Required Approvals:
Projects and Statewide Planning Requirements
Required Approvals:
Cost-Effectiveness Determinations and Public-Interest Findings
Required Approvals:
Selecting the Method of Construction: Contract or Force Account
Required Approvals:
Project Advertisement, Bid Review, and Request for Concurrence in Award
Design:
Project Geometric Design Requirements
Preparing the PS&E:
Environmental Requirements
Design:
Value Engineering Requirements for Federal-aid Projects
Design:
Bike and Pedestrian Accommodation
Design:
Pedestrian Accessible Design Requirements
Contract Specifications:
Form FHWA-1273
Contract Specifications:
Patented or Proprietary Products
Contract Specifications:
Buy America Contract Requirements
Preparing the PS&E:
Utility Coordination and Certification Requirements
Preparing the PS&E:
Railroad Coordination and Certification Requirements
Preparing the PS&E:
Right-of-Way Coordination and Certification Requirements
Operations:
Purchasing Intelligent Traffic Systems (ITS) and Traffic Technology
Operations:
Scoping and Conducting a Traffic Study to Meet Community Needs
Manual on Uniform Traffic Control Devices (MUTCD):
Applying the MUTCD to Aid Safety and Reliability
Federal-aid regulations specifically allow deviation from some standard practices through a public interest finding or a determination of cost effectiveness
Companion Resource (PDF, 197 KB) : Includes the printable script for this video
Web Resources: Includes Web links to related Code of Federal Regulations and other links appropriate to this video module.
FHWA guidance (found in Items 17-21) on public-interest findings and other certifications
Examples of FHWA approved public-interest findings and product certifications
FHWA guidlelines for evaluating public-interest fundings for sign sheeting
Feedback | Disclaimer | Contact Us
To view PDF files, you can use the Acrobat® Reader®.