981 |
SER For GEXL Correlation For 8X8R Fuel
Reload Applications For Appendix D Submittals
of The GE Topical Report |
gl81022 |
05/05/1981 |
Engineering Evaluation of The H.B. Robinson
Reactor Coolant System Leak on 1/29/81 |
gl81021 |
05/05/1981 |
Natural Circulation Cooldown |
gl81001 |
05/04/1981 |
Qualification of Inspection, Examination,
Testing and Audit Personnel |
gl81019 |
04/20/1981 |
Thermal Shock to Reactor Pressure Vessels
|
gl81020 |
04/10/1981 |
Safety Concerns Associated With Pipe Breaks
in The BWR Scram System |
gl81018 |
03/30/1981 |
BWR Scram Discharge System-Clarification
of Diverse Instrumentation Requirements
|
gl81015 |
03/10/1981 |
Environmental Qualification of Class 1E
Electrical Equipment-Clarification of Staffs
Handling of Proprietary Information |
gl81017 |
03/05/1981 |
Functional Criteria for Emergency Response
Facilities |
gl81011 |
02/29/1981 |
BWR Feedwater Nozzle and Control Rod Drive
Return Line Nozzle Cracking (NUREG-0619)
|
gl81003 |
02/26/1981 |
Implementation of NUREG-0313,Technical
Report on Material Selection& Processing
GL For BWR Coolant Press Boundary Piping
|
gl81006 |
02/26/1981 |
Periodic Updating of Final Safety Analysis
Reports (FSARS) |
gl81004 |
02/25/1981 |
Emergency Procedures And Training For
Station Blackout Events |
gl81012 |
02/20/1981 |
Fire Protection Rule (45 FR 76602, 11/19/80)
|
gl81010 |
02/18/1981 |
Post-TMI Requirements For The Emergency
Operations Facility |
gl81014 |
02/10/1981 |
Seismic Qualifications for Auxiliary Feedwater
Systems |
gl81007 |
02/03/1981 |
Control of Heavy Loads |
gl81008 |
01/29/1981 |
Odyn Code |
gl81002 |
01/27/1981 |
Analysis, Conclusions and Recommendations
Concerning Operator Licensing |
gl81009 |
01/23/1981 |
BWR Scram Discharge System |
gl81005 |
01/19/1981 |
Information Regarding The Program For
Environmental Qualification Of Safety-Related
Electrical Equipment |