File
Name |
Date |
Description |
gl96007 |
12/05/1996 |
Interim Guidance on Transportation of
Steam Generators |
gl96006s1 |
11/13/1997 |
NRC Generic Letter 96-06, Supplement 1:
Assurance of Equipment Operability and Containment
Integrity During Design-Basis Accident Conditions |
gl96006 |
09/30/1996 |
Assurance of Equipment Operability and
Containment Integrity During Design-Basis
Accident Conditions |
gl96005 |
09/18/1996 |
Periodic Verification of Design-Basis
Capability of Safety-Related Power-Operated
Valves |
gl96004 |
06/26/1996 |
Boraflex Degradation in Spent Fuel Pool
Storage Racks |
gl96002 |
02/13/1996 |
Reconsideration of Nuclear Power Plant
Security Requirements Associated with an
Internal Threat |
gl96003 |
01/31/1996 |
NRC Generic Letter 96-03: Relocation of
the Pressure Temperature Limit Curves and
Low Temperature Overpressure Protection
System Limits |
gl96001 |
01/10/1996 |
Testing of Safety-Related Circuits |