Printing Note: Some documents contain pages of various sizes and orientation. You may need to use printer settings such as "scale to fit" or "auto landscape-portrait."
Collapse All Expand All
County/ Project
|
Proposed Action
|
Notices & Documents
|
Date Issued
|
Date Due
|
District Wide
|
Gulf Regional Biological Opinion
|
Coastal Dredging and Construction, Gulf of Mexico (National Marine Fisheries Service)
|
Gulf Regional Biological Opinion
-2003 Original Opinion
-2005 revision
-2007 revision
-Management Protocol, revision 1, Apr 2010
|
|
|
South Atlantic Regional Biological Opinion |
Coastal Dredging and Construction, South Atlantic Coast (National Marine Fisheries Service) |
South Atlantic Regional Biological Opinion
-1991 (original opinion)
-1995
-April 1997
-November 1997
-South Atlantic Division Protocol |
|
|
Updated-Statewide Programmatic Biological Opinion (2015-SPBO) |
Beach Placement and Shore Protection, Coast of Florida |
2015-SPBO |
March 13 2015 |
|
2011-Statewide Programmatic Biological Opinion |
Beach Placement and Shore Protection, Coast of Florida |
Statewide Programmatic Biological Opinion, Beach Placement and Shore Protection (Superceded by 2015-SPBO)
Statewide Programmatic Biological Assessment (SPBA) to the U.S. Fish and Wildlife Service
Jacksonville District Commitments in the SPBA
Amendments for 2013 emergency coastal and navigation projects (click on date→) |
Aug 22 2011
Feb 17 2011
Jun 28 2013 (South FL)
Jul 2 2013 (North FL)
Aug 22 2013
|
|
Programmatic Piping Plover Biological Opinion |
Beach and Near Shore Placement and Shore Protection, Peninsula of Florida |
P3BO
Amendments for 2013 emergency coastal and navigation projects (click on date→) |
May 22 2013
Jun 28 2013 (South FL)
Jul 2 2013 (North FL)
|
|
Coastal Dredging and Beach Work in Florida |
SPBO, SARBO,P3BO, GRBO, SAD Protocol, P&S |
Timeline Graphic, 11" X 17" (2-sided) |
March 2015 |
|
Cooperative Agreement on Manatees, Section 112(c) Marine Mammal Protection Act |
Civil Works Activities Affecting Manatees in Florida |
Treatment of Manatees and Coordination with the U.S. Fish and Wildlife Service |
Dec 19 2012 |
|
Manatee Detection |
Demonstration of Commercial Off-the-Shelf Acoustic Technologies |
Technical Note, ERDC TN-DOER-E35 |
Dec 2012 |
|
Wetland Mitigation |
Compliance with Section 2036 WRDA 2007 |
Template for Mitigation Plan or Mitigation Summary |
Aug 2015 |
|
Southwest Florida Comprehensive Watershed Plan |
Comprehensive Watershed Plan a habitat quilt tied by Threads of Water reconnecting a sustainable landscape |
Southwest Florida Comprehensive Watershed Plan |
|
|
|
County/ Project
|
Proposed Action
|
Notices & Documents
|
Date Issued
|
Date Due
|
Puerto Rico
|
Caño Martín Peña |
Final Feasibility Report Delivery Package |
Appendices
A-C National Ecosystem Restoration Benefits Evaluation-Scenario Average Concentrations-Recreation Resources Assessment
D-F Cost Engineering-Adaptive Management Plan-Monitoring Plan
G-Engineering
H-Final Environmental Impact Statement
H1-Essential Fish Habitat Assessment |
February 2016 |
|
Fort San Geronimo, CAP 103 |
Coastal Storm Damage Reduction |
Final Mitigation Plan |
Feb 2011 |
|
Rio Culebrinas, Flood Control, Section 204 CAP |
Detailed Project Report |
Main Text
EA
Appendices
- A, Hydrology & Hydraulics
-B, Geotechnical
-C, Design & Cost
-D, Real Estate
-E, Economics
|
June 2004 |
|
|
|
Application for Coastal Zone Consistency Concurrence |
Oct 16 2014 |
|
San Juan Harbor Navigation Project |
Mitigation |
Final FONSI
Final EA
-Through Append D
-Append E,
Geotech
High Res drawings (11"X17")
|
Mar 2 2015 |
|
|
Ocean Dredged Material Disposal Site (ODMDS) |
Site Management and Monitoring Plan (SMMP) |
Jan 6 2011 |
|
|
Feasibility Study and EIS |
Notice of Intent and Public Scoping Meeting
Annouce, Public Scoping Meeting
Anuncio, Reunión de Consulta Publica
|
Sep 28 2015 -
Oct 1 2015 -
Oct 1 2015
|
|
Rio Puerto Nuevo Flood Control Project |
|
Revised Mitigation Plan
Project Plans |
Mar 2014
2003 |
|
Highway 187, Piñones |
|
New Mitigation Plan
Letter to Agencies
|
Sep 2013
Oct 2 2013
|
|
Rio de la Plata, Flood Risk Management |
Wetland Delineation and Mitigation |
-Wetland Delineation (170MB)
-Wetland Boundary Map (35MB)
-Mitigation Assessment and Permit Documents
-Monitoring, Initial
-Monitoring, 6-months
-Project Plan View (2015) |
2008
2008
2008
|
|
Section 408 Alterations |
Low-Impact Alterations to USACE Federally Authorized Civil Works Projects Conducted by Non-Federal or Independent Requestors |
FONSI
Programmatic EA |
|
|
Antilles Building |
Real Estate Disposal |
Draft EA and FONSI
NOA English
NOA Espanol |
Oct 11 2016 |
Nov 10 2016 |
|
County/ Project
|
Proposed Action
|
Notices & Documents
|
Date Issued
|
Date Due
|
U.S. Virgin Islands
|
There is currently no content in this section.
|
|
|
|
|
|
Collapse All Expand All
County/ Project
|
Proposed Action
|
Notices & Documents
|
Date Issued
|
Date Due
|
Other Locations
|
Canaveral Harbor, Section 203 Report
|
Sponsor prepared study for harbor improvements
|
- Report and EA
- FONSI
APPENDICES
(link to GPO.gov)
|
December 2012
July 11, 2013
|
|
Brevard County Hurricane and Storm Damage Reduction Project |
Mid-Reach Segment, Integrated General Reevaluation Report (GRR) and EIS |
Scoping Letter, Truck Haul
Record of Decision
Director's Report
Department Army Permit and Statement of Findings
Addendum to GRR/EIS
Final GRR/EIS
Appendices
-A, Engineering Design and Cost
-B, Socio-Economics
-C, Real Estate
-D, Public Use Determination and Cost Allocation
-E, Geotechnical
-F, Section 404(B) Evaluation
-G, Coastal Zone Consistency
-H, Fish and Wildlife Coordination Act Report
-I, Pertinent Correspondence and Mailing List
-J, Cumulative Effects Assessment
-K, Environmental Documentation
-L, Public Workshop Correspondence
-M, Value Engineering
|
Feb. 11, 2015
Sept. 8, 2014
Aug. 17, 2012
March 2014
April 2011
|
March 13, 2015 |
Mid-Reach Segment (Hurricane and Storm Damage Reduction Project) |
Proposed Use of Upland Quarries as an Additional Source of Sand |
FONSI
EA w/ Appendices A and B
Appendix C-Pertinent Public Correspondence
Appendix D-Agency Documents
|
Aug 4 2016 |
|
|
County/ Project
|
Proposed Action
|
Notices & Documents
|
Date Issued
|
Date Due
|
Broward County
|
Port Everglades O&M
|
Maintenance Dredging
|
- EA
|
Nov 2003
|
|
Port Everglades O&M |
Maintenance Dredging |
- EA - EA, Appendices D-E |
May 2005 |
|
Port Everglades |
Port Everglades and Palm Beach Harbor, Ocean Dredged Material Disposal Site (ODMDS) |
Final EIS |
Jul 2004 |
|
Port Everglades |
Ocean Dredged Material Disposal Site (ODMDS) |
Draft EA |
Aug 27 2013 |
|
Port Everglades Feasibility Study |
Final Feasibility Study |
-Main Text |
Mar 20 2015 |
|
Port Everglades Feasibility Study |
Final EIS |
Record of Decision
Main Text
Appendices
-A, Correspondence -B, 404(b) evaluation -C, CZM consistency
-D, Natural Resources Baseline Report, 2001 Benthic and Fish, 2009 Acropora Coral, 2010 Seagrass, 2009 Seagrass, 2006 Seagraqss, 2013
E-Mitigation Plan
F, ESA consultation
-G, Coordination Act
-H, NOAA Fisheries Coordination, EFH
-I, Historic Preservation
-J, HTRW
-K, mailing list
-L Comments on Draft and Final EIS
|
Jan 2016 |
|
|
Feasibility Study, Appendices |
A, Engineering B, Economics C, Real Estate D, Correspondence E, Dredged Material Management Plan F, Cost
|
|
|
Broward County Shore Protection Project |
Segment II, FCCE |
Final FONSI/EA |
Aug 3 2013 |
na |
|
Segment II, LRR |
Signed FONSI
Final EA
|
Oct 27 2015 |
|
Everglades Restoration Transition Plan (ERTP) |
Supplemental Biological Assessment |
Main Text Appendices -A Biological Assessment of October 2010. -B Annual Assessments, 2010 - 2015. -C Environmental Assessment. G-3273 Constraint Relaxation/ S-356 Field Test and S-357N Operational Strategy. -D Conveyance System Operational Guidance. -E Timeline. Modified Water Deliveries, Everglades National Park and Canal 111. |
Jul 24 2015 |
|
Temporary Emergency Deviation WCA 3A |
Environmental Assessment and FONSI |
Environmental Assessment and Appendices
Notice of Availability
|
Feb 122016 |
Mar 18 2016 |
Temporary Emergency Deviation WCA 3A
|
Supplemental Environmental Assessment and FONSI
|
Notice of Availability
Supplemental Environmental Assessment and FONSI
Appendices
A-Operational Strategy
B-Coastal Zone Consist
C-Pertinent Correspon.
D-Additional Info.
|
May 10 2016 |
|
Temporary Emergency Deviation to Alleviate High Water Levels in Water Conservation Area 3A (S-344 Deviation) |
Environmental Assessment and Finding of No Significant Impact |
Notice of Availability
EA and FONSI
Appendices
A-Operational Strategy
B-Coastal Zone
C-Pertinent Correspon
|
Apr 18 2016 |
May 18 2016 |
|
County/ Project
|
Proposed Action
|
Notices & Documents
|
Date Issued
|
Date Due
|
Other Locations
|
Naples to Gordon Pass, Florida
|
Maintenance Dredging
|
Draft EA
Draft FONSI
Final EA/FONSI
|
March 2013
March 28, 2013
July 24, 2013
|
|
Picayune Strand Restoration Project |
Design Refinements -larger area
-tieback levee for pump stations
-manatee mitigation feature |
EA/FONSI |
November 2014 |
|
|
County/ Project
|
Proposed Action
|
Notices & Documents
|
Date Issued
|
Date Due
|
Other Locations
|
Miami Harbor
|
GRR, Phase III, Feasibility Study
|
Study and EIS Vol 1, Append A-H Vol 1, Append I-M Vol 2, Append A-C Vol 2, Append D-F
|
Feb 2004
|
|
Miami Harbor Deepening |
|
-Incidental Harassment Authorization, Marine Mammal Protection Act -Biological Opinion, NMFS |
Jul 31 2012
Sep 8 2011
|
|
Miami Harbor |
Ocean Dredged Material Disposal Site (ODMDS) |
- Final EIS - Site Monitoring and Management Plan - Site Monitoring and Management Plan, Revised |
August 1995
September 2008 &2011
|
|
Dade County Beach, Section 227 |
National Shoreline Erosion Control Development and Demonstration Program, Submerged Artificial Reef Training Structure |
EA/FONSI |
Feb 24 2011 |
|
Dade County Beach Erosion Control and Hurricane Protection |
Final Environmental Assessment and Limited Reevaluation Report |
FONSI
EA
Main Report(LRR)
Appendices
A-Engineering
B-Cost
C1-Cost(Haulover)
C2-Cost(Sunny Isles)
D-Geotechnical
E-RealEstate
F-Public Access
G-Correspondence
Southeast Florida Sediment Assessment and Needs Determination (SAND) Study (link 90MB)
|
Mar 8, 2016
Sep 2014
|
|
Central and Southern Florida, 2012 Water Control Plan, Water Conservation Areas, Everglades National Park, and ENP South Dade Conveyance System |
Temporary Deviation from Constraint at Water Gauge G-3273 |
Draft FONSI/EA
Notice of Availability
|
Aug 2013
Aug 22 2013
|
Sep 21 2013 |
Central and Southern Florida |
G-3273 Constraint Relaxation/S356 Field Test and S-357N Operational Strategy |
Notice of Availability Final EA/FONSI Appendices -A, Operational Strategy -B, Coastal Zone Consistency -C, Monitoring Plan -D1, Correspondence -D2, Correspondence
|
Feb 2004
May 2015
2015
|
Apr 5 2015 |
Modified Water Deliveries |
8.5 Square Mile Area |
Record of Decision |
Dec 6 2000 |
|
Interim Operation Plan |
Final Supplemental Environmental Impact Statement (SEIS) |
-Cover EIS -Final SEIS -Figures Appendices -A Court Order -B Scoping Documents -C Engineering -D Hydrograph WCA3A -E 404(b) Evaluation -F ESA Coordination -G Gov to Gov Coord -H Duke Declaration -I CommentsResponse Record of Decision |
Dec 22 2006 |
Feb 5 2007 |
Canal C-111 |
Expansion of Detention Area and Associated Features |
EA and FONSI |
Jun 6 2012 |
|
Canal C-111 South Dade |
Modifications to the C-111 South Dade North and South Detention Areas and Associated Features |
Final EA and Signed FONSI
Appendices -A Biological Assessment -B 404(b) Evaluation -C CZMA -D Pertinent Correspondence |
Dec 07 2016 |
|
|
C-111 South Dade Environmental Assessment and Proposed Finding of No Significant Impact: Modifications to the C-111 South Dade Project, L-31W |
Environmental Assessment
Appendices
A-Biological Assessment
B-Sec 404(b) CWA Eval
C-CZMA
D-Correspondence |
Jul 2 2016 |
Aug 31 2016 |
|
GRR and EIS |
Main Text List Annex/Append Annexes -A -B through E -F through I Appendices -A through C -D through F
|
1994 |
|
C&SF, CERP, WCA 3 |
Decompartmental-ization, Physical Model |
Notice of Availability Supplemental FONSI Correspondence with Fish and Wildlife Service |
May 20 2015
Jul 8 2015
|
Jun 18 2014 |
Everglades Restoration Transition Plan (ERTP) |
Supplemental Biological Assessment |
Main Text Appendices -A Biological Assessment of October 2010. -B Annual Assessments, 2010 - 2015. -C Environmental Assessment. G-3273 Constraint Relaxation/ S-356 Field Test and S-357N Operational Strategy. -D Conveyance System Operational Guidance. -E Timeline. Modified Water Deliveries, Everglades National Park and Canal 111. |
Jul 24 2015 |
|
Temporary Emergency Deviation WCA 3A |
Environmental Assessment and FONSI |
Environmental Assessment and Appendices Notice of Availability
|
Feb 12 2016 |
Mar 18 2016 |
Temporary Emergency Deviation WCA 3A
|
Supplemental Environmental Assessment and FONSI
|
Notice of Availability
Supplemental Environmental Assessment and FONSI
Appendices
A-Operational Strategy
B-Coastal Zone Consist
C-Pertinent Correspon.
D-Additional Info.
|
May 10 2016
|
|
Temporary Emergency Deviation to Alleviate High Water Levels in Water Conservation Area 3A (S-344 Deviation) |
Environmental Assessment and Finding of No Significant Impact |
Notice of Availability
EA and FONSI
Appendices
A-Operational Strategy
B-Coastal Zone
C-Pertinent Correspon
|
Apr 18 2016 |
May 18 2016 |
Mt. Sinai Medical Center, Continuing
Authority Program (CAP), Section 14 |
Mt. Sinai Medical Center, CAP, Section 14, Draft Integrated Feasibility Report and Environmental Assessment |
Main Report
Appendices
A-Engineering
B-Cost
C-Pertinent
Correspondence
D1-404b
D2-CZM
D3-EnvSurveys
D4-RealEstate
|
|
Nov 28 2016 |
|
County/ Project
|
Proposed Action
|
Notices & Documents
|
Date Issued
|
Date Due
|
Other Locations
|
|
|
|
|
|
|
County/ Project
|
Proposed Action
|
Notices & Documents
|
Date Issued
|
Date Due
|
Other Locations
|
Jacksonville Harbor O&M
|
Huguenot Park Lease Renewal
|
|
December 2012
2008
|
|
|
Bartram Island, Cell A, Erosion Control |
Public Notice
EA/FONSI |
Feb. 21, 2014 |
March 10, 2014 |
Jacksonville Harbor, Draft Navigation Study, GRR2 |
Pre-Report Presentations, 2012 |
Overview
- Ecological and Water Quality Modeling
- Circulation and Salinity Modeling
- Water Quality Modeling
- Ecological Modeling, Preliminary |
Oct. 22, 2012 |
|
Jacksonville Harbor, Final Navigation Study, GRR2 |
Final GRR2 and Supplemental EIS |
Final Main Text
Record of Decision |
March 7, 2014 |
April 7, 2014 |
|
Appendices |
A, Engineering
B, Economics
C, Real Estate
D, Ecological Models
- main text
- Appendices
E, Affects & Mitigation
F, Pertinent Correspondance (scoping)
G, CZM Consistency
H, 404(b) evaluation
I, Air Emissions
J, DMMP
K, Comments (on draft)
- 1 Response to Comments
- 2 NGO comments
- 3 Public comments A
- 4 Public comments B
- 5 Agency comments
L, EFH Report
M, Coordination Act Report (CAR)
N, Cost |
|
|
|
|
Report Submitted for transmission to Congress |
April 16, 2014 |
|
|
Salinity Effects on Nekton, Florida Fish and Wildlife Conservation Commission |
Report |
June 25, 2013 |
|
|
Environmental Fluid Dynamics Code (EFDC) model
|
Literature Review, EFDC Model Application
-Question EFDC |
Nov. 6, 2014
November 2014
|
|
Jacksonville Harbor ODMDS |
Public Meeting |
Posters
- Overview
- Sidescan
- Analysis
- Site Designation
Meeting Presentation
|
June 21, 2012 |
|
|
Draft EIS |
Main Text
Appendices |
May 25, 2012 |
July 9, 2012 |
Jacksonville Harbor, Mile Point |
Navigation Study, Final Report and EA |
Main Report
Appendices
- A
- B through F
- G through H
|
March 2012 |
|
Duval County Beach Erosion Control Project |
Environmental Statement
|
Final |
August 1974 |
|
|
Section 934 Study |
Supplement to Reevaluation Report
Supplement to Reevaluation Report |
January 1992 |
|
|
Environmental Assessment |
with MMS FONSI of 3 May 1995 |
Dec. 22, 1993 |
|
|
Environmental Assessment |
with FONSI |
Jan. 27, 2005 |
|
|
BOEM EA on use of OCS Sand |
with BOEM FONSI of 4 Feb 2011 (link to boem.gov) |
January 2011 |
|
|
New Borrow Site, BOEM as Cooperating Agency |
Withdraw Notice of Draft FONSI |
Sept. 18, 2014 |
|
|
New Borrow Site |
Final EA and Signed FONSI |
Oct. 1, 2015 |
|
U.S. Marine Corps Support Facility, Blount Island |
Removal of Concrete Sill and Advance Maintenance Dredging Slipway |
Environmental Assessment and FONSI |
April 2010 |
|
|
County/ Project
|
Proposed Action
|
Notices & Documents
|
Date Issued
|
Date Due
|
Other Locations
|
Okeechobee Waterway
|
Lease for RV Park, Moore Haven Lock
|
EA/FONSI
|
Feb. 12, 2014
|
March 14, 2014
|
Herbert Hoover Dike (HHD) |
Herbert Hoover Dike, Dam Safety Modification Study: Glades, Hendry, Martin, Okeechobee, and Palm Beach Counties, FL |
Draft EIS (Main Text)
Appendices
|
Dec. 24, 2015 |
Feb. 7, 2016 |
Lake Hicpochee Shallow Storage and Hydrologic Enhancement |
Lake Hicpochee, 408 Public Notice
|
Public Notice |
Apr 29 2016 |
|
Lake Okeechobee Watershed Project |
Scoping Letter |
Final Scoping Letter
|
Jun 28 2016 |
|
|
County/ Project
|
Proposed Action
|
Notices & Documents
|
Date Issued
|
Date Due
|
Other Locations
|
|
|
|
|
|
|
County/ Project
|
Proposed Action
|
Notices & Documents
|
Date Issued
|
Date Due
|
Other Locations
|
Tampa Harbor O&M
|
Maintenance Dredging
|
|
Oct. 7, 2011
|
|
|
Tampa Harbor Dredged Material Management Plan Update |
DMMP Update |
April 8, 2011 |
|
Tampa Harbor, Big Bend |
Improvements and Maintenance Dredging |
|
May 2014 |
|
|
County/ Project
|
Proposed Action
|
Notices & Documents
|
Date Issued
|
Date Due
|
Other Locations
|
Ft. Myers Beach, Matanzas Pass, Navigation Project
|
Maintenance Dredging
|
EA/FONSI
|
Sept. 20, 2012
|
|
Lee County Shore Protection Project |
Captiva Island, FCCE |
Final FONSI and Notice of Availability |
March 11, 2013 |
|
Lee County Shore Protection Project |
Captiva Island, FCCE |
|
March 27, 2013 |
|
Lee County Shore Protection Project |
Captiva and Sanibel Islands |
FONSI |
Feb. 2, 1996 |
|
Gasparilla Island Segment, Lee County, Shore Protection Project |
934 Report and Environmental Assessment |
Main Report
Draft FONSI
Appendices
A-Engineering
B-Cost Engineering
C-Economics
D-Geotechnical
E-Real Estate Plan
F-Cost Sharing
G-Environmental
|
Oct 2016 |
Dec 23 2016 |
|
County/ Project
|
Proposed Action
|
Notices & Documents
|
Date Issued
|
Date Due
|
Other Locations
|
Herbert Hoover Dike (HHD)
|
Herbert Hoover Dike, Dam Safety Modification Study: Glades, Hendry, Martin, Okeechobee, and Palm Beach Counties, FL
|
Draft EIS (Main Text)
Appendices
|
Dec. 24, 2015
|
Feb. 7, 2016
|
St. Lucie Inlet Intracoastal Waterway and Okeechobee Waterway |
Placement of Intracoastal Waterway and Okeechobee Waterway Dredged Material in the St. Lucie Inlet Sediment Impoundment Basin |
St. Lucie IWW Crossroads Final EA w/ Signed FONSI |
Jan. 2016 |
|
Dredged Material Management Area Construction O-7 |
Intracoastal Waterway, Martin Co. |
EA w/ Signed FONSI |
February 29, 2016 |
|
Lake Okeechobee Watershed Project |
Scoping Letter |
Final Scoping Letter |
Jun 28 2016 |
|
Martin County Shore Protection Project |
Martin County FCCE Nourishment |
2011 LRR and EIS
1994 GDM w/ EA Part 1
1994 GDM w/ EA Part 2
1986 Feasibility w/ EIS
|
|
|
|
County/ Project
|
Proposed Action
|
Notices & Documents
|
Date Issued
|
Date Due
|
Other Locations
|
|
|
|
|
|
|
County/ Project
|
Proposed Action
|
Notices & Documents
|
Date Issued
|
Date Due
|
Other Locations
|
Herbert Hoover Dike (HHD)
|
Herbert Hoover Dike, Dam Safety Modification Study: Glades, Hendry, Martin, Okeechobee, and Palm Beach Counties, FL
|
Draft EIS (Main Text)
Appendices
|
Dec. 24, 2015
|
Feb. 7, 2016
|
|
County/ Project
|
Proposed Action
|
Notices & Documents
|
Date Issued
|
Date Due
|
Other Locations
|
Palm Beach Harbor
|
Port Everglades and Palm Beach Harbor, Ocean Dredged Material Disposal Site (ODMDS)
|
Final EIS
|
July 2004
|
|
Palm Beach Harbor, Lake Worth Inlet |
Operations and Maintenance (O&M) |
FONSI
EA |
Oct 13, 2015 |
|
Lake Worth Inlet, Palm Beach Harbor |
Final Feasibility Report and Environmental Impact Statement |
Main Text
Errata
Appendices
A-Engineering
-A1, Plates
-A2, Hydrodynamic Modeling, Ship Simulation, Geotechnical, and Value Engineering
-A3, Boring Logs and Laboratory Results
B-Cost Engineering and Risk Analysis and C, Socio-Economics
D-Environmental
E-Correspondence
-E1, Agency and Tribe
-E2, 9 May 2013 Public Meeting, Comment and Response Tables, Public Comments
-E3, Public Comments Continued
F, Real Estate and G, Preliminary Assessment, Dredged Material Management
|
Feb. 7, 2014 |
March 10, 2014 |
Palm Beach County Shore Protection Project |
Jupiter-Carlin Segment, FCCE |
EA and FONSI |
July 25, 2013 |
|
Palm Beach County Shore Protection Project |
North Boca Raton, Delray Beach, and Ocean Ridge |
EA/FONSI
Signed FONSI
|
Aug. 16, 2013
Aug. 16, 2013
|
|
Herbert Hoover Dike (HHD) |
Supplemental Major Rehabilitation Report |
Final EA and FONSI |
June 15, 2015 |
|
|
Herbert Hoover Dike, Dam Safety Modification Study: Glades, Hendry, Martin, Okeechobee, and Palm Beach Counties, FL |
Draft EIS (Main Text)
Appendices |
Dec. 24, 2015 |
Feb. 7, 2016 |
|
County/ Project
|
Proposed Action
|
Notices & Documents
|
Date Issued
|
Date Due
|
Other Locations
|
Pinellas County Shore Protection Project
|
Sand Key
|
EA
|
May 5, 2011
|
|
Pinellas County Shore Protection Project |
Treasure Island FCCE nourishment |
Notice of Availability Final FONSI |
April 10, 2013 |
|
Pinellas County Shore Protection Project |
Treasure Island and Long Key FCCE and Supplemental |
Signed FONSI |
June 17, 2013 |
|
Pinellas County Beach Erosion Control Project |
Sand Key, Treasure Island, and Long Key Nourishment |
EA |
June 9 2003 |
|
|
County/ Project
|
Proposed Action
|
Notices & Documents
|
Date Issued
|
Date Due
|
Other Locations
|
Sarasota County Beach Erosion Control
|
Venice Beach
|
NOA draft FONSI/EA
EA through Append B
EA, Appendices C-E
|
April 15, 2014
|
May 15, 2014
|
|
|
Final EA and FONSI |
July 2, 2014 |
|
|
Lido Key |
EA and Feasibility Report
- main text w/2004 addendum
- Environmental Assessment
- Appendices |
Oct. 2002 with April 2004 addendum
|
|
|
|
Study of Big Sarasota Pass Sediment Mining Alternatives, Draft
GENESIS Shoreline Modeling Study
|
June 11, 2014
May 2014
|
|
|
Lido Key Additional Sand Sources |
EA through Appendix F
Appendix G, Mining Alternatives Study
Appendix H, Sediment Compatibility Analysis
|
March 30, 2015 |
May 14, 2015 |
|
|
Notice of Availability, FONSI/EA |
March 30, 2015 |
May 14, 2015 |
|
County/ Project
|
Proposed Action
|
Notices & Documents
|
Date Issued
|
Date Due
|
Other Locations
|
Ponce de Leon Inlet, Operations and Maintenance
|
Maintenance Dredging
|
EA
Final EA/FONSI
|
Feb 2013
Jun 26, 2013
|
|
|
|
NOI = Notice of Intent
NOA = Notice of Availability
PN = Public Notice
EIS =Environmental Impact Statement
EA = Environmental Assessment
FONSI = Finding of No Significant Impact
GRR = General Reevaluation Report
LRR = Limited Reevaluation Report
PAC = Post Authorization Change
DDR = Detailed Design Report
EDR = Engineering Design Report
Date Issued = Date of Notice
TBP = To Be Posted
Date Due = Date of Public Meeting, Hearing, or Workshop where applicable. Otherwise, date comments due.
|