Skip Navigation
 
Federal Energy Regulatory Commission





 
Text Size small medium large
NGPA section 311 Pipelines
Multiple metal pipelines

An intrastate pipeline that is not under the Commission’s NGA jurisdiction becomes subject to NGPA section 311(a)(2) if it sells or transports gas to an NGA pipeline, or to a local distribution company that itself takes service from an NGA pipeline. These intrastate pipelines must file with the Commission:


  • Rates and Charges, and
  • A Statement of Operating Conditions (SOC) (tariff) pursuant to section 284.123 External of the Commission's regulations.


Constructing a Rate Filing - State Rate Election Standards     Constructing a Rate Filing – Cost of Service Rate Standards

Constructing a Rate Filing
- Market Based Rate Standards     Statement of Operating Conditions (SOC)

Filing Using eTariff     Reporting Requirements